Home VDOT road-work schedule
Local

VDOT road-work schedule

The following is a list of highway work that might affect traffic in the Staunton transportation district during the coming weeks.

Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. Also, when traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

 

ROCKBRIDGE COUNTY

Interstate 64

* Mile marker 57 to 41, eastbound and westbound – Debris removal, Monday to Friday, 8 a.m. to 5 p.m.

 

Interstate 81

* (NEW) Mile marker 173 to 205.1, northbound and southbound – Milling and paving. Lane closures, Monday night to Friday morning, 8 p.m. to 7 a.m.

 

* Mile marker 173 to 205, northbound and southbound – Debris removal, ditch repair, sign work, and rock removal from shoulders. Monday to Friday, 8 a.m. to 5 p.m.

* Mile marker 175 to 195, northbound and southbound – Bridge maintenance on various structures. Single-lane closures, Monday night to Friday morning, 8 p.m. to 7 a.m.

* Mile marker 195.6 to 202.5, northbound – Truck climbing lane project. There are no lane closures on I-81 for the truck climbing lane project this week.

* Various locations – Vegetation management activities. Mobile lane closures, Sunday night to Friday morning, 8 p.m. to 7 a.m.

 

Primary Roads

* (NEW) Route 11 – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* (NEW) Route 39 – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* (NEW) Route 252 (Brownsburg Turnpike) – Project at the bridge over Cedar Grove Branch. This location is 0.50 mile north of Route 712 (Decatur Road) and 0.98 mile south of Route 727 (Hyde Road). Bridge closed beginning June 13. Single-lane detour on temporary road next to the existing bridge. Traffic controlled by stop and proceed sign. Estimated completion is Aug. 2.

* Various roads – Paving, patching, shoulder repairs, ditching, litter pickup, pipe cleaning, pipe replacement, mowing and brush cutting. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

 

Secondary Roads

* (NEW) Various roads – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Various roads – Paving, patching, shoulder repairs, ditching, litter pickup, pipe cleaning, pipe replacement, mowing and brush cutting. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

 

 

HIGHLAND COUNTY

Primary Roads

* (NEW) Route 84 – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* (NEW) Route 220 – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Route 220 – Shoulder repairs. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 220, southbound – Ditching. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 250 – Shoulder repairs. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 250 – Replacement of bridge over Crab Run in McDowell, from 0.01 mile east of Route 645 to 0.014 miles west of Route 654 (Doe Hill Road). Single-lane traffic with 14-foot width restriction and three-way traffic signal at Route 250 and intersection of Route 654. Flagger traffic control at various locations when needed. Work may take place 24 hours-a-day. Speed limit reduced to 25 mph. Estimated completion is October 2012.

* Various roads – Mowing, Monday to Friday, 7:30 a.m. to 3 p.m.

 

Secondary Roads

* Route 615 – Tar and graveling. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* (NEW) Route 619 – Tar and graveling. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* (NEW) Various roads – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Various roads – Patching. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

 

 

AUGUSTA COUNTY

Interstate 64

No lane closures reported.

 

Interstate 81

* (NEW) Mile marker 205.1 to 237, northbound and southbound – Milling and paving. Lane closures, Monday night to Friday morning, 8 p.m. to 7 a.m.

* Mile marker 205.1 to 237, northbound and southbound – Debris removal, Monday to Friday, 8 a.m. to 5 p.m.

* Mile marker 209 to 228, northbound and southbound – Bridge maintenance on various structures. Single-lane closures, Monday night to Friday morning, 8 p.m. to 7 a.m.

* (NEW) Mile marker 219 to 223, southbound – Guardrail replacement. Right shoulder closed, Monday to Friday, 7 a.m. to 9 p.m. Left lane closed, Sunday night to Friday morning, 7 p.m. to 7 a.m.

* Various locations – Vegetation management activities. Mobile lane closures, Sunday night to Friday morning, 8 p.m. to 7 a.m.

 

Primary Roads

* (NEW) Route 42 – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Route 250 (Jefferson Highway) – Lane closures as necessary from Goose Creek Road to Old White Bridge Road, Monday to Friday.

* (NEW) Route 340 – Paving from Route 612 to Rockingham County line. Single-lane closure, weeknights, 7 p.m. to 7 a.m. Flagger traffic control.

* Route 340 – Delphine Avenue Project. All traffic has been shifted to the east side of Delphine Avenue. Paving work at Route 250. Sewer work to close 4th Street with a detour posted. Flagger traffic control, Monday to Friday, 7 a.m. to 5:30 p.m.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads

* Route 640 (Goose Creek Road) – Project cleanup, topsoil respread and seeding. Single-lane traffic controlled by flaggers, weekdays, 9 a.m. to 3 p.m. Estimated completion is June 8.

* Route 675 (Broadhead School Road) – Bridge culvert work from 0.08 mile south of Route 726 (Dutch Hollow Road) to 1.70 miles north of Route 693 (Butler Road). Road closed, May 23 to June 8. Detour posted.

* (NEW) Route 732 (Middle River Road) – Pipe installation from 3.48 miles south of Route 613 and 0.50 miles north of Route 736. Road closed, June 12 to 26.

* (NEW) Route 732 (Middle River Road) – Pipe installation from 3.10 miles south of Route 613 to 0.75 mile north of Route 736 (Jennings Gap Road). Road closed, June 12 to 26.

* Route 773 (Caveview Lane) – Bridge Widening Project. Road closed.

* (NEW) Various roads – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Various roads – Slurry seal treatment. Flagger traffic control, Monday to Friday, 8 a.m. to 7 p.m. Estimated completion is June 8.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

 

ROCKINGHAM COUNTY

Interstate 81

* Mile marker 237.51 to 263.9, northbound and southbound – Debris removal, clean ditches and brush cutting. Monday to Friday, 8:30 a.m. to 4:30 p.m.

 

Primary Roads

* Route 11 (North Valley Pike) – Pipe installation from Route 865 (Gravels Road) to Route 963 (Windy Knoll Drive). Intermittent lane closures, Monday to Friday, 9 a.m. to 3:30 p.m. Traffic controlled by pilot truck.

* Route 33 (Rawley Pike) – Cross pipe replacement from 0.20 mile west of Route 734 (Bank Church Road). Intermittent lane closure, daily, 7 a.m. to 6 p.m. Flagger traffic control.

* Route 33 – Utility work from Route 276 (Cross Keys Road) to Route 704 (Boyers Road). Intermittent lane closures. Estimated completion is June 30.

* (NEW) Route 259, westbound – Slope repairs from 0.13 mile east of Route 946 to 0.20 mile east of Route 946. Single-lane closure, weekdays, 7 a.m. to 7 p.m. Estimated completion is June 15.

* (NEW) Route 340 – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Route 340 (Eastside Highway), northbound and southbound – Railroad crossing construction from 1.50 miles north of Route 649 (Island Ford Road) to Route 642 (Captain Yancey Road). Road closed from 8 p.m., June 1 to 6 a.m., June 4. Detour posted.

* Various roads – Bridge cleaning. Single-lane traffic controlled by arrow board and signs. Monday night to Friday morning, 7 p.m. to 6 p.m.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads

* Stone Spring Road – Erickson Avenue/Stone Spring Road Connector Project from Route 11 to Port Republic Road. Lane and shoulder closures, daily, 8 a.m. to 5 p.m. Estimated completion is spring 2013.

* Route 609 (Naked Creek Road) – Naked Creek Bridge Project. Replacement work at the intersection of Route 603 (Fleeburg Road, Page County) and Route 609. Periodic temporary lane closures, daily, 8 a.m. to 5 p.m. On May 22, the traffic pattern will shift from the existing bridge on Route 603 to a temporary bridge during construction of the permanent structure. Estimated completion is April 2013.

* Route 726 (Erickson Avenue) – Waterline installation from Route 33 (Rawley Pike) to Harrisonburg City limits. Intermittent lane closures with flaggers controlling traffic, Monday to Friday, 8 a.m. to 5 p.m.

* Route 727 (Airport Road) – Bridge from Route 11 (Lee Highway) to Route 696 (Kisers Road). Road closed until further notice.

* Route 734 (Lumber Mill Road) – Road bore, new pipe installation and riprap for slope protection 0.185 mile west of Route 734 in the Dale Enterprise area. Single-lane traffic controlled by flaggers, Monday to Friday, 7 a.m. to 5:30 p.m.

* Route 1421 (Springbrook Road, Town of Broadway) – Replacement of bridge over Linville Creek from 0.275 miles west of intersection route 42 (South Main Street) to intersection of route 42. Signalization upgrade at intersection of route 42. Possible single lane closures controlled by flaggers Monday to Friday, 7:00 a.m. to 5:30 p.m. Estimated completion is April 30, 2013.

* (NEW) Various roads – Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.

* Various roads – Bridge cleaning. Single-lane traffic controlled by arrow board and signs. Monday night to Friday morning, 7 p.m. to 6 p.m.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.