Home Lynchburg District Weekly Traffic Alert: Work schedule for week of June 14-18
News and Views

Lynchburg District Weekly Traffic Alert: Work schedule for week of June 14-18

AFP
road work
(© Daniel Avram – stock.adobe.com)

Highway work requiring road/lane/structure closures in the Lynchburg District. Work may be delayed/canceled due to weather or other issues. Items in italics contain new/updated information. For up-to-date information, call 511 or visit www.511Virginia.org.

District-wide activities:

Crews will perform various construction/maintenance activities throughout the district using the best practices of social distancing. Activities will include, but are not limited to bridge/guardrail maintenance, brush/tree/limb cutting, pothole/surface/shoulder work, work orders, mowing, boom axing, drainage repairs/work and roadside cleanup.

Amherst County:   

Route 29 (210, Amherst Co – 6, Nelson Co) – Crew will perform long line painting.

Route 29 Bus (Lakeside Dr- Woodys Lake Rd) – Sidewalk construction. Lane closures, delays. Estimated completion November 2021.

Route 60 (686-605) – Crew will work storm drain & pipe, remove brush. Pilot truck/flaggers.

Route 130 over RR, w of Madison Heights –Single 10’ lane at bridge with signal.

Route 130 (685-679) – Alternating flagging operations during shoulder widening operations.

Route 681 – Bridge rehab through September 24, 2021. One 10’6” lane controlled by signal.

Route 743 – Rural Rustic project underway.

Please note districtwide activities above. 

Appomattox County: 

Route 460 (707 to Pr Edward Co line) – Shoulder widening and rumble strip installation. Estimated completion – Nov 2021.

Please note districtwide activities above. 

Buckingham County:  

Route 60/56 – Turn lane project. Fixed completion July 30, 2021.

Route 636/15 – Turn lane project. Fixed completion October 15, 2021.

Please note districtwide activities above. 

Campbell County:   

Route 29 N over NSRR, near airport – Bridge and approach work; est. comp. May 2023.

Route 29 S (683- Pitts Co. line) & 29 N (Pitts. Co. line to 699) – Pruning & small tree removal. Estimated completion Sept. 25. Lane, shoulder closures.

Route 29 Bus, Altavista – Crew will perform signal maintenance.

Route 622 – Reconstruction & bridge over Flat Creek. Delays possible. Est. comp. Sept. 2021.

Please note districtwide activities above. 

Charlotte County:    

Please note districtwide activities above. 

Cumberland County:   

Please note districtwide activities above. 

Halifax County:   

Route 57 over Sandy Creek – Reduced to one lane and temporary signal in place for bridge. Estimated completion – early July.

Route 360 (344-360) – Crew will perform long line painting.

Route 360 and other routes – Litter pick up may result in delays. Be alert to presence of crew.

Routes 501 & 610 – Passing lane project. Expect delays, lane closures & temporary detours. Fixed completion- May 5, 2023. Speed limit reduced. Route 610 connections to 501 closed.

Route 626 – Alignment improvements. Estimated completion – October 8, 2021.

Please note districtwide activities above. 

Lynchburg:

Route 29/460 (Campbell Ave – Concord Turnpike) – Bridge replacement over railroad underway. Northbound 29/eastbound 460 speed 45 mph. Completion July 31, 2023.

Nelson County:  

Route 29 (210, Amherst Co – 6, Nelson Co) – Crew will perform long line painting.

Route 29 near Route 6 – Crew will perform sign maintenance.

Route 250 – Emergency work zone due to rockslide. Road closed bet. Route 6 in Nelson & Route 750, w of Route 151. Use I-64 to cross Afton Mtn.

Please note districtwide activities above. 

Pittsylvania County:   

Route 29 N over Banister River – One lane, 15’ in width.

Route 57 over Cherrystone Creek – Bridge repairs.

Route 58 and other routes – Litter pick up may result in delays. Be alert to presence of crew.

Route 605, Gretna AHQ – Crew will work a Rural Rustic project.

Route 642 (641-637) – Closed 6/1-7/2 for bridge repairs. Detour: 642, 641, 38, 637, to 642.

Route 1308 (40-1310) – Closed beginning 6/28 for approx. 7 weeks for culvert replacement. Detour via 1310, 792, 29 Bus, and 40 to 1308.

Please note districtwide activities above. 

Prince Edward County:   

Route 15/665 turn lanes and 15/692 roundabout – Construction. Fixed comp.  Nov. 11, 2022.

Route 460 W (602-600) and Route 604– Pavement and shoulder widening.

Please note districtwide activities above. 

 

Support AFP

Newsletter

Featured Video

 

 




AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple Podcasts, Spotify, Pandora and YouTube. Support AFP by signing up for our newsletter and/or powering our work with a one-time or monthly contribution.

Latest News

uva basketball team
Basketball, Go 'Hoos

UVA Basketball: Ryan Odom isn’t concerned about bench depth, but I am

uva football brandyn hillman
Football, Go 'Hoos

UVA Football: Anatomy of the dumb Cal play call that led to the 100-yard picksix

The weak defense that first-year Cal head coach Tosh Lupoi offered for the inexplicably bad decision to try a fake field goal that resulted in a 100-yard Virginia picksix was, well, “we came here trying to win the game.”

uva football
Football, Go 'Hoos

UVA Football: Virginia snaps three-game losing skid with 36-7 win over Cal

Virginia held Cal to 201 yards of total offense, intercepted former phenom Jaron-Keawe Sagapolutele twice, sacked him four times, and scored on two picksixes.

ryan odom uva basketball
Basketball, Go 'Hoos

UVA Basketball: Any paint left on the walls of the visiting locker room at the Xfinity Center?

tim kaine
Politics, Virginia

Warner, Kaine mum on Senate Majority Leader battle: Business as usual?

army soldiers in uniform
Politics

John Whitehead | Betraying America’s military and the Constitution they swore to defend

climate change
Politics

Earl Zimmerman | Climate, energy news roundup: What’s making news