Home Culpeper District Traffic Alerts for Nov. 14-18
Local

Culpeper District Traffic Alerts for Nov. 14-18

Contributors

road work transportationThe following highway work is scheduled, weather permitting, in the Culpeper District during the upcoming week. Traffic movements may be restricted and speed limits reduced in work zones. (NEW) or (UPDATE) indicate revisions since last week’s report.

Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website at www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.

 

Albemarle County, City of Charlottesville

For more information about these projects and related traffic impacts, visit www.route29solutions.org or contact Lou Hatter, Communications Manager, 540-717-2890, [email protected].

Rio Road grade-separated intersection – Motorists should follow overhead and ground-mounted signs to guide them through the project area. Sunday through Friday the following overnight lane closures will be in effect.

On Route 29 north and south of the Rio Road intersection:

  • Between 9 p.m. and 6 a.m. Sunday through Friday, there will be at least one lane open both northbound and southbound
  • All business entrances will remain open during business hours
  • Turning movements at the Rio Road signal, including left turns and U-turns, may be restricted between 9 p.m. and 6 a.m.

On Rio Road east and west of Route 29:

  • Between 9 p.m. and 6 a.m., the crossover, U-turn and left-turn movements from Rio Road onto Route 29 and from Route 29 onto Rio Road may be restricted
  • All business entrances will remain open during business hours

During the overnight closures additional detour signs, cones and other traffic controls will direct motorists through the work zone. The speed limit remains 35 mph at all times. The nighttime work will continue for the next several months.

(UPDATE) Route 29 widening – Northbound traffic will be shifted to a new alignment in the median area beginning at 9 p.m. Nov. 18. The switch will be complete by 6 a.m. Nov. 19. Motorists should be alert for signs and other traffic controls and expect minor delays during the traffic shift. This lane shift will allow reconstruction of the existing northbound lanes and the multi-use path just east of the roadway.

Travel lanes are narrowed and shoulders are closed within the work zone and the speed limit is reduced to 40 mph. Expect intermittent single lane closures Monday through Friday between 9 p.m. and 6 a.m. Motorists should remain alert and use caution through the work zone.

Berkmar Drive Extended – Bridge construction may require brief, intermittent closures of Rio Mills Road between Route 29 and Millers Cottage Lane while materials are delivered. On Towncenter Drive in the vicinity of the roundabout, motorists should be alert for dump trucks and other equipment entering and exiting the roadway.

Hillsdale Drive Extended – Obey traffic controls and expect minor delays on Hillsdale Drive, Hydraulic Road, India Road, Zan Road, Greenbrier Drive, Pepsi Place and Seminole Court. For project updates, visithttp://hillsdaledrive.org.

 

Albemarle County

Interstate 64 – Installation of infrastructure and devices for active traffic management system on Afton Mountain. Shoulder closures in both directions between 7 a.m. and 6 p.m. Monday through Friday from mile marker 107 (Crozet exit) to mile marker 94 in Augusta County. Motorists should use caution approaching the work zone.

(UPDATE) Interstate 64 – Tree trimming westbound between mile markers 116 and 114. Monday through Thursday from 8 p.m. to 6 a.m., expect westbound shoulder closures.

(NEW) Route 601 (Garth Road) – Mobile tree trimming operations between Route 654 (Barracks Road) and Route 678 (Ridge Road). Thursday from 9:30 a.m. to 2:30 p.m., traffic reduced to one lane controlled by flagging.

(NEW) Route 637 (Dick Woods Road) – Roadway resurfacing from Route 151 (Critzers Shop Road) to Nelson County line. Monday and Tuesday from 7 a.m. to 4 p.m., traffic reduced to one lane controlled by flagging.

(NEW) Route 654 (Barracks Road) – Mobile tree trimming operations between Route 654 (Georgetown Road) and Route 601 (Garth Road). Thursday from 9:30 a.m. to 2:30 p.m., traffic reduced to one lane controlled by flagging.

(NEW) Route 689 (Burchs Creek Road) – Roadway resurfacing from Route 635 (Miller School Road) to Route 637 (Dick Woods Road). Wednesday from 7 a.m. to 4 p.m., traffic reduced to one lane controlled by flagging.

 

Culpeper County

(UPDATE) Route 3 (Germanna Highway) – Roadway widening to four lanes from Stevensburg to Lignum. On Tuesday, traffic will shift to new westbound lanes between Route 739 (Clay Hill Road) and Route 600 east (York Road). Monday through Saturday from 9 a.m. to 3 p.m., stay alert for intermittent lane closures from 0.9 mile west of Route 663 (Stevensburg Road.) to Route 669 (Carrico Mills Road). Traffic will be controlled by flagging. Speed limit reduced to 45 mph in the work zone. Motorists should be alert for workers near the travel lanes and for trucks entering and exiting the highway.

Route 29 (James Madison Highway) – Construction of new interchange at Route 666 (Braggs Corner Road). Monday through Friday from 8 a.m. to 4 p.m., intermittent lane closures will occur on Route 29 and Route 666. Speed limit reduced to 35 mph on Route 666 and to 50 mph on Route 29 through the work zone. Anticipated completion August 2017.

Route 29 (James Monroe Highway) – Constructing restricted crossing U-turn intersection at Route 718 (Mountain Run Lake Road). The median crossover is closed at Route 718, restricting all left-turn movements at the intersection. Motorists detoured via Route 1250 (Granite Boulevard). Monday through Friday from 6:30 a.m. to 6 p.m., single lane closures will be in place in both directions between Route 29 Business (Madison Road) and Route 1250. Motorists should use caution traveling through the work zone and obey traffic controls. Anticipated completion January 2017.

Route 229 (North Main Street) – Roadway widening to four lanes. Monday through Friday from 7 a.m. to 5 p.m., occasional lane closures with flagging will occur through the work zone. Stay alert for workers near the travel lanes and for trucks entering and exiting the highway. Anticipated completion August 2017.

Route 522 (Sperryville Pike) – Roadway widening in association with the Route 784 (Western Outer Loop/Ira Hoffman Lane) project. Monday through Friday from 7 a.m. to 5 p.m., occasional lane closures with flagging will occur from Route 641 (Gibson Mill Road) to Route 763 (Saint Jameson Road).

(UPDATE) Route 600 (York Road) – Paving operations at east end of the route at the Route 3 (Germanna Highway) intersection as part of the Route 3 widening project. Monday and Tuesday, road closed at intersection. Motorists advised to use Route 663 (Stevensburg Road) to access Route 3.

(NEW) Route 685 (Fleetwood Heights Road) – Rehabilitating bridge over Flat Run. Road closed to through traffic. Drivers west of the bridge should use Route 663 (Alanthus Road) to Route 15/29 (James Madison Highway) and turn left on Route 676 (Beverley Ford Road), which carries traffic back to Route 685. Motorists on the east side of the bridge should reverse the detour. Driveway access will be maintained for local traffic. Anticipated completion Dec. 23.

 

Fauquier County

Interstate 66 – Mowing operations in both directions between mile markers 14 and 37. Monday through Friday from 7 a.m. to 3 p.m., intermittent lane closures are possible while equipment navigates across bridges and around guardrail.

(NEW) Frontage Route 1077 (Marsh Road) – Construction of U-turn facility as part of closure of Frontage Route 1077 (Marsh Road) to through traffic. Monday through Friday from 7 a.m. to 5 p.m., northbound left lane closed. Use caution in work zone.

(NEW) Route 17 (Marsh Road) – Guardrail installation northbound from Route 823 (Spring Mill Road) to Route 633 (Dyes Lane). Monday through Thursday from 7 a.m. to 6 p.m., right lane closed. Use caution in work zone.

(UPDATE) Route 245 (Old Tavern Road) – Rehabilitating bridge over Broad Run. A temporary traffic signal is in place to control two-way traffic through the work zone. Motorists should obey traffic controls and use caution traveling through the work zone. Anticipated completion April 2017.

(NEW) Route 647 (Crest Hill Road) – Culvert replacements between Route 721 (Free State Road) and Route 635 (Hume Road). Thursday from 6 a.m. to 6 p.m., road closed to through traffic. Motorists advised to follow posted detour.

 

Fluvanna County

Route 15 (James Madison Highway) – Construction of roundabout at Route 53 (Thomas Jefferson Parkway). Monday through Friday from 7 a.m. to 5:30 p.m., motorists can expect intermittent lane closures controlled by flagging. Anticipated completion August 2017.

(UPDATE) Route 250 (Richmond Road) – Shoulder repairs from Route 600 (Paynes Mill Road) to Route 689 (Edgecomb Road). Monday through Friday from 8:30 a.m. to 4 p.m., traffic reduced to one lane controlled by flagging.

 

Louisa County

Route 33 (Jefferson Highway) – Utility company performing communications cable work from Route 767 (School Bus Road) to the Hanover County line. Shoulder closures and intermittent lane closures with flagging. Use caution when traveling near the work zone.

(UPDATE) Route 609 (Buckner Road) – Rehabilitating bridge over Long Creek. Route 609 closed to through traffic. Southbound motorists will be detoured west on Route 612 (Halls Store Road) to Route 33 (Jefferson Highway), and then east on Route 648 (Jouett School Road), which carries traffic back to Route 609. Northbound traffic will reverse the detour. Anticipated completion Dec. 2.

 

Madison County

Route 230 (Wolftown-Hood Road) – Rehabilitating the bridge over the Conway River.  A temporary traffic signal is in place to control two-way traffic through the work zone. Monday through Friday from 7 a.m. to 5:30 p.m., expect lane closures in both directions between the Greene County line and Route 666 (Pea Ridge Road). Motorists should obey traffic controls, use caution traveling through the work zone and expect minor delays. Anticipated completion November 2017.

 

Orange County

(NEW) Route 643 (Cox Mill Road) – Pipe replacement between Route 639 (Madison Run Road) and Route 754 (Wolf Trap Court). Wednesday from 7:30 a.m. to 3:30 p.m., traffic reduced to one lane controlled by flagging.

(NEW) Route 674 (Little Skyline Drive) – Pipe repairs between Route 15 (James Madison Highway) and Route 633 (Spicers Mill Road). Tuesday from 9 a.m. to 3 p.m., road closed at repair site. Local traffic should use Route 15 and Route 633 for access to Route 674.

 

Rappahannock County

(UPDATE) Route 211 (Lee Highway) – Paving and line striping operations in both directions from Page County line to Route 667 (Estes Mill Road). Monday through Saturday from 7 a.m. to 6 p.m., traffic reduced to one lane. Use caution in work zone.

Road conditions and other real-time travel information can be found on the 511 Virginia website, the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. VDOT updates are also on Facebook and the district’s Twitter account, @VaDOTCulp.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.