Home VDOT road-work report
Local

VDOT road-work report

Contributors

The following is a list of highway work that might affect traffic in the Staunton transportation district during the coming weeks.

Work scheduled is subject to change due to inclement weather and material supplies.

Motorists are advised to watch for slow-moving tractors during mowing operations.

Also, when traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

 

ROCKBRIDGE COUNTY

Interstate 64

* Mile marker 57 to 41, eastbound and westbound – Debris removal, Monday to Friday, 8 a.m. to 5 p.m.

 

Interstate 81

* Mile marker 173 to 205, northbound and southbound – Debris removal, fence repair, ditch repair, sign work, and rock removal from shoulders. Monday to Friday, 8 a.m. to 5 p.m.

* Mile marker 175 to 195, northbound and southbound – Bridge maintenance on various structures. Single-lane closures, Monday night to Friday morning, 8 p.m. to 7 a.m.

* (UPDATE) Mile marker 195.6 to 202.5, northbound – Truck climbing lane project. Right lane closed from mile marker 195 to 197 for slope work, Tuesday night to Wednesday morning, 8 p.m. to 7 a.m.

 

Primary Roads

* Route 252 (Brownsburg Turnpike) – Project at the bridge over Cedar Grove Branch. This location is 0.50 mile north of Route 712 (Decatur Road) and 0.98 mile south of Route 727 (Hyde Road). Bridge closed beginning June 13. Single-lane detour on temporary road next to the existing bridge. Traffic controlled by stop and proceed sign. Estimated completion is Aug. 2.

* Various roads – Paving, patching, shoulder repairs, ditching, litter pickup, pipe cleaning, pipe replacement, mowing and brush cutting. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

 

Secondary Roads

* Various roads – Paving, patching, shoulder repairs, ditching, litter pickup, pipe cleaning, pipe replacement, mowing and brush cutting. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

 

 

HIGHLAND COUNTY

Primary Roads

* Route 220 – Shoulder repairs. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 220, southbound – Ditching. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 250 – Shoulder repairs. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 250 – Replacement of bridge over Crab Run in McDowell, from 0.01 mile east of Route 645 to 0.014 miles west of Route 654 (Doe Hill Road). Single-lane traffic with 14-foot width restriction and three-way traffic signal at Route 250 and intersection of Route 654. Flagger traffic control at various locations when needed. Work may take place 24 hours-a-day. Speed limit reduced to 25 mph. Estimated completion is October 2012.

* Various roads – Mowing, Monday to Friday, 7:30 a.m. to 3 p.m.

 

Secondary Roads

* Route 615 – Tar and graveling. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Route 619 – Tar and graveling. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

* Various roads – Patching. Flagger traffic control, Monday to Friday, 7:30 a.m. to 3 p.m.

 

 

AUGUSTA COUNTY

Interstate 64

No lane closures reported.

 

Interstate 81

* Mile marker 205.1 to 237, northbound and southbound – Debris removal and fence repair. Monday to Friday, 8 a.m. to 5 p.m.

* Mile marker 209 to 228, northbound and southbound – Bridge maintenance on various structures. Single-lane closures, Monday night to Friday morning, 8 p.m. to 7 a.m.

 

Primary Roads

* Route 250 (Jefferson Highway) – Lane closures as necessary from Goose Creek Road to Old White Bridge Road for handrail installation and final inspection, Monday to Friday.

* (NEW) Route 262 – Work on bridge over Route 250 eastbound and westbound. Road closed, Monday, 6:45 a.m. to 7:30 a.m. Traffic will use the on and off ramps around the bridge until work is complete. Flagger traffic control at ramps and on Route 250.

* Route 340 – Delphine Avenue Project. All traffic has been shifted to the east side of Delphine Avenue. Paving work at Route 250. Sewer work to close 4th Street with a detour posted. Flagger traffic control, Monday to Friday, 7 a.m. to 5:30 p.m.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads

* Route 640 (Goose Creek Road) – Handrail installation and final inspection. Single-lane traffic controlled by flaggers, weekdays, 9 a.m. to 3 p.m. Estimated completion is June 15.

* Route 732 (Middle River Road) – Pipe installation from 3.48 miles south of Route 613 and 0.50 miles north of Route 736. Road closed, June 12 to 26.

* Route 732 (Middle River Road) – Pipe installation from 3.10 miles south of Route 613 to 0.75 mile north of Route 736 (Jennings Gap Road). Road closed, June 12 to 26.

* Route 773 (Caveview Lane) – Bridge Widening Project. Road closed.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

 

ROCKINGHAM COUNTY

Interstate 81

* Mile marker 237.51 to 263.9, northbound and southbound – Debris removal, brush cutting, clean ditches and guardrail. Monday to Friday, 8:30 a.m. to 4:30 p.m.

 

Primary Roads

* Route 11 (North Valley Pike) – Pipe installation from Route 865 (Gravels Road) to Route 963 (Windy Knoll Drive). Intermittent lane closures, Monday to Friday, 9 a.m. to 3:30 p.m. Traffic controlled by pilot truck.

* (NEW) Route 33 – Milling and paving from Route 981 to 2.30 miles west of the Greene County Line. Single-lane closure and occasional shoulder closures, weekdays, 7 a.m. to 9 p.m.

* Route 33 (Rawley Pike) – Cross pipe replacement from 0.20 mile west of Route 734 (Bank Church Road). Intermittent lane closure, daily, 7 a.m. to 6 p.m. Flagger traffic control.

* Route 33 – Utility work from Route 276 (Cross Keys Road) to Route 704 (Boyers Road). Intermittent lane closures. Estimated completion is June 30.

* Route 259, westbound – Slope repairs from 0.42 mile east of Route 946 to 0.51 mile east of Route 946. Single-lane closure, weekdays, 7 a.m. to 7 p.m. Estimated completion is June 15.

* Various roads – Bridge cleaning. Single-lane traffic controlled by arrow board and signs. Monday night to Friday morning, 7 p.m. to 6 p.m.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

 

Secondary Roads

* Stone Spring Road – Erickson Avenue/Stone Spring Road Connector Project from Route 11 to Port Republic Road. Lane and shoulder closures, daily, 8 a.m. to 5 p.m. Estimated completion is spring 2013.

* Route 609 (Naked Creek Road) – Naked Creek Bridge Project. Replacement work at the intersection of Route 603 (Fleeburg Road, Page County) and Route 609. Periodic temporary lane closures, daily, 8 a.m. to 5 p.m. On May 22, the traffic pattern will shift from the existing bridge on Route 603 to a temporary bridge during construction of the permanent structure. Estimated completion is April 2013.

* Route 726 (Erickson Avenue) – Waterline installation from Route 33 (Rawley Pike) to Harrisonburg City limits. Intermittent lane closures with flaggers controlling traffic, Monday to Friday, 8 a.m. to 5 p.m.

* Route 727 (Airport Road) – Bridge from Route 11 (Lee Highway) to Route 696 (Kisers Road). Road closed until further notice.

* Route 734 (Lumber Mill Road) – Road bore, new pipe installation and riprap for slope protection 0.185 mile west of Route 734 in the Dale Enterprise area. Single-lane traffic controlled by flaggers, Monday to Friday, 7 a.m. to 5:30 p.m.

* Route 1421 (Springbrook Road, Town of Broadway) – Replacement of bridge over Linville Creek from 0.275 miles west of intersection route 42 (South Main Street) to intersection of route 42. Signalization upgrade at intersection of route 42. Possible single lane closures controlled by flaggers Monday to Friday, 7:00 a.m. to 5:30 p.m. Estimated completion is April 30, 2013.

* Various roads – Bridge cleaning. Single-lane traffic controlled by arrow board and signs. Monday night to Friday morning, 7 p.m. to 6 p.m.

* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.