Home Route 29 Solutions request for proposals released
Local

Route 29 Solutions request for proposals released

Contributors

route 29The Virginia Department of Transportation announced that the Request for Proposals for projects in the Route 29 Solutions package has been issued to three shortlisted firms and released on the project website Route29Solutions.org.

Three projects are included in the RFP:  the widening of Route 29 from Route 643 (Polo Grounds Road) to Route 1719 (Towncenter Drive), construction of Berkmar Drive Extended from Route 1438 (Hilton Heights Road) to Hollymead Town Center and the grade separation of the intersection of Route 631 (Rio Road) and Route 29. The projects will be advanced as a design-build procurement.

A design public hearing on the three design-build projects will be held from 5-7 p.m. on Oct. 14 at Albemarle High School. At that hearing members of the public can get information about the projects, talk with VDOT project team members and provide comments on the proposed designs.

The shortlisted teams are Shirley Contracting Co. / Dewberry Inc., Lane Construction Corp.-Corman Construction Inc. / RK&K, and Skanska-Branch A Joint Venture / JMT.

The project continues to meet schedule milestones. The anticipated schedule dates for responses to the RFP areDec. 4 for the technical proposals and Jan. 13, 2015 for the price proposals. VDOT will evaluate the submissions and select a team Feb. 18, 2015.

Other Route 29 Solutions projects include improving the Route 29/250 interchange in Charlottesville, installing state-of-the-art adaptive signal technology at the intersections from Hydraulic Road north to Airport Road, and completing a study and preliminary engineering for improvements to the Route 29/Hydraulic Road intersection and a possible extension of Hillsdale Drive south of Hydraulic Road. Full funding for the locally-administered Hillsdale Drive Extended project will allow the city of Charlottesville to complete that project. These projects will increase capacity and efficiency along Route 29 and provide alternate routes on parallel roads.

Information about the Route 29 Solutions package, including the projects that are not part of the Request for Proposals, can be found on VDOT’s web site at www.Route29Solutions.org.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

steve enright bridgewater
Sports

Bridgewater College basketball coach Steve Enright leaving for Keene State job

jmu football
Sports

JMU introduces Eastern Kentucky AD Matt Roan as new athletics director

It’s been a busy couple of days of changes at the top at James Madison University, with the school naming Charlie King the interim president, and a new person being put in charge of the athletics department, Matt Roan, of late the AD at Eastern Kentucky.

Taylor Swift in concert in New York
Arts & Media, US & World

‘The Tortured Poets Department’ is here: Happy release day for Swifties everywhere

At 2 a.m. ET, Taylor Swift announced “The Tortured Poets Department” is actually a double album, meaning 31 new songs are out today, under the title “TTPD: The Anthology.”

senior citizen smelling flowers in garden
Climate, Virginia

Warmer weather in Virginia means earlier planting times, longer harvest season, more bugs

live music concert
Schools, Virginia

Shenandoah Conservatory to offer three-day summer guitar festival

arrest handcuffs jail prison sentence
Public Safety, Virginia

Richmond Police: Suspect charged in homicide of 14-year-old male

crime scene tape
Public Safety, Virginia

Police: Richmond man charged in Deforrest Street juvenile homicide