Home Staunton swamped, literally, by recent flooding
Local News

Staunton swamped, literally, by recent flooding

Contributors

stauntonThe City of Staunton is facing millions of dollars in costs related to two recent storm events, against a backdrop of a budget that is already stretched to the gills.

The city is conducting a preliminary assessment of its current and planned stormwater management facilities and practices that will include an analysis of planned capital improvement projects and revenue sources to help prioritize and implement improvements to stormwater management systems, including longer term strategies.

The fiscal challenge facing the city is demonstrated by the fact that total stormwater projects for the upcoming five-year period total $4.2 million, with an additional $20 million in unscheduled and unfunded projects, while the revenues dedicated to these projects — derived from stormwater and erosion and sediment control fees — total approximately $780,000 annually.

Public works crews remain focused on day-to-day maintenance of the city’s stormwater management infrastructure to ensure maximum performance during any upcoming heavy rain events. The extreme amounts of rainfall in short periods in very localized areas earlier this month have posed a significant challenge to existing stormwater conveyances, which has resulted in damage in the delineated floodplain area of the city.

As the assessment commences, actions are already planned and/or underway to improve flood resiliency. City staff is studying flood control measures and working to identify solutions that meet permit requirements while providing flood control benefits.

Examples of these efforts include the following:

  • The city is in the final stages of a new flood study, which will result in revised flood maps for the West Beverley Street corridor. Approval from the Federal Emergency Management Agency is expected soon.
  • Staff is currently identifying potential projects to support flood resiliency and evaluating grant funding sources.
  • Engineering and public works have been working to address drainage issues in small, localized areas as funds and city staff are available.
  • Design of the Tams Caroline Augusta storm drain project is underway.  This project will address severe drainage issues from Tams Street to New Street at Augusta Street.
  • The city recently made improvements to the stormwater system at Central Avenue and Johnson Street and with the Churchville Avenue improvement project.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

dai dai ames uva basketball
Basketball, Sports

UVA Basketball: Do the ‘Hoos have a chance with #3 Duke on Big Monday?

How to Bet On the Daytona 500 in California
Sports

How to Bet On the Daytona 500 in California

The 2025 NASCAR Cup season will begin on Sunday with the 67th annual Daytona 500. In California, sports betting remains unregulated, but NASCAR fans can still cash in on their predictions for the Great American Race. The top offshore sportsbooks are giving away over $5,000 in free bets for California residents who sign up this...

ron sanchez uva basketball vt
Basketball, Sports

The tweak UVA Basketball coach Ron Sanchez would need if he were to get the job full time

One lesson Ron Sanchez could take with him into next year, if he, indeed, ends up getting the UVA Basketball job on a full-time basis after the season, would be, succession planning.

george mason
Basketball, Sports

George Mason rallies, beats Saint Joseph’s, to stay atop A-10 standings

isaac mckneely uva basketball
Basketball, Sports

Five Observations: UVA Basketball gets more good offense in road win

Daytona 500 Odds, Picks, & How To Bet
NASCAR

Daytona 500 Odds, Picks, & How To Bet

uva basketball
Basketball, Sports

Live Coverage: UVA Basketball grits out 73-70 win at Virginia Tech