Home VDOT: Local road construction, maintenance scheduled for the week of April 6-10
Local News

VDOT: Local road construction, maintenance scheduled for the week of April 6-10

Chris Graham
vdot road
Photo: © monticellllo/Shutterstock

VDOT has released its schedule for road construction and maintenance for the week of April 6-10.

Scheduled work is subject to change due to inclement weather and material supplies. When traveling through a work zone, use extreme caution and be alert for lane closures and traffic-pattern changes.

For updated traffic alerts and travel information dial 511, visit the 511 Virginia website or download the mobile app.

The VDOT Customer Service Center operates 24/7 to help roadway users report potential hazards, make service requests or get information related to Virginia’s transportation network.

Use its mobile friendly website or call 800-367-7623.

Find the VDOT Staunton District on Facebook and X and follow VDOT statewide social media accounts.

News releases, travel tips and project updates are on the VDOT website.

Augusta County


Interstate 64 

  • *NEW* Exit 87, westbound– Right-shoulder closure along the ramp to I-81 northbound, 8 a.m. to 5 p.m. Monday to Friday.
  • *NEW* Mile marker 96 to 97, westbound– Right-shoulder closure for shoulder and sign repairs, 7 a.m. to 5 p.m. Wednesday through Friday.

Interstate 81 

  • *NEW* Mile marker 210 to 212, northbound– Right shoulder closures including the off-ramps at exits 213 and 217 for sign work, 8 a.m. to 5 p.m. through Friday.
  • Mile marker 220 to 226, northbound and southbound – Single-lane traffic on exit 221 southbound ramp to I-64 eastbound through March 30. Shoulder closures and travel-lane shifts northbound and southbound 24/7. Traffic restrictions are for I-81 widening projectwith estimated completion in summer 2027. Work zone speed limit 60 miles an hour.
  • *UPDATE* Mile marker 228 to 229, northbound and southbound – Overnight right lane closures for bridge maintenance, 8 p.m. to 7 a.m. through Thursday night.
  • Mile marker 234 to 238, northbound and southbound – Northbound and southbound left shoulder closures 24/7. Work zone speed limit 60 miles per hour. Traffic restrictions are for construction of I-81 truck-climbing laneswith estimated completion of late 2027.

Route 254 (Hermitage Road) – Pilot truck and flagger traffic control at intersections with Route 262 (Woodrow Wilson Parkway) and Route 792 (Indian Mound Road/Balsley Road) for intersection improvements, 9 a.m. to 5:30 p.m. through June 5.

Route 262 (Woodrow Wilson Parkway) – Northbound shoulder closures between I-81 interchange and Route 11 (Lee-Jackson Highway) interchange for fiber installation, 7 a.m. to 5 p.m. through April 10.

*UPDATE* Route 340 (Eastside Highway) – Single lane closures for tree removal operations between Route 633 (Crimora Station Lane/Mine Branch Road) and Route 612 (Crimora Mine Road), 7 a.m. to 5 p.m. through April 17.

Route 340 (Stuarts Draft Highway) – Overnight flagger and pilot truck traffic control between Route 657 (Indian Ridge Road) and Edelweiss Lane for shoulder widening operations, 8 p.m. to 6 a.m. nights through June 25.

Route 612 (Laurel Hill Road, Verona) – Occasional flagger traffic control and westbound turn-lane closures at Route 901 (Mill Place Parkway) for intersection improvements, 6 a.m. to 8 p.m. weekdays through August 1.

Route 626 (Berry Farm Road) – Closed to through traffic between Route 612 (Quicks Mill Road) and Route 613 (Spring Hill Road) March 30 – April 9 for replacement of bridge with concrete pipe. Follow posted detour.

*UPDATE* Route 742 (Lebanon Church Road) – Flagger traffic near intersection with Catheys River Lane for maintenance to Middle River bridge, 8 a.m. to 5 p.m. through Wednesday.

Route 834 (Hickory Hill Road) – Flagger traffic control between Route 631 (Ladd Road) and Route 640 (Goose Creek Road) for waterline installation, 7:30 a.m. to 4 p.m. through April 30.

Route 901 (Mill Place Parkway, Verona) – Occasional flagger traffic control near Route 612 (Laurel Hill Road) for intersection and roadway improvements, 6 a.m. to 8 p.m. weekdays through August 1.

Various roads – Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 to 3 p.m. weekdays.

Rockbridge County


Interstate 81 

  • *UPDATE* Mile marker 174 to 196, northbound – Right shoulder closures for brush removal, 7 a.m. to 5 p.m. Wednesday and Thursday.
  • *NEW* Exits 188A, 195 and 205, northbound – Off ramp right-shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.
  • *UPDATE* Mile marker 200 to 201, northbound – Right shoulder closures for drainage work, 7 a.m. to 5 p.m. Friday.
  • *NEW*Mile marker 205 to 200, southbound – Overnight left-lane closures for soil boring operations, 8 p.m. to 5 a.m. weeknights through May 17.

*UPDATE* Route 501 (Glasgow Highway) – Flagger traffic control for tree removal at various locations between Buena Vista southern city limits and Amherst County line, 7 a.m. to 5 p.m., weekdays through April 17.

Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. weekdays.

Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting, 7:30 a.m. to 3 p.m. weekdays.

Rockingham County


Interstate 81 

  • Mile marker 237 to 238, northbound and southbound – Left shoulder closures 24/7. Work zone speed limit 60 miles per hour. Traffic restrictions are for construction of I-81 truck-climbing laneswith estimated completion of late 2027.
  • Mile marker 242 to 248, northbound and southbound – Single lane closures as needed 8 p.m. to 7 a.m. and shoulder closures 24/7. Traffic restrictions are for Route 33 bridge and interchange projectwith completion expected in fall 2026.
  • *NEW* Mile marker 250 to 256, northbound and southbound – Brief slow-roll closures (rolling roadblocks) for overhead utility work, 6 a.m. to 11 a.m. Sunday (April 12).

Route 33 (East Market Street, Harrisonburg) – Follow posted detour. Single-lane closures as needed between Hawkins Street and University Boulevard. Shoulder closures 24/7. Traffic restrictions are for bridge replacements and interchange improvements with expected completion in September.

*UPDATE* Route 33 (Spotswood Trail) – Westbound single lane closures just west of Elkton town limits for bridge painting, 4 a.m. to 5 p.m. through April 5.

*NEW* Route 42 (Warm Springs Pike) – Flagger traffic control between Route 727 (Spring Creek Road) and the Augusta County line for paving operations, 7 a.m. to 6 p.m. weekdays through April 24.

*NEW* Route 42 (John Wayland Highway) – Southbound right lane closures from Route 713 (Brunk Lane) to (Koogler Lane) for turn lane construction, 8 a.m. to 5 p.m. weekdays through April 17.

Route 340 (Stuart Avenue, Elkton) – Single lane closures for utility work between Business Route 33 (Old Spotswood Trail) and Route 1924 (Spotswood Avenue), 7 a.m. to 7 p.m. through May 1.

Route 340 (East Side Highway) – Shoulder closures near Route 649 (Island Ford Road/Berrytown Road) intersection for traffic signal installation, 7 a.m. to 5 p.m. through April 10.

*NEW* Route 735 (Linhoss Road) – Closed to through traffic between Route 710 (Silver Lake Road) and Route 736 (Swope Road) for bridge widening, April 6 to May 28. Follow posted detour.

Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. weekdays.

Support AFP

Chris Graham

Chris Graham

Chris Graham is the founder and editor of Augusta Free Press. A 1994 alum of the University of Virginia, Chris is the author and co-author of seven books, including Poverty of Imagination, a memoir published in 2019. For his commentaries on news, sports and politics, go to his YouTube page, TikTok, BlueSky, or subscribe to Substack or his Street Knowledge podcast. Email Chris at [email protected].

Latest News

bible
Politics

How the Pentagon turned the Sermon on the Mount into a war manual

fueling up at gas station
Politics

How much more are you paying for gas since the star of the Iran war?

The fill-up cost for the average Augusta County guy with a big pickup truck, and we’ve got more than our fair share of those, has gone up $37.29 since the start of Donald Trump’s war in Iran five weeks ago.

adrian autry
Politics

UVA Basketball: What could Adrian Autry bring with him from Syracuse?

With former Syracuse coach Adrian Autry now on UVA Basketball coach Ryan Odom’s staff, it’s worth taking a look at the roster that Autry just left behind at ’Cuse.

uva baseball
Baseball

UVA Baseball: Hands of stone for ‘Hoos on D key 5-2 loss to #7 FSU

uva football happy fans
Football

UVA Football: The spring game will not be televised (the spring game will be live)

donald trump jay jones
Politics

Jay Jones files suit against Trump over executive order on mail-in voting

richard j. solis
State News

Northern Virginia man charged with online solicitation of 11-year-old girl