The following highway work is scheduled, weather permitting, in the Culpeper District during the next week.
Traffic movements may be restricted, and speed limits may be reduced in work zones.
(NEW) or (UPDATE) indicate revisions since last week’s report.
Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website at www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.
Albemarle County
Vegetation control – Expect mobile, alternating lane closures, Monday through Friday in the following areas:
- Interstate 64, between mile marker 107 and mile marker 114 in the eastbound and westbound lanes, 9 a.m. to 2 p.m.
- Interstate 64, between mile marker 100 and mile marker 132 in the eastbound and westbound lanes, 9 a.m. to 3 p.m.
(NEW) Roadway sweeping – Expect mobile, alternating lane closures in the following areas.
- U.S. 29 (Seminole Trail), between Route 743 (Hydraulic Road) and Route 631 (Rio Road) in the northbound and southbound lanes, 9 p.m. Wednesday to 6 a.m. Thursday.
- Route 631 (Rio Road East), between the Charlottesville city line and U.S. 29 (Seminole Trail) in the northbound and southbound lanes, Monday and Tuesday, 3:30 a.m. to 6 a.m.
(NEW) Bridge inspections – Expect alternating lane closures in the following areas:
- U.S. 29 (Seminole Trail), between Route 1417 (Woodbrook Drive) and Route 1670 (Ashwood Boulevard in the northbound and southbound lanes, 9 p.m. Thursday to 6 a.m. Friday.
- Route 53 (Thomas Jefferson Parkway), between Fluvanna County line and Route 729 (Milton Road) in the eastbound and westbound lanes, Thursday, 8:30 a.m. to 4:30 p.m.
- Route 2500 (John Warner Parkway), between Melbourne Road and Route 631 (Rio Road) in the northbound and southbound lanes, Thursday, 8:30 a.m. to 4:30 p.m.
Tree removals – Expect alternating lane closures, Monday through Friday, 7:30 a.m. to 5 p.m.
- U.S. 29 (Monacan Trail), between Route 805 (Henderson Lane) and Route 632 (Faber Road) in the northbound and southbound lanes.
- Route 6 (Irish Road), at Route 626 (Langhorne Road) in the eastbound and westbound lanes.
(UPDATE) Equipment installation – Expect intermittent lane and shoulder closures, Monday through Thursday in the following areas:
- Interstate 64 eastbound, between mile marker 102 and mile marker 105, 7 p.m. to 5:30 a.m.
- Interstate 64 westbound, between mile marker 107 and mile marker 102, 7 p.m. to 5:30 a.m.
Bridge Superstructure repairs/replacement – Expect lane and shoulder closures in the following areas:
- Route 20 (Scottsville Road), Expect temporary traffic signal with a traffic pattern shift at Route 708 (Red Hill Road). Route 708 is narrowed to one lane for construction on the bridge over the North Fork Hardware River. Please expect delays during high volume times of the day. Project completion date, Dec. 4, 2024.
- Route 824 (Patterson Mill Lane), Road closed to through traffic between U.S. 250 (Rockfish Gap Turnpike) and Route 688 (Midway Road). Expected completion, Oct. 25, 2024.
(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- U.S. 250 (Rockfish Gap Turnpike), alternating lane closures between Route 240 (Crozet Avenue) and Route 797 (Hillsboro Lane) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
- Route 240 (Crozet Avenue), alternating lane closures between Route 691 (Jarmans Gap Road) and Route 240 (Three Notch’d Road) in the northbound and southbound lanes, daily, 9 a.m. to 3:30 p.m.
- Route 240 (Three Notch’d Road), alternating lane closures between Route 240 (Crozet Avenue) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
- Route 751 (Brownsville Road), both shoulders closed between Route 240 (Crozet Avenue) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 1:30 p.m.
- Route 797 (Hillsboro Lane), right shoulder closures between U.S. 250 (Rockfish Gap Turnpike) and Route 684 (Half Mile Branch Road) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
(UPDATE) Interstate 64 – Tree trimming. Expect mobile work zone with right shoulder closures between mile marker 107 and mile marker 124 in the eastbound lanes, daily through Friday, 9 a.m. to 3 p.m.
(NEW) Interstate 64 – Pavement marking. Expect mobile, alternating lane closure between mile marker 128 and mile marker 132 in the eastbound lanes, Monday through Friday, 7 p.m. to 1 p.m.
U.S. 29 (Seminole Trail) – Roadway improvements. Expect alternating lane closures between Route 3416 (Angus Road) and Seminole Court in the northbound and southbound lanes, nightly, Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday.
U.S. 250 (Rockfish Gap Turnpike) – Pavement marking repairs. Expect mobile, alternating lane closures between the Nelson County line and the Fluvanna County line in the eastbound and westbound lanes, nightly, starting Tuesday, 7 p.m. to 6 a.m.
Route 20 (Scottsville Road) – Signal installations. Expect both shoulders at Route 712 (Coles Rolling Road) in the northbound and southbound lanes, daily, 7 a.m. to 5 a.m.
Route 729 (Milton Road) – Shoulder repairs. Expect alternating lane closures between Route 1120 (Milton Hills Drive) and Route 53 (Thomas Jefferson Parkway) in the northbound lanes, daily, 8 a.m. to 6 p.m.
Route 797 (Hillsboro Lane) – Rehabilitation project. Expect alternating lane closures between Route 684 (Half Mile Branch Road) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
City of Charlottesville
Roadway improvements – Expect alternating lane closures Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday in the following areas:
- U.S. 250 (Bypass), between Route 3412 (Dairy Road) and the ramp to U.S. 29 (Emmet Street) in the northbound and southbound lanes.
- Route 743 (Hydraulic Road), between Route 3431 (Brandywine Drive) and U.S. 29 (Seminole Trail) in the eastbound and westbound lanes.
Culpeper County
Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- U.S. 522 (Zachary Taylor Highway), alternating lane closures between Route 3 (Germanna Highway) and Cedar Grove Road in the northbound and southbound lanes, daily, 8 a.m. to 4 p.m.
- U.S. 522 (Germanna Highway), between U.S. 15 (James Madison Highway) and U.S. 522 (Zachary Taylor Highway) in the northbound and southbound lanes, daily, 8 a.m. to 4 p.m.
- U.S. 522 (Zachary Taylor Highway), alternating lane closures between Route 652 (Cedar Grove Road) and Route 617 (Racoon Ford Road) in the northbound and southbound lanes, Monday through Friday, 8 a.m. to 4 p.m.
- Route 667 (Nalles Mill Road), alternating lane closures between Route 699 (Keyser Road) and the Culpeper town line in the eastbound and westbound lanes, Thursday and Friday, 9 a.m. to 3:30 p.m.
(UPDATE) U.S. 15 (James Madison Highway) – Paving. Expect alternating lane closures between Elizabeth Street and the Culpeper town line in the northbound and southbound lanes, daily through Friday, 7:30 a.m. to 5:30 p.m.
Route 635 (Hazeland Lane) – Rural rustic repairs. Expect mobile, alternating lane closures between Route 646 (Old Stillhouse Road) and the end of Route 635 in the northbound and southbound lanes.
Fauquier County
(NEW) Pipe repairs/installation – Expect lane and shoulder closures in the following areas:
- U.S. 15 (Lee Highway), left shoulder closed between Route 600 (Broad Run Church Road) and Route 676 (Riley Road) in the northbound and southbound lanes, 7 p.m. Wednesday to 8 a.m. Thursday.
- Route 1437 (Suncrest Drive), alternating lane closures between Route 839 (Porch Road) and the cul-de-sac in the northbound and southbound lanes, daily, 9 a.m. to 4 p.m.
(NEW) Bridge inspections – Expect alternating lane closures, 8 a.m. to 5 p.m. in the following areas:
- U.S. 211 (Lee Highway), at the Culpeper County line in the eastbound and westbound lanes, Tuesday.
- Route 802 (Springs Road) at the Culpeper County line in the northbound and southbound lanes, Monday, 8 a.m. to 5 p.m.
Roadway improvements – Expect lane and shoulder closures, nightly, 8 p.m. to 6 a.m. in the following areas:
- U.S. 17 Business (Broadview Avenue), alternating lane closures between Hospital Drive and Winchester Street in the northbound lanes, nightly, 8 p.m. to 6 a.m.
- U.S. 17 Business (West Shirley Avenue), right through lane and right turn lane closed in the northbound lanes between U.S. 211 (Frost Avene) and Carriage House Lane, daily, 7 a.m. to 5 p.m.
- U.S. 211 Business (Waterloo Street), right lane and right turn lane closed between U.S. 17 Business (Broadview Avenue) and Sullivan Street in the westbound lanes, daily, 7 a.m. to 5 p.m.
(NEW) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- Interstate 66, mobile, alternating lane closures between mile marker 14 and mile marker 37 in the eastbound and westbound lanes, daily and nightly, 7 a.m. to 7 a.m.
- U.S. 15 (James Madison Highway), intermittent lane closures between Route 678 (Academy Hill Road) and Route 687 (Opal Road) in the northbound and southbound lanes, daily, 11 p.m. to 4 a.m.
- Route 55 (John Marshall Highway), alternating lane closures between Route 731 (Cobbler Mountain Road) and Route 729 (Carrington Road) in the eastbound and westbound lanes, daily and nightly, 7 a.m. to 7 a.m.
(UPDATE) Interstate 66 – Shoulder repairs. Expect mobile, alternating lane closures between mile marker 30 and mile marker 33 in the eastbound and westbound lanes, daily, 7 a.m. to 3:30 p.m.
(NEW) U.S. 15 (James Madison Highway) – Other construction. Expect lane and shoulder closures between Route 651 (Freemans Ford Road) and U.S. 15 Business (Remington Road) in the southbound lanes, daily, 9 a.m. to 3 p.m.
Route 802 (Springs Road) – Bridge superstructure repairs/replacement. Alternating lane closures between Route 1133 (Waverly Drive) and Route 682 (Black Snake Road), Monday through Friday, 7 a.m. to 4 p.m.
Route 822 (Distillery Road) – Bridge superstructure repairs/replacement. Road closed between Route 822 cul-de-sac and Route 55 (John Marshall Highway). A temporary road and bridge are in place. Expected completion date is Dec. 2, 2024.
Greene County
(UPDATE) U.S. 29 (Seminole Trail) – Utility work under VDOT permit. Expect right shoulder closures between Route 607 (Cedar Grove Road) and Route 1120 (Lake Saponi Drive) in the southbound lanes, Monday through Friday, 9 p.m. to 6 a.m.
(NEW) U.S. 33 (Spotswood Trail) – Pavement marking repairs. Expect mobile, alternating lane closures between the Rockingham County line and U.S. 29 (Seminole trail in the eastbound and westbound lanes, Sunday through Thursday, 7 p.m. to 6 a.m.
(UPDATE) Route 670 (Preddy Creek Road) – Roadway improvements. Expect alternating lane closures between Route 33 (Daniels Road) and Route 1130 (Lumber Lane) in the eastbound and westbound lanes, daily through Friday, 8 a.m. to 5 p.m.
Louisa County
(NEW) Pipe repairs/installation – Expect lane and shoulder closures in the following areas:
- Interstate 64, left shoulder closed between mile marker 143 and mile marker 145 in the eastbound lanes, daily through Friday, 8 a.m. to 4 p.m.
- U.S. 15 (James Madison Highway, alternating lane closures between the Orange County line and Zion Crossroads in the northbound and southbound lanes, daily, 8 a.m. to 4 p.m.
(NEW) Bridge inspections – Expect alternating lane closures, 8:30 a.m. to 4:30 p.m. in the following areas:
- U.S. 522 (Zachary Taylor Highway), between Route 687 (Daniel Road) and the Spotsylvania County line in the northbound and southbound lanes, Friday.
- Route 614 (Garth Road), between Route 678 (Ridge Road) and Route 1084 (Wind River Road) in the eastbound and westbound lanes, Wednesday.
- Route 622 (Moody Town Road), between Route 652 (Kentucky Springs Road) and Route 1260 (Kubota Circle) in the eastbound and westbound lanes, Monday.
- Route 719 (Days Bridge Road), between U.S. 522 (Zachary Taylor Highway) and Dogwood Tree Lane in the northbound and southbound lanes, Tuesday.
Construction of a new roundabout – Expect alternating lane closures daily, 7 a.m. to 6 p.m. in the following areas. Project anticipated completion date, Jan. 31, 2025.
- U.S. 522 (Zachary Taylor Highway) between Route 623 (Chopping Road) 0.3 miles north of Route 208 (New Bridge Road) in the northbound and southbound lanes.
- Route 208 (New Bridge Road) between U.S. 522 (Zachary Taylor Highway) and Alma Gaynelle Drive in the eastbound and westbound lanes.
Interstate 64 – Vegetation control. Expect mobile, alternating lane closures between mile marker 131 and mile marker 143 in the eastbound and westbound lanes, Monday through Friday, 9 a.m. to 3 p.m.
(NEW) Interstate 64 – Pavement marking. Expect mobile, alternating lane closures between mile marker 131 and mile marker 136 in the eastbound lanes, Sunday through Friday, 7 p.m. to 1 p.m.
(NEW) U.S. 250 (Three Notch Road) – Utility work under VDOT permit. Expect alternating lane closures between Route 688 (Holland Creek Road) and Route 653 (Three Chopt Road) in the eastbound and westbound lanes, Friday, 7 a.m. to 5 p.m.
Route 640 (East Jack Jouett Road) – Bridge repairs. Road closed between Route 613 (Poindexter Road) and Route 617 (Green Springs Road). Expected completion date is Dec. 6.
Madison County
U.S. 29 (South Seminole Trail) – New roadway construction. Expect alternating lane closures between Route 677 (Estes Road) and Route 662 (Shelby Road) in the northbound and southbound lanes, daily, 6 a.m. to 6 p.m.
(NEW) U.S. 29 (North Seminole Trail) – Utility work under VDOT permit. Expect intermittent lane closures between Route 607 (Lillards Ford Road) and Route 647 (Hunter Lane) in the northbound and southbound lanes, nightly through Friday, 9 p.m. to 6 a.m.
(NEW) U.S. 29 (South Seminole Trail) – Paving. Expect alternating lane closures between Route 634 (Washington Street) and Route 631 (Kirtley Road) in the northbound and southbound lanes, daily through Friday, 7 a.m. to 7 p.m.
Orange County
U.S. 522 (Zachary Taylor Highway) – Bridge joint repairs. Alternating lane closures with traffic controlled by flaggers between Route 636 (River Road) and the Culpeper County line, daily through Friday, 7 a.m. to 5 p.m.