VDOT has updated its schedules for road work and maintenance in the Staunton District and Culpeper District for the week of Sept. 23-27.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations.
When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
Staunton District
Alleghany County
Interstate 64
- *UPDATE* Mile marker 7 to 6, westbound – Left lane closures for shoulder repairs, 7 a.m. to 5 p.m. Tuesday.
- *NEW* Mile marker 15 to 23, eastbound and westbound – Right shoulder closures including along Exit 16 and Exit 21 off-ramps for sign work, 8 a.m. to 5 p.m. Monday through Friday.
- *NEW* Mile marker 8 to 11, eastbound and westbound – Alternating lane closures for inspection of bridge over Johnsons Creek, 8:30 a.m. to 4:30 p.m. Tuesday.
- *NEW* Mile marker 38 to 39, eastbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Monday.
*NEW* Route 18 (Potts Creek Road) – Flagger traffic control between Route 615 (Blue Spring Run Road) and Route 652 (Crowder Hollow Road) for inspection of bridges over Potts Creek, 8 a.m. to 4 p.m. Tuesday.
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting, ditching and shoulder repairs. Mobile traffic control for tractor mowing. Weekdays from 7:30 a.m. to 3 p.m.
Various roads – Flagger traffic control for ditch work, shoulder repairs, pothole repairs, pipe replacement and brush cutting. Mobile traffic control for tractor mowing. Weekdays from 7:30 a.m. to 3 p.m.
Bath County
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
Rockbridge County
Interstate 81
- *UPDATE* Mile marker 176 to 177, northbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Wednesday.
- *NEW* Exit 188B, northbound and southbound – Right shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.
- *UPDATE* Mile marker 194 to 195, northbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Thursday.
- *NEW* Mile marker 203 to 205, northbound – Right shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.
- Mile marker 203 to 206, northbound – Overnight alternating lane closures for paving operations, 8 p.m. to 7 a.m. Sunday through Thursday nights, through October 10.
Route 252 (Brownsburg Turnpike) – Flagger traffic control for tree-removal operations between Route 710 (Swope Lane) and Route 762 (Academy Alley), 9 a.m. to 3:30 p.m. Monday through Friday.
Route 700 (Bunker Hill Mill Road) – Closed to through traffic between Route 698 (Round Hill Road) and Route 699 (Wesley Chapel Road) for replacement of Buffalo Creek bridge, through October 10. Follow posted detour.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing, 7:30 to 3 p.m. on weekdays.
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing, 7:30 a.m. to 3 p.m. on weekdays.
Highland County
Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs, 7:30 a.m. to 3 p.m. on weekdays.
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work, 7:30 a.m. to 3 p.m. on weekdays.
Augusta County
Interstate 64
- *UPDATE* Mile marker 92 to 90, westbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5:30 p.m. Wednesday through Friday.
- *UPDATE* Mile marker 95 to 96, eastbound – Overnight right lane and shoulder closures for installation of traffic equipment, 7 p.m. to 5:30 a.m. Monday through Thursday nights.
- *NEW* Exit 96, eastbound – Right shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.
- *UPDATE* Mile marker 98 to 96, westbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5:30 p.m. Monday through Friday.
Interstate 81
- Mile marker 205 to 210, northbound and southbound – Right shoulder closures for utility work, 7 a.m. to 12 noon through Sunday (October 6). Brief traffic stoppages are possible during overhead power-line work.
- Mile marker 220 to 222, northbound and southbound – Shoulders closed 24/7. Overnight single-lane closures as needed. Traffic restrictions are for bridge replacement and roadway construction as part of I-81 southbound auxiliary lane project. Work zone speed limit 60 miles an hour. Expected completion summer 2025.
- *UPDATE* Mile marker 221 to 227, northbound and southbound –Right and left shoulder closures 24/7 through spring 2026. Work zone speed limit 60 miles an hour. Traffic restrictions are for I-81 widening project.
*NEW* Route 250 (Three Notched Mountain Highway) – Eastbound overnight right shoulder closures near I-64 (Exit 99) ramps for traffic equipment installation, 7 p.m. to 5:30 a.m. Monday through Thursday nights.
*NEW* Route 250 (West Broad Street, Waynesboro) – Westbound overnight lane closures between Route 340 (West Main Street) and Route 340 (East Main Street) for rock and soil testing, 9 p.m. to 6 a.m. Sunday and Monday nights (September 29-30).
*NEW* Route 252 (Middlebrook Road) – Flagger traffic control between Route 682 (McKinley Road) and Route 693 (Butter Road) for utility work, 9 a.m. to 2:30 p.m. September 30 – October 17.
Route 608 (Long Meadow Road) – Flagger and pilot-truck traffic control between Route 797 (Miller Road) and Route 641 (Fishersville Road) for paving. Potential for 24-hour operations through October 11.
*UPDATE* Route 624 (South Delphine Avenue, Waynesboro) – Flagger traffic control between Chinquapin Drive and South Oak Lane for utility work, 7 a.m. to 4 p.m. through Monday (September 30).
Route 624 (South Delphine Avenue, Waynesboro) – Shoulder closures between South Oak Lane and Chinquapin Drive for work related to construction of Waynesboro Southern Corridor, through May 2025.
Route 635 (Barterbrook Road) – Closed between I-81 frontage roads (FR-217 and FR-218) for bridge replacement as part of I-81 southbound auxiliary lane project. Follow posted detour. Expected completion summer 2025.
Route 664 (Mount Torrey Road) – Occasional flagger traffic control between Route 624 (Lyndhurst Road) and Route 610 (Howardsville Turnpike) for utility work, 7 a.m. to 5 p.m. through Monday (September 30).
Route 664 (Lyndhurst Road, Waynesboro) – Shoulder closures between Miami Avenue and Purdue Street for work related to construction of Waynesboro Southern Corridor, through June 2025.
*NEW* Route 682 (McKinley Road) – Flagger traffic control between Route 252 (Middlebrook Road) and Route 679 (Campbells Hollow Road) for utility work, 9 a.m. to 2:30 p.m. September 30 – October 17.
*NEW* Route 705 (Scott-Christian Road) – Flagger traffic control between Route 706 (N Mountain Road) and Route 703 (Hewitt Road) for utility work, 9 a.m. to 2:30 p.m. September 30 – October 17.
*NEW* Route 705 (N Mountain Road) – Flagger traffic control between Scott-Christian Road and Route 707 (Trimbles Mill Road) for utility work, 9 a.m. to 2:30 p.m. September 30 – October 17.
*NEW* Various roads – Flagger and pilot truck traffic control for paving operations in subdivisions including parts of Route 1320 (New Brunswick Road), Route 1321 (Princeton Lane), Route 1322 (South Cobblestone Court), Route 1324 (Harrogate Drive), Route 1326 (Warren Circle), Route 1327 (Logan Lane), Route 1332 (Mallory Circle), Route 1333 (Longview Circle), Route 1350 (Summerfield Drive), Route 1404 (Sunset Boulevard), Route 1740 (Sir Robin Road), Route 1741 (Sir Robin Road), Route 1742 (Friar Tuck Court/King Richard Road), Route 1743 (Prince John Court), Route 1744 (Maid Marian Court), and Route 1745 (Little John Court), 6 a.m. to 6 p.m. September 30 – October 11.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 to 3 p.m. on weekdays.
Rockingham County
Interstate 81
- Mile marker 237 to 236, southbound – Overnight alternating lane closures for maintenance to Dices Spring Road overpass bridge, 8 p.m. to 7 a.m. through Thursday night.
- *NEW* Mile marker 238 to 237, southbound – Right shoulder closures for utility work, 7 a.m. to 9 a.m. Sunday (October 6).
- *NEW* Mile marker 238 to 240, northbound – Overnight alternating lane closures for maintenance to bridge over North River, 8 p.m. to 7 a.m. Monday through Thursday nights.
- *NEW* Mile marker 242 to 240, southbound – Right shoulder closures for shoulder repairs, 7:30 a.m. to 5 p.m. Monday through Friday.
- Mile marker 242 to 248, northbound and southbound – Overnight alternating lane closures as needed, 8 p.m. to 7 a.m. through December 2026. Overnight slow-roll closures as needed, 11 p.m. to 5 a.m. Expect delays. 24/7 shoulder closures. Traffic restrictions are related to Route 33 bridge and interchange project.
- *UPDATE* Mile marker 244 to 248, northbound and southbound – Overnight lane closures for rock and soil testing, 8 p.m. to 7 a.m. Estimated completion October 10.
*NEW* Route 11 (Lee Highway) – Northbound right shoulder closures just south of Route 721 (Fellowship Road) for sign work, 8 a.m. to 5 p.m. Monday through Friday.
Route 11 (North Valley Pike/Lee Highway) – Flagger traffic control between Northwood Lane and Route 765 (Gravels Road) for curb and gutter installation, 7 a.m. to 5 p.m. through November 1.
Route 33 (Rawley Pike) – Flagger and pilot-truck traffic control between Dry Run Road and Switzer Lake Road for road widening project, 7:30 a.m. to 5 p.m. through December.
Route 33 (East Market Street, Harrisonburg) –Overnight lane closures eastbound and westbound between Vine Street/Hawkins Street and Terri Drive due to bridge work, 7 p.m. to 5 a.m. nights through January 2026. Single-lane traffic on bridge over railway just west of I-81. Shoulder closures 24/7. Work zone speed limit 25 miles an hour with automated speed enforcement. Traffic restrictions are for Route 33 bridge replacements and interchange improvement.
*NEW* Route 682 (Friedens Church Road) – Eastbound and westbound right lane closures between I-81 interchange and Route 989 (Creekside Drive) for commercial entrance construction, 9 a.m. to 3:30 p.m. September 30 – November 1.
Route 710 (Reservoir Street, Harrisonburg) – Southbound left lane closures as needed between Foley Road and Ridgeville Lane for rock and soil testing, 8:30 a.m. to 5:30 p.m. through Friday.
*NEW* Route 800 (McCauley Drive, Timberville) –Flagger traffic control between Route 42 (South Main Street/Timber Way) and Fourth Avenue for sidewalk construction, 9 a.m. to 3:30 p.m. through May 1.
Various roads – Flagger and pilot truck traffic control for paving operations on various parts of Route 727 (Sangersville Road), Route 1208 (Mill Street, Dayton), Route 1209 (Thompson Street, Dayton), and Route 1210 (Stover Street, Dayton), 7 a.m. to 7 p.m. through Friday.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.
Page County
Route 658 (Pass Run Road) – Closed to through traffic through Monday (October 7) between Route 340 and Route 648 (Sandy Hook Road) due to bridge replacement.
*NEW* Route 676 (Creekside Drive) – Shoulder closures between Route 667 (Dry Run Road) and Route 677 (Eden Road) for utility work, 9 a.m. to 2:30 p.m. Monday and Tuesday.
Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.
Shenandoah County
Interstate 81
- Mile marker 264 to 299, northbound and southbound – Daytime right shoulder closures and overnight (8 p.m. to 7 a.m.) left lane closures for mowing operations and litter pickup, through Monday (September 30).
Route 11 (Old Valley Pike) – Northbound and southbound overnight alternating lane closures for paving operations between Route 663 (Artz Road) and Rockingham County line, 8 p.m. to 6 a.m. nights through Sunday (September 29).
*UPDATE* Route 42 (Senedo Road) – Flagger and pilot truck traffic control between Route 263 (Orkney Grade) and Route 688 (Oak Ridge Road) for paving operations, 7 a.m. to 7 p.m. through October 11.
*NEW* Route 55 (John Marshall Highway) – Right shoulder closures near Route 623 (Back Road) for sign work, 9 a.m. to 3 p.m. Monday through Friday.
Route 691 (Cold Springs Road) – Closed to through traffic between Route 789 (Sam Clark Road) and Route 717 (Liberty Furnace Road) for maintenance to bridge over Laurel Run, 8 a.m. September 23 to 4:30 p.m. October 3. Follow posted detour.
*NEW* Various roads – Flagger and pilot truck traffic control for paving operations on various parts of Route 605 (Hoover Road), Route 645 (Old School House Drive), Route 650 (Tea Berry Road), Route 657 (Mason Road), Route 664 (Moose Road), and Route 780 (Walton Farm Road), 6 a.m. to 7 p.m. September 30 – October 11.
Frederick County
Interstate 81
- Mile marker 317 to 319, northbound and southbound – Overnight right lane closures as needed for extension of exit 317 northbound entrance ramp and southbound exit ramp, 9 p.m. to 6 a.m. nights through October 31.
Route 7 (Berryville Pike) – Overnight eastbound right shoulder closures between I-81 interchange and Valley Mill Road for rock and soil testing, 7 p.m. to 7 a.m. Thursday night.
*NEW* Route 50 (Northwestern Turnpike) – Flagger traffic control between Route 610 (Parishville Road) and Route 703 (Overlook Road/Whitacre Road) for utility work, 8:30 a.m. to 5 p.m. Wednesday.
Route 50 (Northwestern Turnpike) – Eastbound right shoulder closures between Winchester city limits and Route 522 (Front Royal Pike) for traffic signal work, 7 a.m. to 5 p.m. through Sunday (October 6).
*NEW* Route 522 (Frederick Pike) – Flagger traffic control between Route 701 (Read Oak Road) and Route 705 (Ebenezer Church Road) for utility work, 7 a.m. to 10:30 am Sunday October 6.
Route 661 (Redbud Road) – Flagger traffic control between Route 662 (Milburn Road) and Route 660 (Woods Mill Road) for road maintenance, 9 a.m. to 3:30 p.m. through December 31.
Route 662 (Milburn Road) – Flagger traffic control at various locations between Route 661 (Redbud Road) and Route 761 (Old Charles Town Road) for road maintenance, 9 a.m. to 3:30 p.m. through December 31.
Clarke County
Route 7 (Harry Byrd Highway) – Eastbound right lane closures between Route 7 Business (West Main Street) and Route 679 (Pine Grove Road) for utility work, 9 a.m. to 3:30 p.m. through November 1.
Route 7 Business (East Main Street, Berryville) – Flagger traffic control between Route 340 (Buckmarsh Street) and Route 7 (Harry Byrd Highway) for utility work, 9 a.m. to 3:30 p.m. through November 1.
Route 7 (Harry Byrd Highway) – Single lane closures between Route 606 (River Road) and Route 601 (Blueridge Mountain Road) for guardrail installation as part of safety enhancement project. Eastbound lane closures 9 a.m. to 8:30 p.m. weekdays. Westbound lane closures between 8 p.m. and 1 p.m. weekdays or weeknights. Estimated completion October 31.
*NEW* Route 340 (Lord Fairfax Highway) – Alternating lane closures between Route 633 (Annfield Road) and Route 680 (Lindey Lane/Smallwood Lane) for tree trimming operations, 7:30 a.m. to 3 p.m. Monday through Friday.
Route 340 (Lord Fairfax Highway) – Shoulder closures between West Virginia state line and Route 670 (Double Tollgate Road) for utility work, 9 a.m. to 3:30 p.m. through Friday.
*NEW* Route 680 (Smallwood Lane) – Flagger and pilot truck traffic control between Route 340 (Lord Fairfax Highway) and dead end for paving operations, 6 a.m. to 6 p.m. September 30 – October 11.
Warren County
Interstate 66
- Mile marker 0 to 13, eastbound and westbound – Shoulder closures at various locations including along Exit 6 off-ramp for utility work, 7:30 a.m. to 7 p.m. through Monday (September 30).
- Mile marker 7 to 15, eastbound and westbound – Right shoulder closures for utility work, 7:30 a.m. to 5:30 p.m. through Monday (September 30).
- Mile marker 14 to 15, eastbound – Right shoulder closures for utility work, with daytime and nighttime work hours possible. Estimated completion November 1.
Route 340/522 (Winchester Road/Stonewall Jackson Highway) – Northbound right shoulder closures between Success Road and Page County line for utility work, 9 a.m. to 3 p.m. through Friday.
Route 340/522 (Winchester Road) – Southbound right shoulder closures of on-ramp to westbound I-66 for utility work, 7:30 a.m. to 5:30 p.m. through Monday (September 30).
*NEW* Route 647 (Dismal Hollow Road) – Flagger and pilot truck traffic control between Route 624 (Happy Creek Road/Morgan Ford Road) and Route 55 (John Marshall Highway) for paving operations, 6 a.m. to 6 p.m. Monday through October 11.
Route 658 (Rockland Road) – Closed to through traffic between Route 340/522 (Winchester Road) and Route 705 (Fishnet Boulevard) for construction of bridge over Norfolk Southern Railway. Follow posted detour. Estimated completion December 2025.
Culpeper District
Albemarle County
(UPDATE) Tree trimming – Expect lane and shoulder closures in the following areas:
- Interstate 64, between mile marker 107 and mile marker 124 in the eastbound and westbound lanes, daily through Friday, 9 a.m. to 3 p.m.
- Interstate 64, between mile marker 112 and mile marker 115 in the westbound lanes, daily through Friday, 6:30 a.m. to 2 p.m.
(NEW) Vegetation control – Expect mobile, alternating lane closures, Monday through Friday in the following areas:
- Interstate 64, between mile marker 107 and mile marker 114 in the eastbound and westbound lanes, 9 a.m. to 2 p.m.
- Interstate 64, between mile marker 100 and mile marker 132 in the eastbound and westbound lanes, 9 a.m. to 3 p.m.
(NEW) Tree removals – Expect alternating lane closures, Monday through Friday, 7:30 a.m. to 5 p.m.
- Route 6 (Irish Road), at Route 626 (Langhorne Road) in the eastbound and westbound lanes.
- U.S. 29 (Monacan Trail), between Route 805 (Henderson Lane) and Route 632 (Faber Road) in the northbound and southbound lanes.
(UPDATE) Pipe repairs/installation – Expect lane and shoulder closures in the following areas:
- U.S. 29 (Monacan Trail), alternating lane closures between Route 697 (Sutherland Road) and Route 633 (Heards Mountain Road) in the northbound and southbound lanes, daily through Monday, 9 a.m. to 3 p.m.
- Route 697 (Sutherland Road), road closed between U.S. 29 (Monacan Trail) and Hope Lane, 8 p.m. Friday to 6 a.m. Saturday.
(UPDATE) Equipment installation – Expect intermittent lane and shoulder closures, Monday through Thursday in the following areas:
- Interstate 64 eastbound, between mile marker 102 and mile marker 105, 7 p.m. to 5:30 a.m.
- Interstate 64 westbound, between mile marker 107 and mile marker 102, 7 p.m. to 5:30 a.m.
- Interstate 64 eastbound, between mile marker 102 and mile marker 105, 11 a.m. to 9 p.m.
Bridge Superstructure repairs/replacement – Expect lane and shoulder closures in the following areas:
- Route 20 (Scottsville Road), Expect temporary traffic signal with a traffic pattern shift at Route 708 (Red Hill Road). Route 708 is narrowed to one lane for construction on the bridge over the North Fork Hardware River. Please expect delays during high volume times of the day. Project completion date, Dec. 4, 2024.
- Route 824 (Patterson Mill Lane), Road closed to through traffic between U.S. 250 (Rockfish Gap Turnpike) and Route 688 (Midway Road). Expected completion, Oct. 25, 2024.
(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- U.S. 250 (Rockfish Gap Turnpike), alternating lane closures between Route 240 (Crozet Avenue) and Route 797 (Hillsboro Lane) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
- Route 240 (Crozet Avenue), alternating lane closures between Route 691 (Jarmans Gap Road) and Route 240 (Three Notch’d Road) in the northbound and southbound lanes, daily, 9 a.m. to 3:30 p.m.
- Route 240 (Three Notch’d Road), between Route 240 (Crozet Avenue) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
- Route 751 (Brownsville Road), both shoulders closed between Route 240 (Crozet Avenue) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 1:30 p.m.
- Route 797 (Hillsboro Lane), right shoulder closures between U.S. 250 (Rockfish Gap Turnpike) and Route 684 (Half Mile Branch Road) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
(UPDATE) Interstate 64 – Bridge painting. Expect alternating lane closures between mile marker 128 and mile marker 129 in the eastbound and westbound lanes, nightly through Thursday, 7 p.m. to 7 a.m.
U.S. 29 (Seminole Trail) – Roadway improvements. Expect alternating lane closures between Route 3416 (Angus Road) and Seminole Court in the northbound and southbound lanes, nightly, Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday.
(NEW) U.S. 250 (Rockfish Gap Turnpike) – Pavement marking repairs. Expect mobile, alternating lane closures between the Nelson County line and the Fluvanna County line in the eastbound and westbound lanes, nightly, starting Tuesday, 7 p.m. to 6 a.m.
Route 20 (Scottsville Road) – Signal installations. Expect both shoulders at Route 712 (Coles Rolling Road) in the northbound and southbound lanes, daily, 7 a.m. to 5 a.m.
(NEW) Route 631 (Rio Road East) – Roadway sweeping. Expect mobile, alternating lane closures between U.S. 29 (Seminole Trail) and the Charlottesville city line in the northbound and southbound lanes, Monday and Tuesday, 3:30 a.m. to 6 a.m.
Route 729 (Milton Road) – Shoulder repairs. Expect alternating lane closures between Route 1120 (Milton Hills Drive) and Route 53 (Thomas Jefferson Parkway) in the northbound lanes, daily, 8 a.m. to 6 p.m.
(NEW) Route 743 (Advance Mills Road) – Bridge inspection. Expect alternating lane closures between Route 605 (Durrett Ridge Road) and Route 53 (Thomas Jefferson Parkway) in the northbound lanes, Thursday, 8:30 a.m. and 4:30 p.m.
Route 797 (Hillsboro Lane) – Rehabilitation project. Expect alternating lane closures between Route 684 (Half Mile Branch Road) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
City of Charlottesville
Roadway improvements – Expect alternating lane closures Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday in the following areas:
- U.S. 250 (Bypass), between Route 3412 (Dairy Road) and the ramp to U.S. 29 (Emmet Street) in the northbound and southbound lanes.
- Route 743 (Hydraulic Road), between Route 3431 (Brandywine Drive) and U.S. 29 (Seminole Trail) in the eastbound and westbound lanes.
Culpeper County
Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- U.S. 522 (Zachary Taylor Highway), alternating lane closures between Route 3 (Germanna Highway) and Cedar Grove Road in the northbound and southbound lanes, daily, 8 a.m. to 4 p.m.
- U.S. 522 (Germanna Highway), between U.S. 15 (James Madison Highway) and U.S. 522 (Zachary Taylor Highway) in the northbound and southbound lanes, daily, 8 a.m. to 4 p.m.
- U.S. 522 (Zachary Taylor Highway), alternating lane closures between Route 652 (Cedar Grove Road) and Route 617 (Racoon Ford Road) in the northbound and southbound lanes, Monday through Friday, 8 a.m. to 4 p.m.
- Route 667 (Nalles Mill Road), alternating lane closures between Route 699 (Keyser Road) and the Culpeper town line in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
U.S. 15 (James Madison Highway) – Paving. Expect alternating lane closures between Elizabeth Street and the Culpeper town line in the northbound and southbound lanes, daily, 7:30 a.m. to 5:30 p.m.
(NEW) U.S. 522 (Zachary Taylor Highway) – Ditch cleaning. Expect mobile work zone with right shoulder closures between Route 617 (Winston Road) and Route 652 (Cedar Grove Road) in the northbound and southbound lanes, Tuesday and Wednesday, 9 a.m. to 2:30 p.m.
(NEW) Route 614 (Locust Dale Road) – Bridge maintenance. Road closed at the Madison County line, Tuesday and Wednesday, 7 a.m. to 5 p.m.
Route 635 (Hazeland Lane) – Rural rustic repairs. Expect mobile, alternating lane closures between Route 646 (Old Stillhouse Road) and the end of Route 635 in the northbound and southbound lanes.
Fauquier County
Roadway improvements – Expect lane and shoulder closures, nightly, 8 p.m. to 6 a.m. in the following areas:
- U.S. 17 Business (Broadview Avenue), alternating lane closures in the northbound and southbound lanes between Hospital Drive and Winchester Street.
- U.S. 211 Business (Waterloo Street), right lane and right shoulder closures between U.S. 17 Business (Broadview Avenue) and Sullivan Street.
(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- Interstate 66, mobile, alternating lane closures between mile marker 14 and mile marker 37 in the eastbound and westbound lanes, daily and nightly, 7 a.m. to 7 a.m.
- U.S. 15 (James Madison Highway), intermittent lane closures between Route 678 (Academy Hill Extended) and Route 687 (Opal Road) in the northbound and southbound lanes, nightly, 11 p.m. to 4 a.m.
- Route 55 (John Marshall Highway), alternating lane closures between Route 731 (Cobbler Mountain Road) and Route 729 (Carrington Road) in the eastbound and westbound lanes, daily and nightly, 7 a.m. to 7 a.m.
- Route 55 (John Marshall Highway) at Route 724 (Pleasant Vale Road), alternating lane closures in the eastbound and westbound lanes, daily and nightly through Tuesday, 7 a.m. to 7 a.m.
- Route 245 (Old Tavern Road), mobile, alternating lane closures at Route 845 (Old Winchester Road) in the northbound and southbound lanes, daily through Monday, 9 a.m. to 3 p.m.
- Route 710 (Rectortown Road), alternating lane closures between Route 1008 (Mountainview Avenue) and Route 717 (Chestnut Forks Road) in the northbound and southbound lanes Monday through Friday, 6:30 a.m. to 5 p.m.
- Route 1537 (Mint Springs Drive), alternating lane closures between Route 1483 (Whippoorwill Drive) and Rector Farm Road in the northbound and southbound lanes, daily through Friday, 9 a.m. to 4 p.m.
Interstate 66 – Shoulder repairs. Expect mobile, alternating lane closures between mile marker 30 and mile marker 33 in the eastbound and westbound lanes, daily through Friday, 7 a.m. to 3:30 p.m.
(NEW) U.S. 17 (Marsh Road) – Signal repairs. Expect left shoulder closure between Route 28 (Catlett Road) and Route 859 (Village Center Drive) in the northbound lanes, daily through Tuesday, 9 a.m. to 3:30 p.m.
Route 802 (Springs Road) – Bridge superstructure repairs/replacement. Alternating lane closures between Route 1133 (Waverly Drive) and Route 682 (Black Snake Road), Monday through Friday, 7 a.m. to 4 p.m.
Route 822 (Distillery Road) – Bridge superstructure repairs/replacement. Road closed between Route 822 cul-de-sac and Route 55 (John Marshall Highway). A temporary road and bridge are in place. Expected completion date is Dec. 2, 2024.
(UPDATE) Route 1437 (Suncrest Drive) – Pipe repairs/installation. Expect alternating lane closures between Route 839 (Porch Road) and the cul-de-sac in the northbound and southbound lanes, daily, 7 a.m. to 4 p.m.
Greene County
(NEW) U.S. 33 (Spotswood Trail) – Pavement marking repairs. Expect mobile, alternating lane closures between U.S. 29 (Seminole Trail) and the Rockingham County line in the eastbound and westbound lanes, nightly, through Tuesday, 7 p.m. to 6 a.m.
(UPDATE) Route 230 (Madison Road) – Paving. Expect alternating lane closures with flaggers between the Madison County line and U.S. 33 Business (Main Street), daily through Friday, 7 a.m. to 7 p.m.
(UPDATE) Route 670 (Preddy Creek Road) – Roadway improvements. Expect alternating lane closures between Route 33 (Daniels Road) and Route 1130 (Lumber Lane) in the eastbound and westbound lanes, daily through Friday, 8 a.m. to 5 p.m.
Louisa County
Construction of a new roundabout – Expect alternating lane closures daily, 7 a.m. to 6 p.m. in the following areas. Project anticipated completion date, Jan. 31, 2025.
- U.S. 522 (Zachary Taylor Highway) between Route 623 (Chopping Road) 0.3 miles north of Route 208 (New Bridge Road) in the northbound and southbound lanes.
- Route 208 (New Bridge Road) between U.S. 522 (Zachary Taylor Highway) and Alma Gaynelle Drive in the eastbound and westbound lanes.
(NEW) Pipe repairs/installation – Expect lane and shoulder closures in the following areas:
- Interstate 64, left shoulder closed between mile marker 143 and mile marker 145 in the eastbound lanes, Monday through Friday, 8 a.m. to 4 p.m.
- U.S. 15 (James Madison Highway), alternating lane closures between the Orange County line and Interstate 64 in the northbound and southbound lanes, daily beginning Tuesday, 8 a.m. to 4 p.m.
(NEW) Bridge inspections – Expect lane and shoulder closures, Wednesday, 8:30 a.m. to 4:30 p.m. in the following areas:
- U.S. 522 (Zachary Taylor Highway), alternating lane closures with flaggers between Route 208 (New Bridge Road) and Route 1017 (Virginia Way) in the northbound and southbound lanes.
- Route 699 (Indian Creek Road), road closed between Route 640 (East Old Mountain Road) and U.S. 522 (Cross County Road).
Interstate 64 – Vegetation control. Expect mobile, alternating lane closures between mile marker 131 and mile marker 143 in the eastbound and westbound lanes, Monday through Friday, 9 a.m. to 3 p.m.
(NEW) U.S. 250 (Three Notch Road) – Utility work under VDOT permit. Expect alternating lane closures between Route 688 (Holland Creek Road) and Route 653 (Three Chopt Road) in the eastbound and westbound lanes, Thursday, 7 a.m. to 5 p.m.
Route 640 (East Jack Jouett Road) – Bridge repairs. Road closed between Route 613 (Poindexter Road) and Route 617 (Green Springs Road). Expected completion date is Dec. 6.
Madison County
U.S. 29 (South Seminole Trail) – New roadway construction. Expect alternating lane closures between Route 677 (Estes Road) and Route 662 (Shelby Road) in the northbound and southbound lanes, daily, 6 a.m. to 6 p.m.
Orange County
U.S. 522 (Zachary Taylor Highway) – Debris pick-up. Expect alternating lane closures between Route 719 (Belmont Road) and the Spotsylvania County line in the northbound and southbound lanes, Thursday, 9 a.m. to 2:30 p.m.