Home Route 29 ramps to Route 250 Bypass in Charlottesville closed overnight Thursday
Local

Route 29 ramps to Route 250 Bypass in Charlottesville closed overnight Thursday

Chris Graham

route 29The entrance ramps from Route 29 (Emmet Street) southbound onto the Route 250 Bypass will be closed overnight Thursday while construction crews restripe lane markings on the westbound ramp where it will be widened for an additional lane. The work will also require closing the right lane on Route 250 Bypass west from the Emmet Street overpass to the Barracks Road exit and the right lane of Emmet Street south from north of Angus Road to the Route 250 Bypass east entrance ramp.

During the work, which will begin at 9 p.m. Thursday and be completed by 6 a.m. Friday, traffic will be detoured south to Barracks Road, then west to the Route 250 Bypass interchange where motorists can enter the Bypass heading east or west.

A similar ramp closure and detour will be required next week on Monday and Tuesday nights from 9 p.m. to 6 a.m. to set concrete barrier walls along the Route 250 Bypass westbound entrance ramp. If Thursday night’s work must be postponed due to inclement weather it will be done Friday beginning at 10 p.m., ending by 6 a.m. Saturday.

Charlottesville-based Fielder’s Choice Enterprises Inc. is building the interchange improvements, which include adding an additional lane to the southbound entrance ramp from Emmet Street onto the Route 250 Bypass, lengthening the merge area and adding an additional lane on Route 250 west to the Barracks Road exit. It also includes an additional southbound lane on Route 29, from south of Hydraulic Road to the interchange.

The interchange improvement project is the first roadway improvement in the Route 29 Solutions package to advance to construction. The contract has a fixed completion date of May 21, 2016. The project is part of a package of eight in Charlottesville and Albemarle County that will improve safety, increase capacity and efficiency along Route 29 and provide alternate routes on parallel roads.

Information about the Route 29 Solutions package can be found on VDOT’s web site at:  www.Route29Solutions.org.

Support AFP




Multimedia

 

Chris Graham

Chris Graham

Chris Graham is the founder and editor of Augusta Free Press. A 1994 alum of the University of Virginia, Chris is the author and co-author of seven books, including Poverty of Imagination, a memoir published in 2019. For his commentaries on news, sports and politics, go to his YouTube page, TikTok, BlueSky, or subscribe to Substack or his Street Knowledge podcast. Email Chris at [email protected].

Latest News

glenn youngkin
Virginia

Glenn Youngkin is the latest former Virginia governor to cash in on his political ties

acc football
Football

Review: Dumb USA Today column ranks ACC Football programs, 1-17

I got an email from a reader about a USA Today column on ACC Football that was obviously published just because they don’t have much else going on right now for their college sports guys.

school crossing sign
Local

Albemarle County school administrator placed on leave amid sexual harassment probe

An assistant superintendent at Albemarle County Public Schools has been placed on leave amid accusations of sexual harassment against female employees and the head of a volunteer school advocacy group.

Douglas Woodside
Local

Waynesboro teacher’s aide tried to force hand sanitizer into student’s mouth

rivanna water pipeline
Local

Charlottesville: Blasting work scheduled for Friday on water line project

waynesboro map
Local

Waynesboro gets approval for planning grant for community kitchen

cats
Local

Local animal shelter faces emergency situation with new cat intakes