Home Route 29 Solutions Traffic Alerts: Week of Nov. 7-11
News

Route 29 Solutions Traffic Alerts: Week of Nov. 7-11

AFP

route 29 solutionsThe following work is scheduled, weather permitting, on the Route 29 corridor in Albemarle County and the city of Charlottesville during the upcoming week. Speed limits may be reduced and traffic movements may be restricted within highway work zones.

(NEW) or (UPDATE) indicate revisions since last week’s report.

(UPDATE) Rio Road grade-separated intersection – Motorists should follow overhead and ground-mounted signs to guide them through the project area. Sunday through Friday the following overnight lane closures will be in effect.

On Route 29 north and south of the Rio Road intersection:

  • Between 9 p.m. and 6 a.m. Sunday through Friday, there will be at least one lane open both northbound and southbound
  • All business entrances will remain open during business hours
  • Turning movements at the Rio Road signal, including left turns and U-turns, may be restricted between 9 p.m. and 6 a.m.

On Rio Road east and west of Route 29:

  • Between 9 p.m. and 6 a.m., the crossover, U-turn and left-turn movements from Rio Road onto Route 29 and from Route 29 onto Rio Road may be restricted
  • All business entrances will remain open during business hours

During the overnight closures additional detour signs, cones and other traffic controls will direct motorists through the work zone. The speed limit remains 35 mph at all times. The nighttime work will continue for the next several months.

(UPDATE) Route 29 widening – Southbound traffic is on a new alignment from Hollymead Town Center to just north of Route 643 (Polo Grounds Road). Motorists should follow directional signs guiding them through the work zone. Travel lanes are narrowed and shoulders are closed within the work zone and the speed limit is reduced to 40 mph. Expect intermittent single lane closures Monday through Friday between 9 p.m. and 6 a.m. Motorists should remain alert and use caution through the work zone.

Berkmar Drive Extended – Bridge construction may require brief, intermittent closures of Rio Mills Road between Route 29 and Millers Cottage Lane while materials are delivered. On Towncenter Drive in the vicinity of the roundabout, motorists should be alert for dump trucks and other equipment entering and exiting the roadway.

Hillsdale Drive Extended – Obey traffic controls and expect minor delays on Hillsdale Drive, Hydraulic Road, India Road, Zan Road, Greenbrier Drive, Pepsi Place and Seminole Court. For project updates, visit http://hillsdaledrive.org.

Support AFP




Multimedia

 

AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

ben cline
Virginia

Why is Ben Cline so concerned about the Daughters of the American Revolution?

uva football beau pribula
Football

The Athletic ranks QBs from 1-138: Where does UVA’s Beau Pribula fit in?

Sam Khan Jr. and Antonio Morales at The Athletic put their names to a ranking of the 138 projected starting quarterbacks in FCS football this week.

tv
Virginia

State AGs fighting merger of Trump-friendly broadcast companies Nexstar, Tegna

A bipartisan group of state AGs is raising issue with the efforts of broadcast companies Tegna and Nexstar Media Group to continue toward a merger in violation of a preliminary injunction issued earlier this year.

police court law
Local

Local animal care nonprofit head found guilty in animal cruelty case

steven wayne erickson pulaski
Virginia

Justice Department charges Pulaski Town Council member in CSAM case

car accident crash police
Local

Rockingham County: State Police identify victim in fatal pedestrian crash

glenn youngkin
Virginia

Glenn Youngkin is the latest former Virginia governor to cash in on his political ties