Home VDOT: Expect overnight closures, detours, slow-roll control on I-81 near Staunton
Local

VDOT: Expect overnight closures, detours, slow-roll control on I-81 near Staunton

Rebecca Barnabi
interstate 81
(© Eli Wilson/Wirestock – stock.adobe.com)

VDOT has announced that bridge work on Interstate 81 in Augusta County near Staunton requires overnight closures, detours and slow-roll traffic control (rolling roadblocks) during the week of Monday, Aug. 26.

The traffic restrictions will be between mile markers 220 and 221, and allow contractors for the Virginia Department of Transportation to build a new Route 635 (Barterbrook Road) bridge over the interstate.

Details are as follows:

Monday night, Aug. 26 from 8 p.m. to 7 a.m., southbound I-81 will have alternating lane closures.

Tuesday night, Aug. 27: Between 11 p.m. and 5 a.m., southbound I-81 will close periodically for no more than 20 minutes at a time. Virginia State Police will manage slow-roll traffic control on southbound I-81 between exits 225 and 220 in the Staunton area, and on westbound I-64 between exit 91 (Fishersville) and the I-81 interchange.

Southbound I-81 left-lane closures are scheduled for 8-11 p.m. Monday night, and from 5-7 a.m. early Tuesday morning.

Wednesday and Thursday nights, Aug. 28 and 29

  • From 11 p.m. to 5 a.m., northbound I-81 will be fully closed.
  • Northbound I-81 drivers will detour at exit 220 onto Route 262 (Woodrow Wilson Parkway) around Staunton and rejoin I-81 at exit 225.
  • Northbound I-81 drivers who need to access I-64 eastbound at exit 221 will follow the detour route, then take I-81 southbound to exit 221.

Background

A slow roll is a traffic management operation where a traffic gap is created by reducing approaching traffic speeds to as low as 10 mph. The gap allows work, such as bridge beam placement, to safely take place free of live traffic. Traffic can also be temporarily stopped and held by a lead vehicle in each lane.

Signs and digital message boards will advise motorists of the closures and associated detour routes. All work is weather permitting, and the schedule is subject to change.

The Route 635 overpass bridge replacement is part of a project to construct a new auxiliary lane on southbound I-81 between exit 221 (I-64 junction) and exit 220 (Route 262 south). Route 635 in the area of the bridge over I-81 is closed through mid-2025 due to the bridge replacement. Detour routes and information are on the VDOT project page.

The I-81 southbound auxiliary lane and Route 635 bridge replacement project is part of the I-81 Corridor Improvement Program (CIP), to improve safety, increase reliability and foster economic growth along the 325-mile corridor in Virginia. Additional information about the program is at online.

Support AFP




Multimedia

 

Latest News

ragged mountain reservoir spill
Local

Rivanna Water & Sewer Authority reports fuel spill on Ragged Mountain Reservoir

waynesboro map
Local

Waynesboro: Mayor tips city’s hand on where things are going on Mimosa Farm request

The Waynesboro Planning Commission voted 4-2 on Tuesday night to recommend that Waynesboro City Council approve the request for a conditional use permit allowing Mimosa Farm to continue hosting events.

ben cline
Virginia

Why is Ben Cline so concerned about the Daughters of the American Revolution?

From time to time, I receive emails from Congressman Ben Cline. In the latest message, Mr. Cline highlights his bill prohibiting transgender individuals from joining the Daughters of the American Revolution.

uva football beau pribula
Football

The Athletic ranks QBs from 1-138: Where does UVA’s Beau Pribula fit in?

tv
Virginia

State AGs fighting merger of Trump-friendly broadcast companies Nexstar, Tegna

police court law
Local

Local animal care nonprofit head found guilty in animal cruelty case

steven wayne erickson pulaski
Virginia

Justice Department charges Pulaski Town Council member in CSAM case