Highway work in the Lynchburg District requiring road/lane/structure closures is planned; however, work may be delayed/canceled due to weather or other issues. Items in italics contain new/updated information. For up-to-date information, call 511 or visit www.511Virginia.org.

District-wide activities:

Crews will perform various maintenance activities throughout the district. Activities include, but are not limited to bridge & guardrail maintenance, brush cutting, tree/limb cutting, surface/shoulder work, work orders, mowing, boom axing, drainage repairs/work and roadside cleanup.

Amherst County:  

Route 29  – Crew will make storm water basin repairs.  

Routes 60 (778 – 686), 130 (1240-679), 689 & 690– Crew will work shoulders.

Route 210 @ Route 163 – Crew will work signals.

Please note districtwide activities above.

Appomattox County:

Please note districtwide activities above.

Buckingham County:  

Please note districtwide activities above.

Campbell County:  

Route 29- Shoulder widening, rumble strip installation to begin in early April. Comp. November 2020.

Route 29 Bus., Altavista –Closed w/detour during bridge replacement. Est. comp. May 2021.

Route 29 Bus @ 1466 – Construction of right turn lane. Completion – August 21, 2020.

Route 501 (607-655) – Shoulder widening to begin and complete by October 9, 2020.

Route 757 (660 – 656) – Railroad will perform crossing work on March 30. Alternate routes available.

Route 607 – Crew will work Rural Rustic project.

Route 622 – Road reconstruction and bridge over Flat Creek. Delays possible. Est. comp. Sept. 2021.

Please note districtwide activities above.

Charlotte County:   

Routes 615 & 656 – Crew will work ditches.

Route 619 –Mainline pipe installation may result in delays.

Route 652, Craftons Gate AHQ – Crew will work Rural Rustic project.

Please note districtwide activities above.

Cumberland County:  

Route 45 – Contractor will undertake debris removal on structure.

Routes 635 & 653 – Crew will perform Rural Rustic work.

Please note districtwide activities above.

Halifax County:  

Route 58 W, Cluster Springs AHQ – Crew will boom axe.

Route 683 (680-685) – Closed for bridge replacement. Detour 683, VA 360 & 680. Est. comp. – 8/20.

Please note districtwide activities above.

Lynchburg:

Odd Fellows Road –Temporary lane closures possible during completion of project.

Nelson County:  

Route 29/151 intersection – Crew will perform sign work.

Route 56 – Joint repairs continue on westbound lane of structure.

Route 151 (Piney River area – 56 W) – Crew will work shoulders and ditches.

Route 620 – Closed for bridge repairs – May 18-July 10, 2020. Temporary alternate access available.

Routes 626 & 655 – Crew will boom axe.

Route 628 & 794 – Crew will work Rural Rustic projects.

Routes 632 and 748 – Crew will patch surfaces.

Route 655 – Patching on bridge. Be alert.

Routes 676 & 678 – Crew will ditch.

Please note districtwide activities above.

Pittsylvania County:  

Route 29 N over NS Rail-Left lane closed for repairs; 11’ right lane. Estimated completion – late March.

Route 29 N over Banister River – Single lane on bridge. Signs and other traffic control in use.

Route 40 over Pigg River – Construct temp.bridge. 45 mph,, flagging. Comp. structure- summer 2020.

Route 58 @ Route 311 – Turn lane construction will take place. Comp. 12/18/2020.

Route 715 – Closed to through traffic for pipe replacement. Est. comp. July 30, 2020. Detour in place.

Route 730 over Sandy Creek – Bridge and approach work. Completion October 16, 2020.

Route 738, Mt. Airy AHQ  – Crew will work on Rural Rustic project.

Please note districtwide activities above.

Prince Edward County:  

Routes 360 and 460 – Crew will boom axe and cut behind guardrail.

Route 460 intersection @ Route 307 – Intersection reconstruction to begin. Comp. 11/20/2020.

Route 622 (360-624) – Closed for bridge, approach work over NSRR. Detour via 622 to 360 to 360B/460E to 724 and 624 back to 622. Est. comp. September 2020.

Please note districtwide activities above.

Multimedia

 




AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

uva pep band
Football, Go 'Hoos

UVA Football: It’s been a while since we played WVU. Wonder why?

acc football
Football

ACC Football: Details on the 10-game Saturday schedule in Week 3

The schedule for ACC Football on Saturday for Week 3 – 10 games, beginning at noon, ending around 11 p.m. My view on the games of the day: #16 SMU (FPI: 24) at #23 Louisville (FPI: 28) #25 Virginia (FPI: 25) vs. West Virginia (FPI: 61) Virginia Tech (FPI: 31) at Maryland (FPI: 45) FSU...

Kejuan Augustus Anthony
Region/State

Charlottesville Police announce arrest in Sept. 12 shooting on Downtown Mall

Charlottesville Police announced an arrest in the Sept. 12 shooting incident reported on the Downtown Mall.

police officer on city street at night
Local

William Perry Elementary School student found with BB gun in bookbag

abigail spanberger
Richmond

Spanberger rolls out Data Center Accountability Framework: ‘Step in the right direction’

police car arrest lights
Local

Harrisonburg teen charged with making threat to Westwood Hills Elementary School

construction liability insurance home
Local

Another construction fraud case on the local court docket: Who can you trust?