Home Harrisonburg: Route 33 to close during overnight hours Tuesday for bridge work
Local

Harrisonburg: Route 33 to close during overnight hours Tuesday for bridge work

Rebecca Barnabi
interstate 81 i-81
(© Eli Wilson/Wirestock – stock.adobe.com)

Route 33 (East Market Street) in the City of Harrisonburg will be closed in both directions between South Carlton Street and Linda Lane/Burgess Road from 1 to 6 a.m. on Tuesday, May 20.

The full Route 33 detour route will be necessary to allow the contractor to perform bridge deck pour operations on the new Route 33 bridge over the Norfolk Southern Railroad.

The work is part of ongoing construction on Route 33 at the Interstate 81 exit 247 interchange in Harrisonburg.

The following detour will be used:
Westbound Route 33 drivers will turn left on Burgess Road, right on Evelyn Byrd Avenue, right on Reservoir Street, and then right on South Carlton Street to return to Route 33.

Eastbound Route 33 drivers will turn right on South Carlton Street, left on Reservoir Street, left on Evelyn Byrd Avenue, and then left on Burgess Road to return to Route 33.

I-81 southbound and northbound Exit 247B will be closed during the detour hours. A message board will be posted on I-81 to alert drivers.

All southbound I-81 drivers who need to access Route 33 during the detour hours will take exit 247A. Digital message signs will then guide eastbound Route 33 drivers to follow the posted detour route.

All northbound I-81 drivers who need to access Route 33 during detour hours will take exit 247A. Digital message signs will then guide eastbound Route 33 drivers to follow the posted detour route.

All work is weather permitting and the schedule is subject to change. The Virginia Department of Transportation will provide updates as needed.

VDOT contractors are replacing the two Route 33 bridges over I-81 at exit 247 and the two railway bridges just west of the interchange. The project also includes several improvements to the exit 247 interchange. A work-zone speed limit of 25 miles an hour is in place on Route 33 for the duration of the project, which is scheduled for completion in summer 2026. Additional information is available on the VDOT project page.

In July 2022, a $43.3 million contract was awarded to Triton Construction Inc. of Virginia, headquartered in St. Albans, W.Va.

 

Featured Video

Latest News

ECHL NHL norfolk admirals ice hockey puck
Sports

ECHL 2026/27: Norfolk Admirals hope bold affiliate move will pay dividends

school student child bookbag
Local

How do our local school systems rank in the 2026 School Performance report?

The governor’s office has released the findings from the 2026 School Performance and Support Framework, giving us a snapshot of the performance the more than 1,800 elementary, middle and high schools across the Commonwealth.

uva football tony elliott
Football

UVA Football: Tony Elliott didn’t like a reporter’s question on his team quitting

We all saw the incredible amount of quit from our UVA Football program, from the players to the head coach, as last week’s 38-7 loss at Florida State was playing out.

jmu forbes center
Region

Harrisonburg: Musical instrument sale to benefit JMU School of Music

staunton library terrace
Local

Staunton Library terrace project completed; grand opening set for Friday

acc football
Football

ACC Football: Week 6 slate features seven conference matchups

soccer sunset football gloves match
Go 'Hoos

Men’s Soccer: Virginia flurries early, holds on late for 4-3 win over Queens