Home Construction at Route 29-Rio Road will continue through Memorial Day weekend
News

Construction at Route 29-Rio Road will continue through Memorial Day weekend

AFP

route 29Construction on the Rio Road grade-separated intersection will continue over the Memorial Day holiday weekend. Most of the construction is happening behind barrier walls so there should be minimal impacts to motorists, but travelers should be alert for dump trucks and other vehicles turning in or out of the work zone.

Motorists will encounter traffic restrictions from approximately one-half mile north to one-half mile south of the intersection. Message boards and signs will direct motorists through the work zone. The speed limit within the project work zone is 35 mph at all times.

On Route 29 north and south of the Rio Road intersection:

  • Between 6 a.m. and 9 p.m. there will be two lanes southbound and three lanes northbound
  • Right turns onto Rio Road will be permitted at all times
  • No left turns at the intersection at any time
  • Between 9 p.m. and 6 a.m. there will be at least one lane open both northbound and southbound
  • All business entrances will remain open during business hours

On Rio Road east and west of Route 29:

  • Traffic on Rio Road will not be able to cross Route 29
  • Right turns onto Route 29 will be permitted at all times
  • No left turns at the intersection at any time
  • All business entrances will remain open during business hours

Alternate travel routes during the construction are Berkmar Drive to Rio Road, Woodbrook Drive or Hilton Heights Drive, and Hillsdale Drive to Branchlands Drive. Information about the project and resources to help navigate through the work zone during construction can be found on the Route 29 Solutions web site: www.Route29Solutions.org. Real time traffic information, including access to the traffic cameras in the Charlottesville region, is on the home page. Also available on the web site:

  • Get Around Map with details of permitted movements and traffic restrictions at the Route 29-Rio Road intersection
  • Alternate Routes Map of signed detour routes during construction

The Get Around Maps are also available at businesses in the project area.

The Rio Road grade-separated intersection project is one of eight Route 29 Solutions highway projects to improve safety and increase mobility along the Route 29 corridor in Charlottesville and Albemarle County. Information about upcoming lane closures and other traffic impacts, as well as news about the projects, is posted on the Route 29 Solutions web site on the News and Traffic Alerts page.

Multimedia

 




AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

uva pep band
Football, Go 'Hoos

UVA Football: It’s been a while since we played WVU. Wonder why?

acc football
Football

ACC Football: Details on the 10-game Saturday schedule in Week 3

The schedule for ACC Football on Saturday for Week 3 – 10 games, beginning at noon, ending around 11 p.m. My view on the games of the day: #16 SMU (FPI: 24) at #23 Louisville (FPI: 28) #25 Virginia (FPI: 25) vs. West Virginia (FPI: 61) Virginia Tech (FPI: 31) at Maryland (FPI: 45) FSU...

Kejuan Augustus Anthony
Region/State

Charlottesville Police announce arrest in Sept. 12 shooting on Downtown Mall

Charlottesville Police announced an arrest in the Sept. 12 shooting incident reported on the Downtown Mall.

police officer on city street at night
Local

William Perry Elementary School student found with BB gun in bookbag

abigail spanberger
Richmond

Spanberger rolls out Data Center Accountability Framework: ‘Step in the right direction’

police car arrest lights
Local

Harrisonburg teen charged with making threat to Westwood Hills Elementary School

construction liability insurance home
Local

Another construction fraud case on the local court docket: Who can you trust?