Home Harrisonburg: Westbound lane closures on Route 33 for bridge work start Jan. 28
Local

Harrisonburg: Westbound lane closures on Route 33 for bridge work start Jan. 28

Rebecca Barnabi
interstate 81 Harrisonburg
(© Eli Wilson/Wirestock – stock.adobe.com)

Bridge deck work will require 24-hour closures from Tuesday, Jan. 28 to Tuesday, Feb. 4, on all westbound lanes on the Route 33 (East Market Street) bridge over Interstate 81 in Harrisonburg.

The work is part of the ongoing bridge and interchange project at I-81 exit 247. The closures will begin at 2 p.m. on January 28. The closure is necessary for the pouring operations and curing time for new bridge decks.

Advance warning digital message boards will be posted on the westbound lanes of Route 33 and also on the northbound lanes of I-81 on Friday, January 24, 2025, to alert motorists of the upcoming closures.

The westbound Route 33 lane closures will extend from the intersection of Linda Lane and Burgess Road and continue across the I-81 overpass bridge.

Drivers should use the following detour:

Westbound Route 33 drivers will turn left on Burgess Road, right on Evelyn Byrd Avenue, right on Reservoir Street, and the right on South Carlton Street to return to Route 33.

The I-81 exit 247 entrance ramp onto northbound I-81 from westbound Route 33, will remain open during this time period.

The I-81 northbound exit 247B ramp onto westbound Route 33 will be closed during the same time period.

All northbound I-81 drivers who need to access westbound Route 33 during the closure will take exit 247A. Digital message boards will be posted along I-81 northbound lanes in advance of exit 247, alerting motorists that exit ramp 247B will be closed and to use exit 247A. Detour signs will then guide drivers wishing to go westbound on Route 33 to follow the posted detour route.

All work is weather permitting and the schedule is subject to change. The Virginia Department of Transportation will provide updates as necessary.

VDOT contractors are replacing the two Route 33 bridges over I-81 at exit 247 and the two railway bridges just west of the interchange. The project also includes several improvements to the exit 247 interchange. A work-zone speed limit of 25 miles an hour is in place on Route 33 for the duration of the project, which is scheduled for completion in summer 2026. Additional information is available on the VDOT project page.

In July 2022 a $43.3 million contract was awarded to Triton Construction Inc. of Virginia, headquartered in St. Albans, W.Va.

Support AFP




Latest News

house cracks wealth sale home poverty unhoused
Virginia

AG Jay Jones announces settlement in case with ‘slumlord from hell’

smoke wildfires canada
Local

Local area under Code Red Air Quality Alert: How to take precautions

The Virginia DEQ has issued a Code Red Air Quality Alert for our local area for Friday, with the Air Quality Index in the “Very Unhealthy” range as a result of smoke wafting down from Canadian wildfires.

Adam Dunigan
Virginia

Interview: Can Adam Dunigan pull the upset of Don Beyer in the Eighth District primary?

There’s an alternate universe, in which the Virginia Supreme Court follows the law instead of trying to write it, in which Adam Dunigan is running for a congressional nomination in a district that represents Augusta County.

roanoke airport sign 581 220 bristol interstate 81 exit 143
Virginia

Emergency roadwork on I-81 will impact drivers in Salem, Roanoke County

beth macy ben cline
Virginia

Ben Cline is raising more money in Hollywood, but Beth Macy is holding her own in Virginia

homeless man sleeping on street bench
Local

Charlottesville to begin ‘transition’ of residents from homeless encampment

donald trump
U.S. & World

Dazed, confused Trump goes on about ‘burn bags’ in TV speech about elections