Home Traffic alert on Route 250 Interchange project
Local

Traffic alert on Route 250 Interchange project

Contributors

road-work-headerWork continues on the ramps serving McIntire Road and John W. Parkway at the Route 250 Bypass interchange in Charlottesville as temporary asphalt is removed, permanent curbing added, and grading/landscaping is finalized. Ramp closures are to be expected weekdays between 9am and 4pm from Monday, March 16th until Tuesday, March 31st. Formal detour signage will be in place.

Work zone is posted at 25 MPH – please drive carefully.

For project information, please visit www.250interchange.org.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.