The Staunton District is comprised of 11 counties: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren. Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
(NEW) or (UPDATE) indicates a new entry or a revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
(NEW) Mile marker 0 to 41, eastbound and westbound – Lane closures for bridge sweeping, Wednesday to Friday, 7 a.m. to 8 p.m.
(UPDATE) Mile marker 0 to 41, eastbound and westbound – Shoulder repairs from mile marker 9 to 0 Wednesday through Friday, 7 a.m. to 8 p.m. In other locations, watch for crews removing debris, trimming trees, cleaning bridge slopes and around culverts and drainage areas, Monday to Friday, 8 a.m. to 5 p.m. Weed-eating and litter removal, Sunday toWednesday, 7 a.m. to 7 p.m.
Mile marker 36 to 31, westbound – Alternating lane closures for paving operations through September 26, 6 a.m. to 8 p.m.
PRIMARY ROADS
Various roads – Patching with flagger traffic control. Monday to Friday, 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Route 687 (Jackson River Road) – Flagger controlled traffic for paving, pavement marking and guardrail work from Route 641 to the Bath County line. Monday through Saturday, 6 a.m. to 9 p.m. Estimated completion October 1.
Various roads – Patching with flagger traffic control. Monday to Friday, 7:30 a.m. to 3 p.m.
BATH COUNTY
PRIMARY ROADS
Various roads – Mowing with a mobile operation at various locations. Monday to Friday, 7:30 a.m. to 3 p.m.
SECONDARY ROADS
(NEW) Route 627 (Scottstown Draft Road) – 24/7 “stop and proceed” traffic control begins 8 a.m. September 26 for bridge replacement over tributary of Stuart Run. Work zone is 4.8 miles east of Route 678 and 0.3 mile west of Route 629 (Deerfield Road). Estimated completion October 19.
Various roads – Patching and ditching with flagger controlled traffic. Mowing with a mobile operation. Monday to Friday,7:30 to 3 p.m.
ROCKBRIDGE COUNTY
INTERSTATE 64
(NEW) Mile marker 41 to 57, eastbound and westbound – Lane closures for bridge sweeping, Monday to Friday, 7 a.m. to 8 p.m.
Mile marker 41 to 57, eastbound and westbound – Be alert for crews removing debris and cleaning paved ditches and drop inlets between mile markers 41 and 45, Monday to Friday, 8 a.m. to 5 p.m.
Mile marker 53 to 55, eastbound and westbound – Single-lane traffic through work zone. Westbound drivers use a median crossover to access the eastbound side of the interstate. After crossing the bridge, westbound drivers follow a second crossover to return to the I-64 westbound mainline. Eastbound traffic limited to the right lane. Work zone speed limit 55 miles an hour. Estimated project completion summer 2017.
INTERSTATE 81
Mile marker 174 to 205, northbound and southbound – Watch for crews removing debris, cleaning paved ditches, around box culverts, drain pipes and ditches, trimming trees and mowing storm water ponds. Monday to Friday, 8 a.m. to 5 p.m.
(NEW) Mile marker 192, southbound – Shoulder closure for sign installation.
(NEW) Mile marker 202, northbound – Shoulder closure for sign installation.
Mile marker 206 to 198, southbound – Right shoulder closures for fiber optic installation, Monday to Friday. Estimated completion September 30.
PRIMARY ROADS
(UPDATE) Route 60 – Daytime lane closures for bridge work over I-81 (exit 188). Estimated completion September 30.
Various roads – Paving and patching, ditching, pipe replacement, tree removal, street sweeping and pothole repairs with flagger traffic control. Mowing with a mobile operation. Monday to Friday, 7:30 to 3 p.m.
SECONDARY ROADS
Route 708 (Gilmore Mill Road) – Road closed for bridge replacement at Cedar Creek just east of Route 608 (Shafer Lane). Detour using Route 608 and Route 130 (Wert Faulkner Highway). Estimated completion late 2016.
(NEW) Route 714 (Mackeys Lane) – Road closed September 19-30 for bridge replacement over tributary of Sheep Creek. Detours: Motorists approaching from Route 11 (Lee Highway) will detour onto Route 712 (Walucman Drive) and then Route 706 (Borden Grant Trail) to the end of the detour. Motorists approaching from Route 706 will detour onto Route 716 (Timber Ridge Road) and then Route 11 to the end of the detour.
Various roads – Paving and patching, ditching, pipe replacement, tree removal, street sweeping, grading and pothole repairs with flagger traffic control. Mowing with mobile operation. Monday to Friday, 7:30 to 3 p.m.
HIGHLAND COUNTY
PRIMARY ROADS
(NEW) Route 250 (Monterey) – Shoulder closures 7 a.m. to 5 p.m. Monday to Friday for sidewalk work at intersections with Wilson Avenue, Potomac River Road, Water Street, Spruce Street, Walnut Street and Mill Alley. Sidewalks in these areas will be closed to pedestrians and an accessible path will be maintained by the contractor. Estimated completion October 21.
Various roads – Mowing with a mobile operation at various locations. Monday to Friday, 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Route 600 (Back Creek Road Upper and Lower) and Route 607 (Big Valley Road) – Flagger traffic control for ditching at various locations. Monday to Friday, 7:30 a.m. to 3 p.m.
Route 609 (Burnsville Road) – Flagger traffic control for pipe installation. Monday to Friday, 7:30 a.m. to 3 p.m.
Route 614 (Cowpasture River Road) – Flagger traffic control for pipe installation north of Route 250, grading south of Route 250. Monday to Friday, 7:30 a.m. to 3 p.m.
Route 678 (Bullpasture River Road) – Flagger traffic control for pipe installation. Monday to Friday, 7:30 a.m. to 3 p.m.
Various roads – Mowing at various locations with a mobile operation. Patching at various locations with flagger traffic control. Monday to Friday, 7:30 a.m. to 3 p.m.
AUGUSTA COUNTY
INTERSTATE 64
Mile marker 87 to 100, eastbound and westbound – Be alert for crews removing debris, trimming trees, cleaning bridge slopes, paved ditches and inlets. Monday to Friday, 8 a.m. to 5p.m.
Mile marker 94 to 107, eastbound and westbound – Right shoulder closures for installation of traffic-management system.Monday to Friday, 7 a.m. to 7 p.m. Estimated completion September 30.
INTERSTATE 81
Mile marker 205 to 237, northbound and southbound – Be alert for crews removing debris, trimming trees, cleaning paved ditches, culverts, pipes and other drainage structures at various locations. Monday to Friday, 8 a.m. to 5 p.m.
Mile marker 207 to 209, northbound – Left or right lane closures Sunday through Friday nights, 8 p.m. to 7 a.m., for paving, drainage work, guardrail and rumble strip installation. Estimated completion early December.
(UPDATE) Mile marker 211.5, northbound – Overnight lane closure for bridge work, seven nights a week, 8 p.m. to 7 a.m.Estimated completion September 30.
Mile marker 223 to 228, southbound – Right shoulder closures Monday to Saturday for fiber optics installation. Estimated completion September 30.
(UPDATE) Mile marker 225, northbound and southbound – Overnight lane closures for bridge work, seven nights a week, 8 p.m. to 7 a.m. Estimated completion September 30.
PRIMARY ROADS
Route 11 (Lee-Jackson Highway) – Right shoulder closures and intermittent lane closures for utility work from Route 800 (Folly Mill Road) to Route 871 (Cochran’s Mill Road). Monday to Friday. Estimated completion September 30.
Route 11 (Lee Highway) – Shoulder closure for fiber installation from Route 781 (Bald Rock Road) to Verona Elementary School. Estimated completion September 30.
Route 11 (Lee Highway) – Shoulder closure for fiber installation from Route 1920 (Sutton Road) to Staunton city limits. Estimated completion September 30.
(UPDATE) Route 42 (Scenic Highway) – Flagger controlled traffic 0.8 mile north of Route 250 (Hankey Mountain Highway) for bridge maintenance. September 26 to 29.
Route 42 (Scenic Highway) – Right shoulder closures for utility work from Route 613 (Spring Hill Road) to Route 728 (Stover Shop Road). Monday to Friday. Estimated completion September 30.
Route 42 (Little Calfpasture Highway) – Right shoulder closures and intermittent lane closures for utility work from Route 254 (Buffalo Gap) to Town of Craigsville. Monday to Friday. Estimated completion September 30.
Route 250 (Three Notched Mountain Highway) – Right shoulder closures for installation of traffic-management system. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion September 30.
Route 250 (Churchville Avenue) – Shoulder closure for fiber installation from Route 722 (Vinegar Hill Road) to Route 42 (Scenic Highway). Estimated completion September 30.
Route 250 (Churchville Avenue) – Bridge replacement over Whiskey Creek, just east of intersection with Route 722 (Vinegar Hill Road). Occasional lane/shoulder closures as contractors relocate utilities and build a temporary bridge and approaches. Work zone speed limit is 25 miles an hour. Traffic will detour onto the two-lane temporary bridge in fall 2016.
Route 254 (Parkersburg Turnpike) – Shoulder closure for fiber installation from Route 42 (Buffalo Gap) to Staunton City limits. Estimated completion September 30.
Route 340 – Right shoulder closures for installation of traffic-management system. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion September 30.
Route 340 (Main Street, Waynesboro) – Road closed between Constitution Park and East Avenue for replacement of South River bridge. Through traffic will use Broad Street (Route 250) as detour route. Local traffic has access to all businesses and residences throughout the project. Estimated completion late 2017.
SECONDARY ROADS
(UPDATE) Route 603 (Cales Springs Road) – Road closed to through traffic for bridge deck replacement through noon on September 20. Work zone 1.55 mile east of Route 677 (Shermiah Road) to 0.60 mile west of Route 602 (Summerdean Road). Detour from west of bridge: Turn south onto Route 602, then east onto Route 677 and then back to Route 603. Detour from east of bridge: Turn west on Route 677, then north onto Route 602, and then back to Route 603.
Route 612 at Route 792 (Laurel Hill Road/Indian Mound Road, Verona) – Lane closures with flagger traffic control are possible Monday to Friday from 9 a.m. to 3 p.m. During other times, motorists should be alert for shoulder closures and construction vehicles moving in and out of the work zone. Estimated completion spring 2017.
Route 624 (South Delphine Avenue) – Right shoulder closures for installation of traffic-management system. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion September 30.
Route 641 (Fishersville Road) – Intermittent lane and shoulder closures from Route 608 (Long Meadow Road) to Route 1360 (Westminster Drive) for water line upgrades. Monday to Friday. Estimated completion fall 2016.
Route 685 (Lehigh Road, Craigsville) – Road closed for bridge replacement over Little Calfpasture River between Route 684 and Route 42. Detour in place. Estimated completion late 2016.
(NEW) Route 701 (Howardsville Road) – Shoulder closure for fiber installation from Route 11 (Lee-Jackson Highway) to Route 697 (Old Greenville Road). Estimated completion October 30.
(UPDATE) Route 720 (Jerusalem Chapel Road) – Weekday flagger traffic control just south of Route 250 (Hankey Mountain Highway) for bridge maintenance. September 26 through October 4.
Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.
ROCKINGHAM COUNTY
INTERSTATE 81
Mile marker 237 to 264, northbound and southbound – Watch for crews removing debris, performing mile marker sign maintenance, and hand mowing around signs and concrete ditches. Monday to Friday, 7:30 a.m. to 4 p.m. Pothole repairs as needed.
(UPDATE) Mile marker 242, northbound and southbound – Overnight lane closures for bridge work, seven nights a week, 8 p.m. to 7 a.m. Estimated completion September 30.
Mile marker 245, northbound and southbound – Overnight lane closures for bridge work, seven nights a week, 8 p.m. to 7 a.m. Estimated completion September 30.
PRIMARY ROADS
Route 11 (Lee Highway) – Replacement of North River bridge. Watch for traffic shifts, shoulder closures and flagger controlled lane closures, 7 a.m. to 5:30 p.m. Work zone from Route 694 to one mile south of Mount Crawford. Variable message boards and pavement markings direct motorists. Estimated completion July 2017.
(NEW) Route 33 Business (Old Spotswood Trail, Elkton) – Nighttime flagger controlled lane closure 7 p.m. to 7 a.m. for paving and shoulder work. Work zone from 0.66 miles east of Route 33 to Route 340 (near Blue and Gold Drive). Sunday through Thursday. Estimated completion September 30.
Route 253 (Port Republic Road) – Periodic flagging as part of intersection improvements at Route 340 (East Side Highway). Monday to Friday, 8 a.m. to 4 p.m. Estimated completion fall 2016.
(UPDATE) Route 257 (Ottobine Road) – Flagger controlled lane closure 7 a.m. to 7 p.m. for pavement marking and shoulder stone placement from Route 731 (Community Center Road) to 0.16 miles east of Route 613 (Spring Creek Road). Monday to Friday, with possible Saturdays. Estimated completion September 23.
(NEW) Route 340 (Stuart Avenue, Elkton) – Nighttime flagger controlled lane closure 7 p.m. to 7 a.m. for paving and shoulder work. Work zone from Spotswood Avenue to Route Summit Avenue. Sunday through Thursday. Estimated completion September 30.
Route 340 (East Side Highway) – Periodic flagging as part of intersection improvements at Route 253/659 (Port Republic Road). Monday to Friday, 8 a.m. to 4 p.m. Estimated completion fall 2016.
SECONDARY ROADS
Route 602 (East Point Road) – Single lane closure as needed for utility maintenance between Route 33 and Route 646. Estimated completion September 30.
Route 641 (Cave Hill Road) – Road closed near McGaheysville between Route 991 (Jacob Burner Road) and Route 843 (Cemetery Road) for Stony Run bridge replacement. Temporary bridge serves as 24/7 detour with a stop-and-proceed work zone in place. Estimated completion is mid-October.
Route 659 (Port Republic Road) – Periodic flagging as part of intersection improvements at Route 340. Monday to Friday, 8 a.m. to 4 p.m. Estimated completion fall 2016.
Route 704 (Cecil Wampler Road) – Flagger controlled, intermittent right shoulder and lane closures for installation of water lines. Monday through Friday, 8 a.m. to 5 p.m. Work zone between I-81 and Route 679 (Pleasant Valley Road). Estimated completion September 30.
(NEW) Route 778 (Brenenman Church Road) – Road closed October 3 to 7 from Route 42 to Route 910 (Grist Mill Road) for drainage repairs. A 24/7 detour will be in place using Route 721. All work weather permitting.
Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.
PAGE COUNTY
PRIMARY ROADS
Route 340 – Intermittent flagging operations for replacement of bridge and approaches at Cub Run. Monday to Friday, 7 a.m. to 4:30 p.m. Work zone speed limit is 45 miles per hour. Estimated completion September 2017.
(NEW) Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.
SECONDARY ROADS
Various roads – Pavement patching and mowing at various locations. Monday to Friday, 7:30 to 3 p.m. Estimated completion September 30.
Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.
SHENANDOAH COUNTY
INTERSTATE 81
Mile marker 264 to 300, northbound and southbound – Watch for crews removing debris and cleaning under guardrails. Monday to Friday, 7:30 a.m. to 4 p.m. Pothole repairs as needed.
(NEW) Mile marker 267 to 268 – Shoulder closures for bridge inspection of Route 767 (Quicksburg Road) overpass bridge. September 21, 8 a.m. to 5 p.m.
(NEW) Mile marker 270, northbound – Shoulder closure for sign installation.
(NEW) Mile marker 272 to 273 – Shoulder closures for bridge inspection of Route 292 (Mount Jackson Road) overpass bridge. September 19, 8 a.m. to 5 p.m.
Mile marker 279, northbound and southbound – Nighttime, alternating lane closures for maintenance on bridges over Route 185 and Stoney Creek in Edinburg area. Monday to Friday, 8 a.m. to 7 a.m. Estimated completion October 16.
(UPDATE) Mile marker 287 to 283, southbound – Nightly lane closures for guardrail replacement. Monday to Friday, 8 p.m. to 7 a.m. Estimated completion September 30.
(NEW) Mile marker 291 to 292 – Shoulder closures for bridge inspection of Route 646 (Mount Hebron Road) overpass bridge. September 20, 8 a.m. to 5 p.m.
(UPDATE) Mile marker 292 to 296, northbound – Nightly lane closures for guardrail replacement. Monday to Friday, 8 p.m. to 7 a.m. Estimated completion September 30.
(NEW) Exit 296 on- and off-ramps, southbound (Strasburg area at Route 55) – Nighttime ramp closures for paving work September 19 and 20, beginning at 10 p.m. and ending at 5 a.m. the following morning on each date. Traffic will use exit 291 and exit 298 as detours.
(UPDATE) Mile marker 298 to 292, southbound – Nightly lane closures for milling, paving and pavement marking. Monday to Friday, 8 p.m. to 7 a.m. Estimated completion September 30.
PRIMARY ROADS
Route 185 (Stoney Creek Road) – Flagger controlled lane and shoulder closures as needed for maintenance on I-81 overpass bridges. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion October 16.
(NEW) Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.
SECONDARY ROADS
Queen Street (Route 1201, Town of Strasburg) – Road closed between South Massanutten Street and Holiday Street for bridge replacement over Town Run. Detour in place. Estimated completion November 2016.
(NEW) Route 623 (Coal Mine Road, Wheatfield area) – Daytime road closures over Cedar Creek bridge for soil testing on September 19 to 23, 9 a.m. to 3 p.m. each day. Traffic will be controlled with barricades and detour signs. Posted detour from Route 622 (Cedar Creek Grade) to Route 628 (Middle Road) to Route 48 (John Marshall Highway), back to Route 623 and end of detour. Estimated completion 5 p.m. on September 23.
Route 663 (Artz Road) – Bridge replacement over the North Fork of the Shenandoah River. The road will remain open during construction of the new bridge, with flagger controlled traffic 7 a.m. to 7 p.m. Monday to Friday. Estimated completion May 2018.
Various roads – Utility tree trimming. Flagger control during daylight hours. Monday through Friday.
Various roads – Patching and mowing. Monday to Friday.
FREDERICK COUNTY
INTERSTATE 66
No lane closures reported.
INTERSTATE 81
Mile marker 300 to 324, northbound and southbound –Watch for crews removing debris Monday and Friday, 7:30 a.m. to 4 p.m. Pothole repairs as needed.
(UPDATE) Mile marker 310 to 311, northbound and southbound – Overnight right lane closures September 22, from 8 p.m. to 6 a.m. the following morning, and September 23, from 10 p.m. to 8 a.m. the following morning. On- and off-ramps at exit 310 remain open during these operations. This work is part Exit 310 interchange project. Right and left shoulders closed 24/7. Speed limit 60 mph through work zone. Motorists should be alert for trucks entering and exiting work zone. Estimated project completion May 2018.
PRIMARY ROADS
Route 37 at I-81 Exit 310 (Kernstown Interchange Project), northbound and southbound – Speed limit on Route 37 reduced to 35 mph through work zone. Newly built portion of Route 37 is open. Drivers should be alert for traffic pattern change at intersection with Route 642 (Tasker Road). Estimated project completion May 2018.
(UPDATE) Route 522 (North Frederick Pike/Cross Junction) – Right shoulder closures 0.19 miles north of Route 682 (Chapel Hill Road) for replacement of traffic management equipment. Nightly, Monday to Friday from 9 p.m. to 5 a.m. Estimated completion September 23.
(NEW) Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.
SECONDARY ROADS
(NEW) Route 623 (Fromans Road, Wheatfield area) – Daytime road closures over Cedar Creek bridge for soil testing on September 19 to 23, 9 a.m. to 3 p.m. each day. Traffic will be controlled with barricades and detour signs. Posted detour from Route 622 (Cedar Creek Grade) to Route 628 (Middle Road) to Route 48 (John Marshall Highway), back to Route 623 and end of detour. Estimated completion 5 p.m. on September 23.
Route 642 (Tasker Road, Kernstown Interchange Project) – The speed limit on Route 642 is 45 miles per hour through the work zone. The newly built portion of Route 642 is now open. Motorists should be alert for traffic pattern changes at intersections with Route 37 and Route 847 (Hillandale). Estimated project completion May 2018.
Route 847 (Hillandale Lane, Kernstown Interchange Project) – Newly built portion of Route 847 is open. Motorists should be alert for traffic pattern changes at intersection with Route 642 (Tasker Road). Estimated project completion May 2018.
(UPDATE) Various locations – Flagger controlled traffic for paving operations Monday – Friday, 7 a.m. to 7 p.m. in the following locations: Valley Mill Estates (Route 1285), Millrace Estates (Routes 1270, 1271, 1272, 1273 and 1274), Hill Valley (Routes 1283 and 1284), Merriman Estates (Routes 1303, 1304, 1305, 1306, 1307, 1342 and 1346), Westside Station (Routes 1338 and 1339). Estimated completion date September 30.
(UPDATE) Various roads – Ditching, patching and mowing. Monday to Friday.
Various roads – Utility tree trimming. Flagger control during daylight hours. Monday through Friday.
CLARKE COUNTY
PRIMARY ROADS
(NEW) Route 340 – Single lane closures for inspection of Route 7 overpass bridge. September 21, 9 a.m. to 3 p.m.
(NEW) Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.
SECONDARY ROADS
Various roads – Mowing. Monday to Friday.
WARREN COUNTY
INTERSTATE 66
Mile marker 0 to 15, westbound and eastbound – Watch for crews removing debris, cleaning ditches and repairing fences. Monday through Friday, 7:30 a.m. to 4 p.m. Pothole repairs as needed.
INTERSTATE 81
(NEW) Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.
PRIMARY ROADS
Route 55 (Strasburg Road) – Intersection modification at Route 340/522 (Shenandoah Avenue/Winchester Road). Lane closures as needed Monday to Friday, 9 a.m. to 3 p.m. daily and 9 p.m. to 7 a.m. nightly. Temporary traffic signal at 55/340/522 intersection. Temporary traffic switch for east and west lanes from 340/522 to .03 miles (A. S. Rhodes Elementary School) west of 340/522. Pavement markings, signs and traffic barrels will guide drivers through this area. Changes in effect through summer 2017 for construction of new travel lanes. Estimated project completion December 2017.
Route 340/522 (Shenandoah Avenue/Winchester Road) – South Fork bridge replacement and intersection modification at Route 55 (Strasburg Road). Lane closures as needed Monday to Friday, 9 a.m. to 3 p.m. daily and 9 p.m. to 7 a.m. nightly. Lane shift at 17th street and temporary traffic signal at 340/522/55 intersection, placing all traffic on the newly constructed bridge. 18th street is open to traffic, with left turn restrictions until summer 2017. Demolition of old South Fork bridge and construction of new bridge continues. Estimated project completion December 2017.
SECONDARY ROADS
Route 624 (Morgan Ford Road) – Road closed for bridge replacement over the Shenandoah River. Work zone from Route 643 (Howellsville Road) to Route 661 (Fairground Road). Detours: Drivers south of the bridge will turn right on Route 643 (Howellsville Road), which changes to Route 603 and then to Route 638 in Clarke County. Drivers will then turn left on Route 17/50 (John Mosby Highway) and left on Route 624 (Red Gate Road/Milldale Road) to reach the end of the detour. Drivers north of the bridge will follow Route 624 (Milldale Road/Red Gate Road) north and turn right on Route 17/50 (John Mosby Highway) in Clarke County. Drivers will then turn right on Route 638 (Howellsville Road), which changes to Route 603 and then Route 643, to reach the end of the detour. Estimated project completion June 2018.
Route 647 (Dismal Hollow Road) – Crews expanding Linden Park & Ride lot. Watch for increased truck traffic and intermittent flagging operations for excavation work, stone placement and paving operations. Monday-Friday, 7 a.m. to 7 p.m. Estimated completion October 2016.
(UPDATE) Various routes – Flagger controlled traffic for surface treatment, Monday to Friday, 7 a.m. to 7 p.m. Route 602(Moore Road) from Route 604 (Harmony Hollow Road) to Route 724 (4H Center Drive); Route 604 (Harmony Hollow Road) from Route 600 (Hickerson Hollow Road) to Route 522 (Remount Road); Route 606 (Shenandoah Shores Road) from Front Royal town limits to Riverview Shores Drive; Route 643 (Howellsville Road) from Route 624 (Morgan Ford Road) to Route 603 (Oregon Hollow Road); Route 647 (Dismal Hollow Road) from Route 55 (John Marshall Highway) to Route 624 (Happy Creek Road); Route 656 (Loop Road) from south of Front Royal town limits to one mile east of Front Royal town limits; Route 671 (Harmony Orchard Road) from Route 604 (Harmony Hollow Road) to dead end. Estimated completion September 23.
Various roads – Utility tree trimming. Flagger control during daylight hours. Monday through Friday.
Various roads – Mowing and patching. Monday to Friday.
Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.
Traffic alerts and traveler information can be obtained by dialing 511 and at 511Virginia.org. For other assistance call the VDOT Customer Service Center 24 hours a day, seven days a week. Dial 1-800-FOR-ROAD (1-800-367-7623) from anywhere in the state to report road hazards, ask transportation questions, or get information related to Virginia’s roads.