Home Moving forward at the fire department
Local

Moving forward at the fire department

AFP

Story by Chris Graham
[email protected]

Things are moving forward on the West End fire station project. What happens when the station is ready to open for business is another question.

“We were already behind when the deputy fire marshal and deputy fire chief were cut from the budget last year. So even when we got our deputy fire chief back in place this year, we were just catching up. All it means is that what had been a five-year plan is now a six-year plan,” Waynesboro fire chief Charlie Scott told me this week.

I had been under the impression from having talked with Scott earlier this year that he would be able to staff the new fire station, which is on track to be open and operational by mid-2010, from existing manpower. The reason for my misimpression on that was a misread on my part of the actual situation, from Scott’s view, that the staffing problem that he currently faces would be a problem even if there was no new fire station coming online.

The city fire department right now has three rotating shifts of two three-man engine companies. Scott believes that to meet national staffing standards for cities the size of Waynesboro that he would need to add a fourth person to each of the engine-company shifts, and then add three shifts of a third four-man company.

That issue will come to a head as work on the West End fire station proceeds. The city is expected to select a firm to handle the architectural and engineering portion of the work on the new fire station by the end of July.

The 8,000-square-foot facility might also include colocation space for the city police department and the Waynesboro First Aid Crew.

 
 




Featured Video

 

AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple Podcasts, Spotify, Pandora and YouTube. Support AFP by signing up for our newsletter and/or powering our work with a one-time or monthly contribution.

Latest News

uva football
Football, Go 'Hoos

Live Coverage: UVA Football faces Wake Forest on trick-or-treat day

UVA Health
Local

UVA Health acquires State Farms operations center on Pantops

UVA Health announced on Friday that it has acquired the 365,000-square-foot former State Farm operations center on Pantops, which will allow the health system to free up additional capacity at University Hospital to expand inpatient care.

vdot road construction
Local

VDOT: Local road construction, maintenance on the schedule for the week

VDOT has released its updated list of ongoing road construction and maintenance projects for local drivers.

Gary Critzer Waynesboro
Local

Waynesboro: Gary Critzer inducted into Virginia Life Saving and Rescue Hall of Fame

Pillar to Post Pro-Wrestling Podcast
Pro Wrestling

Ray Petree | Terry Funk vs. Leatherface: Two sons of Texas facing off in Japan

acc basketball
Basketball

Women’s Basketball: ACC schedule for 2026-2027 opens on Sunday

soccer Somalia
Go 'Hoos, Sports

Men’s Soccer: UVA settles for draw with #18 Pitt; season on the brink