
During the closure, which extends through Aug. 1, a VDOT crew will repair several components of the steel-truss bridge to maintain its current three-ton posted weight limit. The bridge was built in 1924 and carries approximately 170 vehicles per day, according to a 2013 traffic count.
Motorists will be detoured south on Route 29 to Route 1571 (Lewis and Clark Drive), then right on Quail Run, which carries motorists back to Route 606. Access to all businesses and residences will be maintained during the work.
For more information about Virginia’s bridges and VDOT’s bridge inspection program, including current conditions of the state’s bridges, FAQs and video of a bridge inspection, visit www.virginiadot.org/info/Bridge.asp.