Home VDOT to hold design public hearing tonight on replacement of Route 680 bridge in Albemarle
Local

VDOT to hold design public hearing tonight on replacement of Route 680 bridge in Albemarle

Rebecca Barnabi
road work
(© John Alphonse – stock.adobe.com)

The Virginia Department of Transportation proposes to replace the Route 680 (Browns Gap Turnpike) bridge over Lickinghole Creek in Albemarle County.

At a design public hearing today, the public will have the opportunity to view project plans, speak with members of the project team and provide comments. The public hearing will be held at Brownsville Elementary School, 5870 Rockfish Gap Turnpike, Crozet, VA, 22932, from 5 to 7 p.m. All comments received at the public hearing, and during the 10-day comment period after the hearing, will be reviewed by the project team and included in the public hearing record.

In case of inclement weather the hearing will be held on Monday, July 15, 2024. The location and time will remain the same.

The steel beam and timber deck superstructure of the 1932-era bridge on Route 680 (Browns Gap Turnpike) over Lickinghole Creek, which is posted with a 23-ton weight limit, is structurally deficient and requires rehabilitation. The proposed $4.7 million project, funded by the State of Good Repair program, will replace the bridge with a footprint closely matching the existing one. However, the new bridge will be wider to meet current VDOT standards for local rural roads. The existing superstructure will be replaced with a prestressed concrete voided slab section and an asphalt overlay. 

The new bridge will be open to all legal-weight vehicles. According to a 2021 traffic count, the bridge carries approximately 536 vehicles per day. During construction, a detour will be posted for motorists and access to all properties will be maintained.

The project will be advertised for bids in spring 2027 with construction beginning in the fall of 2027. The project will be coordinated with the upcoming construction of a roundabout at the U.S. 250/Route 240 intersection. More information is available on the project web page. Property impact information and tentative construction schedules will be available at the public hearing.

Comments may be made at the hearing or submitted by Monday, July 22, 2024, to Mr. Anwar Yasin, Project Manager, Virginia Department of Transportation, 1601 Orange Road, Culpeper, VA 22701. Comments may also be emailed to [email protected].  Reference “Route 680 Bridge Replacement Comment” in the subject line.

 
 




Featured Video

 

Latest News

vdot road
Local

VDOT: Local road work, maintenance on the schedule for Oct. 26-30

college basketball
Basketball

JMU rallies to force OT, but VCU pulls out win, 92-87, in preseason contest

JMU rallied from 10 down in the final 3:56 to force OT, but VCU’s Blake Harper poured in 11 of his game-high 30 points in the extra period to help the Rams to a 92-87 win over the Dukes on Sunday in a preseason contest at the Siegel Center.

kyle guy
Basketball, Go 'Hoos

UVA Basketball: Catching up with Kyle Guy, back playing overseas after coaching gig

Indiana native Kyle Guy helped the UVA Basketball program win the NCAA title in 2019, and he was voted the Most Outstanding Player in the NCAA Tournament that year.

the mason family
Local

How you can help an Augusta County family get through a tough battle with cancer

charlottesville map
Local

Charlottesville Police investigating early morning shooting on 5th Street Extended

uva football beau pribula tony elliott mike ingalls
Football, Go 'Hoos

UVA Football: The deepest dive you will ever get to explain the issues at QB

AI-driven test AI artificial intelligence business workplace automation
Politics, Virginia

Spanberger lays out framework for state AI plan, chides Trump for inaction