Home New traffic patterns at Route 29, Rio Road
News

New traffic patterns at Route 29, Rio Road

AFP

route 29Construction on the Rio Road grade-separated intersection at Route 29 will shift into high gear at 8 p.m. Sunday and motorists will see major traffic pattern changes that will affect travel through the project during the summer.

On Route 29 north and south of the Rio Road intersection:

  • Between 6 a.m. and 9 p.m. there will be two lanes southbound and three lanes northbound
  • Right turns onto Rio Road will be permitted at all times
  • No left turns at the intersection at any time
  • Between 9 p.m. and 6 a.m. there will be at least one lane open both northbound and southbound
  • All business entrances will remain open during business hours

On Rio Road east and west of Route 29:

  • Traffic on Rio Road will not be able to cross Route 29
  • Right turns onto Route 29 will be permitted at all times
  • No left turns at the intersection at any time
  • All business entrances will remain open during business hours

Posted detour routes during the construction will be Berkmar Drive to Woodbrook Drive or Hilton Heights Drive, and Hillsdale Drive to Branchlands Drive. Information about the project and resources to help navigate through the work zone during construction can be found on the Route 29 Solutions web site: www.Route29Solutions.org. Real time traffic information, including access to the traffic cameras in the Charlottesville region, is on the home page. Also available on the web site:

The Get Around Maps are also available at businesses in the project area.

Motorists traveling on Route 29 and Rio Road will see message boards and directional signs advising of the new traffic patterns and detour routes. The speed limit on Route 29 within the
project remains 35 miles per hour at all times.

The Rio Road grade-separated intersection project is one of eight Route 29 Solutions highway projects to improve safety and increase mobility along the Route 29 corridor in Charlottesville and Albemarle County. Information about upcoming lane closures and other traffic impacts, as well as news about the projects, is posted on the Route 29 Solutions web site on the News and Traffic Alerts page.

Support AFP




AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

house for sale
Virginia

Report: Home sales prices in Virginia pushing toward half-million mark

school bus student children backpack
Local

Waynesboro: Back-to-School Bash events set for the next two weekends

Waynesboro Public Schools will host two sessions of its annual Back-to-School Bash – on Sunday, July 26, and Sunday, Aug. 2, with both events running from 1-6 p.m., held at Kate Collins Middle School.

mental health
Virginia

Law center files suit against Hallmark Youthcare, seeking ability to assess issues at facility

A disability rights group has filed a federal lawsuit against the Goochland County-based Hallmark Youthcare after groups of young patients bolted from the behavioral health facility in back-to-back days earlier this month.

us china
U.S. & World

Trump chickens out on China, saying he’ll ‘talk to them’ about 2020 election interference

uva football entrance
Football

UVA Football: ‘Hoos to open 2027 season with Week 0 game against Arkansas State

aew jon moxley
Etc.

AEW star Jon Moxley’s greatest trick: Convincing us he’s on Will Ospreay’s side

washington DC smithsonian national mall downtown metro spring cherry blossom
U.S. & World

MAGA Republicans in Congress once again working to limit home rule in DC