Highway work in the Lynchburg VDOT District requiring road/lane./structure closures is scheduled, weather permitting. Traffic may be restricted. Items in italics contain new/updated information. For up-to-date information, call 511 or visit www.511Virginia.org.
Amherst County: Don Austin, Residency Administrator
Route 130/29 Business, Madison Heights- Paving complete; line marking ongoing.
Route 334 – Sidewalk repairs, marking eradication and paving will occur. Traffic control and flaggers in use. Estimated completion –fall 2015.
Route 501/130 (Snowden) – Traffic control/flaggers in use. Expect delays. End: 4/21/17.
Appomattox County: Don Austin, Residency Administrator
None
Buckingham County: Kevin Wright, Residency Administrator
Route 15 and 20 – Latex surface treatment underway.
Andersonville AHQ– Crews will boom axe.
Dillwyn AHQ – Crews will mow.
Various locations –Crews will make surface repairs and respond to customer requests.
Campbell County: Don Austin, Residency Administrator
Route 24 and 43 – Latex surface treatment underway.
Route 29, .5 miles south of Rt. 699 – Temporary lane closures possible during pipe jacking operations.
Route 29 at Route 688 and Rt 460 @ Rt. 752– Construction of right turn lane. Use caution.
Route 643 over Falling River –Road closed, detour in place through 7/22/16 for bridge replacement and approach work. Traffic control devices/flaggers in use. Expect delays.
Route 698 over Big Seneca Creek– Road closed from Dec. 7-18 for superstructure replacement. Detour in place using Route 701, 697, 699 and 761.
Charlotte County: Kevin Wright, Residency Administrator
Craftons Gate AHQ -Crews will mow at various locations.
Phenix AHQ – Crews will work shoulders and cut brush at various locations.
Various –Crews will make surface repairs and respond to customers.
Cumberland County: Kevin Wright, Residency Administrator
Various locations –Crews will work surfaces, mow and respond to customers.
Halifax County: Kenneth Martin, Residency Administrator
Route 49 over Aaron’s Creek– Bridge project will be complete by 6/17/16.
Route 58– Crews are applying plant mix at various locations.
Route 344, 360 – Contractor crews are applying latex at various locations.
Route 691 over Tobey Creek(Rt 659/658 intersection) – Road closed Dec. 7–March 4 for structure replacement. Detour in place via Routes 659, 662 and 659.
Bethel AHQ – Crews will mow, repair potholes and shoulders.
Cluster Springs AHQ – Crews will mow primary routes. Delays possible.
Volens AHQ – Crews will boom axe and apply stone to shoulders.
Various –Crews will respond to customer requests.
Nelson County: Don Austin, Residency Administrator
None
Pittsylvania County: Kenneth Martin, Residency Administrator
Route 29 Bypass and Route 726 – Crews are applying plant mix.
Route 40 – Contractor crews paving. Use caution and anticipate delays.
Route 57 – Crews are applying latex at various locations.
Route 726 – Construction underway. Signs/traffic control devices in place. Est.comp-4/20/16.
Brosville AHQ – Crews will perform ditching operations.
Gretna AHQ – Crews will clean roadsides and boom axe.
Kentuck AHQ – Crews will make shoulder repairs and boom axe at various locations.
Mt. Airy AHQ – Crews will place stone, repair shoulders and boom axe.
Various –Crews will work surfaces, mow, and respond to customers.
Prince Edward County: Kevin Wright, Residency Administrator
Various routes –. Crews will work surfaces, mow, cut brush, and respond to customers.
District-wide activities:
Bridge and guardrail maintenance – Crews will perform bridge/guardrail maintenance.
Bridge-mounted signs – Foundation work underway. Traffic control devices will assist motorists.
Latex, Plant Mix and Surface Treatment Schedules – Short duration lane closures expected. Estimated completion December 2015.
Pavement markings – Contractors are applying permanent pavement markings districtwide.