
The road will be closed about 0.8-mile from Route 712 (Plank Road). The bridge will reopen to traffic the afternoon of March 29.
Access will be maintained to all commercial and private entrances off Route 717 on both sides of the bridge, but traffic will not be able to travel across the bridge.
Drivers are advised to use alternate routes.
Updates and other real-time travel information can be found on the 511 Virginia website, the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. Local updates are also posted to Twitter.com/VaDOTCulp.