Home Lynchburg District Traffic Alert: Work schedule for week of April 5-11
News

Lynchburg District Traffic Alert: Work schedule for week of April 5-11

AFP
road work
(© Daniel Avram – stock.adobe.com)

Highway work requiring road/lane/structure closures in the Lynchburg District in the coming week. Work may be delayed/canceled due to weather or other issues. Items in italics contain new/updated information. For up-to-date information, call 511 or visit www.511Virginia.org.

District-wide activities:

Crews will perform various construction/maintenance activities throughout the district using the best practices of social distancing. Activities include, but are not limited to bridge & guardrail maintenance, brush/tree/limb cutting, pothole/surface/shoulder work, work orders, pavement messaging, mowing, boom axing, drainage repairs/work and roadside cleanup, including extensive debris removal from recent storms.  

Amherst County:   

Route 29 Bus (Lakeside Dr- Woodys Lake Rd) – Sidewalk construction. Lane closures and delays. Estimated completion November 2021.

Route 60 (635 – 634) – Crew will conduct shoulder work. Flaggers will assist traffic.

Route 130 over RR, w of Madison Heights –Bridgework, single 10’ lane with signal.

Route 681 – Bridge rehab through September 2021. One lane controlled by signal.

Please note districtwide activities above. 

Appomattox County: 

Route 460 – Shoulder widening and rumble strip installation. Estimated completion – Nov 2021.

Please note districtwide activities above. 

Buckingham County:  

Route 20 (south of Route 6 – north of Baldwin Ave) – Closed to thru traffic 3/29-4/9 for pipe work. Detour via Routes 6, 637, 773, 622, 795 and 726 back to 20.

Route 60/56 – Turn lane project. Fixed completion July 30, 2021.

Route 633 – Crew will replace pipe.

Route 636/15 – Turn lane project. Fixed completion October 15, 2021.

Please note districtwide activities above. 

Campbell County:   

Route 29 N over NSRR, near airport – Bridge and approach work; est. comp. May 2023.

Route 29 S (683- Pitts Co. line) and 29 N (Pitts. Co. line to 699) – Tree pruning & small tree removal. Estimated completion Sept. 25. Lane, shoulder closures.

Route 460 Bus, Timberlake Road – Sign work may result in delays.

Route 501/24 intersection, Rustburg – Crew will install new 3-section signal head with flashing yellow arrow.

Route 622 – Reconstruction & bridge over Flat Creek. Delays possible. Est. comp. Sept. 2021.

Please note districtwide activities above. 

Charlotte County:    

Please note districtwide activities above. 

Cumberland County:   

Please note districtwide activities above. 

Halifax County:   

Route 58, Cluster Springs AHQ – Crew will boom axe. Delays possible.

Route 360 and other routes –Litter pick up may result in delays. Be alert to presence of crew.

Route 640 over Buffalo Creek – Weight limit on bridge lowered to 10 tons.

Route 501 – Passing lane project. Expect delays for tree cutting/removal. Lane closures; temporary detours expected. Fixed comp – May 5, 2023. Speed limit reduced.

Route 610 – Connections with US 501 closed beginning March 31.

Please note districtwide activities above. 

Lynchburg:

Route 29/460 (Campbell Ave – Concord Turnpike) – Bridge replacement over railroad underway. Northbound 29/eastbound 460 speed 45 mph. Completion July 31, 2023.

Nelson County:   

Please note districtwide activities above. 

Pittsylvania County:   

Route 29 N over Banister River – One lane, 15’ in width.

Route 29 N & S – Long line painting will take place. Slow machinery; use caution.

Route 58 and other routes –Litter pick up may result in delays. Be alert to presence of crew.

Route 607 (668 -628) –Closed for bridge construction. Detour: 607, 668, 602, 628 back to 607.

Route 640 (633-633) –3/22-4/9, 7:30 am- 3:30 pm ea. day, road closed for tree and debris removal. Detour: 633, 668, 633 back to 640.

Route 849 (855-851) – Closed for repairs April 5-May 14. Detour 849, 855, 851 to 849.

Route 976 – Pipe repairs will occur.

Please note districtwide activities above. 

Prince Edward County:   

Route 15/665 turn lanes and 15/692 roundabout – Construction. Fixed completion Nov. 11, 2022.

Please note districtwide activities above. 




Multimedia

 

AFP

AFP

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.

Latest News

police ICE agent
Trump's America

John Whitehead | The gloves are off: ICE, electric shock weapons and secret police

classical music
Local

Series to highlight ‘250 Years of Local Music’ in Charlottesville, Albemarle

The Albemarle Charlottesville Historical Society will be partnering with The Front Porch to host a seven-month program series entitled “250 Years of Local Music: Exploring Musical Traditions of Charlottesville & Albemarle."

soccer
Sports

Women’s Soccer: #13 UVA rolls to 7-0 win over La Salle to improve to 3-0-0

I’m not sure why you play teams that you’re going to beat 7-0, which was the final score for #13 Virginia in its game with La Salle on Thursday at Klöckner Stadium.

new japan pro wrestling
Sports

G1 Climax 36 finale review: Ryohei Oiwa vs. Yuya Uemura for the title shot

uva basketball
Basketball, Go 'Hoos

UVA Basketball: Comparing Roussell’s non-conference schedule to Coach Mox

uva football solomon beebe
Football, Go 'Hoos

UVA Football: Backup tailback Solomon Beebe arrested on animal-cruelty charges

Tom Perriello
Virginia Politics

Democrats target Tom Perriello, offer resources to flip Fifth District seat