Home VDOT Staunton District Traffic Alert: Feb. 2-6
Local

VDOT Staunton District Traffic Alert: Feb. 2-6

Contributors

road-work-headerThe following is a list of highway work that might affect traffic in the Staunton VDOT transportation district during the coming weeks. The Staunton district is comprised of 11 counties: Alleghany, Bath, Rockbridge, Augusta, Highland, Rockingham, Shenandoah, Frederick, Page, Warren and Clarke. Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. Also, when traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

(NEW) or (UPDATE) indicates a new entry or a revised entry since last week’s report.

 

ALLEGHANY COUNTY

INTERSTATE 64

Mile marker 0 to 41, eastbound and westbound – Be alert for debris removal, clearing sign areas, cleaning bridge ditches and slopes. Monday to Friday, 8 a.m. to 5 p.m.

 

PRIMARY ROADS

Route 60 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

Route 159 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

Route 311 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

(UPDATE) Various roads – Brush cutting and pothole repairs with flagger traffic control. Monday to Friday, 8:30 a.m. to 4 p.m.

 

SECONDARY ROADS

(UPDATE) Various roads – Brush-cutting and pothole repairs with flagger traffic control.  Monday to Friday, 8:30 a.m. to 4 p.m.

Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

 

 

BATH COUNTY

PRIMARY ROADS

Various roads – Pothole repairs and shoulder repairs with flagger traffic control. Monday to Friday, 8:30 a.m. to 4 p.m.

 

SECONDARY ROADS

Various roads – Pothole repairs, brush cutting and shoulder repairs with flagger traffic control. Monday toFriday, 8:30 a.m. to 4 p.m.

 

 

ROCKBRIDGE COUNTY

INTERSTATE 64

Mile marker 41 to 57, eastbound and westbound – Be alert for debris removal and crews cleaning paved ditches. Monday to Friday, 8 a.m. to 5 p.m.

(NEW) Mile marker 45.65, eastbound – Lane closures as needed for pipe inspection and cleaning. February 5 and 6, 7 a.m. to 5:30 p.m.

Mile marker 53.3 to 55.3, eastbound and westbound.  Eastbound traffic will detour across the median to the westbound side of the interstate. Both directions of traffic will use westbound Maury River bridge for about a year while the eastbound bridge undergoes rehabilitation. Speed limit is 55 miles per hour.

 

INTERSTATE 81

Mile marker 173 to 205, northbound and southbound – Be alert for debris removal, repairing mile marker signs and cleaning paved ditches. Monday to Friday, 8 a.m. to 5 p.m.

 

PRIMARY ROADS

Route 39 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

Route 42 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

Route 252 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

(UPDATE) Various roads – Ditching, brush cutting, pothole repairs, trash pickup, shoulder repairs and pipe replacement with flagger traffic control. Monday to Friday, 8:30 a.m. to 4 p.m.

 

SECONDARY ROADS

(UPDATE) Various roads – Ditching, brush cutting, pothole repairs, trash pickup, shoulder repairs and pipe replacement with flagger traffic control. Monday to Friday, 8:30 a.m. to 4 p.m.

Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

 

 

HIGHLAND COUNTY

PRIMARY ROADS

(NEW) Route 250 – Brush cutting and trimming from McDowell to Monterey. Monday to Friday, 8:30 a.m. to 4 p.m.

 

SECONDARY ROADS

(NEW) Various roads – Tree removal with flagger control. Monday to Friday, 8:30 a.m. to 4 p.m.

 

 

AUGUSTA COUNTY

INTERSTATE 64

Mile marker 94 to 107, eastbound and westbound – Median shoulder closures and possible right shoulder closures for installation of underground conduit system in median. Monday to Friday, 6:30 a.m. to 6 p.m.Estimated completion July 6, 2015.

 

INTERSTATE 81

Mile marker 205 to 237, northbound and southbound – Be alert for crews removing debris, repairing mile marker signs, replacing object markers, cleaning bridge slopes and paved ditches. Monday to Friday, 8 a.m. to 5 p.m.

Mile marker 207 – Right shoulder closures as needed for repairs on Route 620 bridge over I-81.  Mondaythrough Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

(NEW) Mile marker 215– Shoulder closures as needed for repairs on Route 694 bridge over I-81. Mondaythrough Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

(NEW) Mile marker 216.2 – Shoulder closures as needed for repairs on Route 655 bridge over I-81. Mondaythrough Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Mile marker 219.9 – Shoulder closures as needed for repairs on Route 647 (Christians Creek Road) bridge over I-81. Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Mile marker 221 – Shoulder closures as needed for repairs on Route 635 (Barterbrook Road) bridge over I-81. Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Mile marker 224.3 – Shoulder closures as needed for repairs on Route 254 (New Hope Road) bridge over I-81. Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Mile marker 228.4 – Shoulder closures as needed for Route 781 (Mill Race Road) bridge work over I-81.Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Mile marker 230.3 – Shoulder closure as needed for Route 742 (Toll Gate Road) bridge work over I-81.Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Mile marker 233.9 – Shoulder closure as needed for Route 750 (Keezletown Road) bridge work over I-81.Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

 

PRIMARY ROADS

Route 254 (New Hope Road) – Flagger controlled lane closure as needed for bridge work over I-81.  Mondaythrough Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 285 (Tinkling Spring Road) – Watch for shoulder closures and occasional flagging operations for road-widening project between Route 636 and Route 635.

(UPDATE) Route 340 – Right shoulder closures as needed at various locations for fiber optic installation from Route 11/Greenville to the Augusta/Rockingham County Line. Estimated completion February 28, 2015.

Route 340/635 Intersection– Lane shifts and shoulder closures for gas line installation on northbound shoulder between Route 649 and Route 635.  Estimated completion October 23, 2015.

 

SECONDARY ROADS

Route 608 (Tinkling Spring Road) – Alternating lane closures with flaggers for improvements at intersection with Route 648. Monday to Friday, 9 a.m. to 3 p.m. schedule will resume. Estimated completion May 31, 2015.

Route 620 (Spottswood Road) – Flagger controlled lane closures for repairs on Route 620 bridge over I-81.Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 635 (Barterbrook Road) – Flagger controlled lane closure as needed for bridge work over I-81. Mondaythrough Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 636 (Lifecore Drive) – Watch for shoulder closures and occasional flagging operations for road-widening project west of Route 285.

Route 647 (Christians Creek Road) – Flagger controlled lane closure as needed for bridge work over I-81. Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 648 (Christians Creek Road) – Alternating lane closures with flaggers for intersection improvements at Route 648/Route 608 intersection.  Monday to Friday, 9 a.m. to 3 p.m. schedule will resume. Estimated completion May 31, 2015.

(NEW) Route 655 (Walnut Hills Road) – Flagger controlled lane closures for bridge repairs over I-81.  Mondaythrough Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

(NEW) Route 694– Flagger controlled lane closure for bridge repairs over I-81. Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 742 (Toll Gate Road) – Flagger controlled lane closure as needed for bridge work over I-81. Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 750 (Keezletown Road) – Flagger controlled lane closure as needed for bridge work over I-81.  Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 781 (Mill Race Road) – Flagger controlled lane closures as needed for bridge work over I-81.  Monday through Thursday, 7 a.m. to 6:30 p.m. Estimated completion Feb. 27, 2015.

Route 801 (Hangers Mill Road) – Road closed to through traffic between Route 250 (Churchville Avenue) and Route 835 (Hotchkiss Road) for bridge replacement over Jennings Branch. Traffic will follow the posted detour. Local traffic will have access to their properties during construction. Estimated completion October 2015.

Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

Various roads – Lane and shoulder closures as needed for pipe installation, patching, brush cutting, shoulder repairs, ditching operations and grading.  Monday to Friday, 7 a.m. to 3:30 p.m.

 

 

ROCKINGHAM COUNTY 

INTERSTATE 81

Mile marker 237 to 264, northbound and southbound – Pothole repairs as needed. Debris removal and fence repair.  Monday to Friday, 7:30 to 4 p.m.

 

PRIMARY ROADS

Route 257 – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

 

SECONDARY ROADS

Various roads – Utility tree trimming. Flagger control during daylight hours. Monday to Friday.

Various roads – Lane and shoulder closures as needed for pipe installation, patching, brush cutting, shoulder repairs, ditching operations and grading. Mowing, litter pickup and pavement repairs as needed.

 

 

PAGE COUNTY

PRIMARY ROADS

(NEW) Route 340 (Town of Shenandoah) – Lane closures controlled by flaggers for sidewalk replacement work from Route 704 to Route 708 (Shenandoah Avenue).  Monday through Friday, 9 a.m. to 5 p.m.  February 2 to February 13.

 

SECONDARY ROADS

(NEW) Route 652 (Airport Road) – Shoulder closures for soil testing from Route 211 (Lee Highway) to Route 675 (Bixler’s Ferry Road) beginning February 2.  Monday through  Friday, 8 a.m. to 5 p.m.  Estimated completion February 27.

Various roads – Lane and shoulder closures as needed for pipe installation, patching, brush cutting, shoulder repairs, ditching operations and grading.  Monday to Friday, 7 a.m. to 3:30 p.m.

 

 

SHENANDOAH COUNTY

INTERSTATE 81

(UPDATE) Mile marker 264 to 300, northbound and southbound – Pothole repairs as needed. Debris removal, tree and brush removal, fence line maintenance and repairs, Monday to Friday, 7:30 a.m. to 4 p.m.

 

PRIMARY ROADS

Route 11 – Utility tree trimming. Flagger control during daylight hours.  Monday to Friday.

 

SECONDARY ROADS

Route 760 (Water Street) – Flagger controlled traffic from Route 1403 to 0.30 mile east for bridge replacement over Stony Creek. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion June 2015.

Various roads – Pipe cleaning, drainage work, brush cutting and pothole patching.

Various roads – Utility tree trimming. Flagger control during daylight hours.  Monday to Friday.

 

 

FREDERICK COUNTY

INTERSTATE 81

Mile marker 300 to 324, northbound and southbound – Pothole repairs as needed. Debris and brush removal, including bridge slopes at mile marker 299, Monday to Friday 7:30 a.m. to 4 p.m.

 

PRIMARY ROADS

Route 50, east – Shoulder closures for the construction of a new crossover between Route 781 (Prince Frederick Drive) and Route 655 (Sulphur Spring Road).  Daylight hours.  Estimated completion March 15, 2015.

 

SECONDARY ROADS

(NEW) Various roads – Utility tree trimming. Flagger control during daylight hours.  Monday to Friday.

Various roads – Shoulder repair, pothole patching and brush cutting.

 

 

CLARKE COUNTY

PRIMARY ROADS

No lane closures reported.

 

SECONDARY ROADS

Various roads – Brush cutting and pothole patching.

 

 

WARREN COUNTY

INTERSTATE 66

Mile marker 0 to 15, northbound and southbound – Pothole repairs as needed. Debris removal.  Brush removal on bridge slopes at mile marker 6. Ditch repairs at mile marker 13.7.  Monday to Friday, 7:30 a.m. to 4 p.m.

 

INTERSTATE 81
No lane closures reported.

 

PRIMARY ROADS

Route 340 (Stonewall Jackson Highway) – New traffic pattern with lane shifts on north and south ends of the bridge replacement project over Gooney Creek. Work zone from 0.67 miles south of Route 605 to 0.35 miles north of Route 605. Estimated completion Oct. 2015.

Route 340/522 (North Shenandoah Avenue / Winchester Road), from Duck Street to 17th Street – Old South Fork bridge replacement and interchange modification at Route 55 (Strasburg Road) and 340/522.  Additional lane shift and closure of center turn lane from the south end of the bridge to just past 17th Street and closure of 18th Street to through traffic. Through traffic will detour onto North Royal Avenue and 17th Street. Lane shifts on Route 55 just west of Route 340/522. These changes will be in effect through summer 2015.  Estimated bridge completion December 2017.

 

SECONDARY ROADS

Various roads – Pipe cleaning, brush cutting and pothole patching.

 

Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.

Traffic alerts and traveler information can be obtained by dialing 511 and at 511Virginia.org. For other assistance call the VDOT Customer Service Center 24 hours a day, seven days a week. Dial 1-800-FOR-ROAD(1-800-367-7623) from anywhere in the state to report road hazards, ask transportation questions, or get information related to Virginia’s roads.

The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr,Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at www.VirginiaDOT.org.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.