Orchard Drive pipe replacement rescheduled

transportation road work

Photo Credit: carterdayne

Due to rain and storms in the forecast, the pipe replacement project on Route 1206 (Orchard Drive) in Crozet has been rescheduled.

The work, originally scheduled for Aug. 14 and 15, is now scheduled from 8 a.m. Friday, Aug. 16 until 5 p.m. Saturday, Aug. 17.

The road will be closed to through traffic near Route 691 (Jarmans Gap Road).

Drivers will use Route 691 to Route 684 (Lanetown Road) which carries traffic back to Route 1206.

Updates and other real-time travel information can be found on the 511 Virginia website, the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. Local updates are also posted to Twitter.com/VaDOTCulp.



uva basketball team of destiny

Team of Destiny: Inside UVA Basketball's improbable run

Team of Destiny: Inside Virginia Basketball’s Run to the 2019 National Championship, by Jerry Ratcliffe and Chris Graham, is available for $25.

The book, with additional reporting by Zach Pereles, Scott Ratcliffe and Scott German, will take you from the aftermath of the stunning first-round loss to UMBC in 2018, and how coach Tony Bennett and his team used that loss as the source of strength, through to the ACC regular-season championship, the run to the Final Four, and the thrilling overtime win over Texas Tech to win the 2019 national title, the first in school history.



 
augusta free press
 

Comments

%d bloggers like this: