Home Staunton District Traffic Alerts: Oct. 3-7
Local

Staunton District Traffic Alerts: Oct. 3-7

Contributors

road work transportationThe following is a list of highway work that may affect traffic in the Staunton District during the coming weeks. The Staunton District is comprised of 11 counties: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren. Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

 

(NEW) or (UPDATE) indicates a new entry or a revised entry since last week’s report.

 

 

ALLEGHANY COUNTY 

INTERSTATE 64

Mile marker 0 to 41, eastbound and westbound – Watch for crews removing debris, trimming trees, cleaning bridge slopes and around culverts. Monday to Friday, 8 a.m. to 5 p.m.

(NEW) Mile marker 6 to 0, westbound – Right lane and shoulder closures for pavement repairs along shoulder. Monday toWednesday, 8 a.m. to 5 p.m.

(NEW) Mile marker 18 to 17, westboundMobile right shoulder closures for storm drainage work. Tuesday, 8 a.m. to 5 p.m.

(UPDATE) Mile marker 36 to 31, westbound – Alternating lane closures for paving operations through October 15, 6 a.m. to 8 p.m.


PRIMARY ROADS

(NEW) Route 18 – Single lane closures 24/7 for bridge repairs over Potts Creek between Route 608 (Wolfe Road) and Route 609 (Vine Patch Road). Temporary traffic signals will control traffic. Estimated completion November 4.

Various roads – Pavement patching with flagger traffic control.  Monday to Friday, 7:30 a.m. to 3 p.m.

 

SECONDARY ROADS

(UPDATE) Frontage Road 199 (Frontier Lane)Watch for crews preparing paved channel along frontage road and westbound I-64 west of exit 7. Flagger traffic control. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion summer 2017.

(UPDATE) Route 687 (Jackson River Road) – Flagger controlled traffic for paving, pavement marking and guardrail work from Route 641 to the Bath County line. Monday through Saturday, 6 a.m. to 9 p.m. Estimated completion October 15.

(UPDATE) Various roads – Pavement patching, grading and pipe installation with flagger traffic control.  Monday to Friday,7:30 a.m. to 3 p.m.

 

 

BATH COUNTY                                                                                                                                    

PRIMARY ROADS

(NEW) Route 220 (Sam Snead Highway, Town of Hot Springs) – Left and right shoulder closures and flagger controlled traffic for curb and gutter repairs from Park Lane to 1.5 miles north of Park Lane. Monday to Friday, 7 a.m. to 5 p.m. Estimated completion October 14.

(UPDATE) Various roads – Pavement patching and pipe replacement with flagger traffic control. Monday to Friday, 7:30 a.m. to 3 p.m.

 

SECONDARY ROADS

Route 627 (Scottstown Draft Road) – 24/7 “stop and proceed” traffic control for bridge replacement over tributary of Stuart Run. Work zone is 4.8 miles east of Route 678 and 0.3 mile west of Route 629 (Deerfield Road). Estimated completion October 19.

(UPDATE) Various roads – Pavement patching, pipe replacement and grading with flagger controlled traffic. Monday to Friday,7:30 to 3 p.m.   

 

 

ROCKBRIDGE COUNTY                                                                                                                   

INTERSTATE 64

Mile marker 41 to 57, eastbound and westbound – Be alert for crews removing debris and cleaning paved ditches and drop inlets between mile markers 45 and 41, Monday to Friday, 8 a.m. to 5 p.m.

Mile marker 53 to 55, eastbound and westbound – Single-lane traffic through work zone. Westbound drivers use a median crossover to access the eastbound side of the interstate. After crossing the bridge, westbound drivers follow a second crossover to return to the I-64 westbound mainline. Eastbound traffic limited to the right lane. Work zone speed limit 55 miles an hour.  Estimated project completion summer 2017.

 

INTERSTATE 81

Mile marker 174 to 205, northbound and southbound – Watch for crews removing debris, cleaning paved ditches, around box culverts, drain pipes and ditches, trimming trees and mowing storm water ponds. Monday to Friday, 8 a.m. to 5 p.m.

(NEW) Mile marker 184, southbound – Nighttime single lane closures for Buffalo Creek bridge work. Monday to Friday, 8 p.m. to 7 a.m. Estimated completion October 14.

(NEW) Mile marker 201 to 202, northbound – Left lane and shoulder closures for sinkhole and slope repairs. Tuesday andWednesday, 8 a.m. to 8 p.m.

(UPDATE) Mile marker 205 to 195, southbound – Right shoulder closures for fiber optic installation, Monday to Friday. Estimated completion October 30.

 

PRIMARY ROADS

(UPDATE) Various roads – Pavement patching, pipe replacement, tree and brush removal. Flagger traffic control. Mowing with a mobile operation. Monday to Friday, 7:30 to 3 p.m.   

 

SECONDARY ROADS

Route 708 (Gilmore Mill Road) – Road closed for bridge replacement at Cedar Creek just east of Route 608 (Shafer Lane). Detour using Route 608 and Route 130 (Wert Faulkner Highway).  Estimated completion late 2016.

(UPDATE) Various roads – Paving and patching, ditching, pipe replacement, tree removal, grading, shoulder repairs and brush cutting. Flagger traffic control. Monday to Friday, 7:30 to 3 p.m.   

 

 

HIGHLAND COUNTY

PRIMARY ROADS

Route 250 (Mountain Turnpike, Monterey) – Shoulder closures Monday to Friday, 7 a.m. to 5 p.m. for sidewalk work at intersections with Wilson Avenue, Potomac River Road, Water Street, Spruce Street, Walnut Street and Mill Alley. Sidewalks in these areas will be closed to pedestrians and an accessible path will be maintained by the contractor. Estimated completionOctober 21.

(UPDATE) Various roads – Tree removal and shoulder repairs with flagger traffic control. Mowing and weed-eating with a mobile operation. Monday to Friday, 7:30 a.m. to 3 p.m.

 

SECONDARY ROADS

Route 600 (Back Creek Road Upper and Lower) and Route 607 (Big Valley Road) – Flagger traffic control for ditching at various locations. Monday to Friday, 7:30 a.m. to 3 p.m.

Route 609 (Burnsville Road) Flagger traffic control for pipe installation. Monday to Friday, 7:30 a.m. to 3 p.m.

(UPDATE) Route 614 (Cowpasture River Road) Flagger traffic control for pipe installation north of Route 250. Monday to Friday, 7:30 a.m. to 3 p.m.

(NEW) Route 617 (Seldom Seen Road) – Rural Rustic road project west of Route 654 (Doe Hill Road). Flagger traffic control.Monday to Friday, 7:30 a.m. to 3 p.m.

Route 678 (Bullpasture River Road) Flagger traffic control for pipe installation. Monday to Friday, 7:30 a.m. to 3 p.m.

(UPDATE) Various roads – Tree removal, pipe cleaning and shoulder repairs with flagger traffic control.  Monday to Friday,7:30 a.m. to 3 p.m.

 

 

AUGUSTA COUNTY  

INTERSTATE 64

Mile marker 87 to 100, eastbound and westbound – Be alert for crews removing debris, trimming trees, cleaning bridge slopes, paved ditches and inlets. Monday to Friday, 8 a.m. to 5 p.m.

(UPDATE) Mile markers 94 to 107– eastbound and westbound – Left and right shoulder closures for installation of traffic-management system, Monday to Friday, 7 a.m. to 7 p.m.  Estimated completion October 21.

 

INTERSTATE 81

Mile marker 205 to 237, northbound and southbound – Be alert for crews removing debris, trimming trees, cleaning paved ditches, culverts, pipes and other drainage structures at various locations. Monday to Friday, 8 a.m. to 5 p.m.

Mile marker 207 to 209, northbound – Left or right lane closures Sunday through Friday nights, 8 p.m. to 7 a.m., for paving, drainage work, guardrail and rumble strip installation. Estimated completion early December.

(UPDATE) Mile marker 229 to 205, southbound – Right shoulder closures for fiber optic installation, Monday to Friday. Estimated completion October 30.

 

PRIMARY ROADS

(UPDATE) Route 11 (Lee Highway) – Shoulder closure for fiber installation from Route 781 (Bald Rock Road) to Verona Elementary School. Estimated completion October 14.

(UPDATE) Route 42 (Scenic Highway) – Right shoulder closures for utility work from Route 613 (Spring Hill Road) to Route 728 (Stover Shop Road). Monday to Friday. Estimated completion October 14.

(UPDATE) Route 42 (Little Calfpasture Highway) – Right shoulder closures and intermittent lane closures for utility work from Route 254 (Buffalo Gap) to Town of Craigsville. Monday to Friday.  Estimated completion October 14.

(UPDATE) Route 250 (Three Notched Mountain Highway) – Right shoulder closures for installation of traffic-management system. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion October 21.

(UPDATE) Route 250 (Churchville Avenue)Shoulder closure for fiber installation from Route 722 (Vinegar Hill Road) to Route 42 (Scenic Highway). Estimated completion October 30.

Route 250 (Churchville Avenue) – Bridge replacement over Whiskey Creek, just east of intersection with Route 722 (Vinegar Hill Road). Occasional lane/shoulder closures as contractors relocate utilities and build a temporary bridge and approaches. Work zone speed limit is 25 miles an hour.  Traffic will detour onto the two-lane temporary bridge in fall 2016.

(UPDATE) Route 340 – Right shoulder closures for installation of traffic-management system.  Monday to Friday, 7 a.m. to 7 p.m. Estimated completion October 21.

Route 340 (Main Street, Waynesboro) – Road closed  between Constitution Park and East Avenue for replacement of South River bridge. Through traffic will use Broad Street (Route 250) as detour route. Local traffic has access to all businesses and residences throughout the project. Estimated completion late 2017.

 

SECONDARY ROADS

(UPDATE) Route 601 (Estaline Valley Road) – Pavement patching from Route 682 (Troxel Gap Road) to Rockbridge County line. Alternating lane closures 7 a.m. to 3 p.m.

Route 612 at Route 792 (Laurel Hill Road/Indian Mound Road, Verona) – Lane closures with flagger traffic control are possible Monday to Friday from 7 a.m. to 7 p.m. During other times, motorists should be alert for shoulder closures and construction vehicles moving in and out of the work zone.  Estimated completion spring 2017.

(UPDATE) Route 624 (South Delphine Avenue) – Right shoulder closures for installation of traffic-management system. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion October 21.

Route 641 (Fishersville Road) – Intermittent lane and shoulder closures from Route 608 (Long Meadow Road) to Route 1360 (Westminster Drive) for water line upgrades. Monday to Friday. Estimated completion fall 2016.

Route 685 (Lehigh Road, Craigsville) – Road closed for bridge replacement over Little Calfpasture River between Route 684 and Route 42. Detour in place. Estimated completion late 2016.

Route 701 (Howardsville Road) – Shoulder closure for fiber installation from Route 11 (Lee-Jackson Highway) to Route 697 (Old Greenville Road). Estimated completion October 30.

(UPDATE) Route 703 (Hewitt Road) – Pavement patching from Route 876 (Swoope Road) to Route 42. Alternating lane closures 7 a.m. to 3 p.m.

Various roads – Mobile lane closures for mowing operations in the Arbor Hill area. Estimated completion October 7.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday to Friday.

 

 

ROCKINGHAM COUNTY 

INTERSTATE 81

Mile marker 237 to 264, northbound and southbound – Watch for crews removing debris and cleaning ditches and drop inlets. Monday to Friday, 7:30 a.m. to 4 p.m. Pothole repairs as needed.

(UPDATE) Mile marker 242, northbound and southbound – Overnight lane closures for bridge work, seven nights a week, 8 p.m. to 7 a.m. Estimated completion October 14.

(UPDATE) Mile marker 245, northbound and southbound – Overnight lane closures for bridge work, seven nights a week, 8 p.m. to 7 a.m.  Estimated completion October 14.

 

PRIMARY ROADS

Route 11 (Lee Highway) – Replacement of North River bridge. Watch for traffic shifts, shoulder closures and flagger controlled lane closures, 7 a.m. to 5:30 p.m. Work zone from Route 694 to one mile south of Mount Crawford. Variable message boards and pavement markings direct motorists. Estimated completion July 2017.

(NEW) Route 33 – Flagger controlled traffic for bridge repairs over Muddy Creek (Hinton).  Monday through Friday, 7 a.m. to 5 p.m. Estimated completion October 14.

(UPDATE) Route 33 Business (Old Spotswood Trail, Elkton) – Flagger controlled lane closure 7 a.m. to 7 p.m. for paving and shoulder work. Work zone from 0.66 miles east of Route 33 to Route 340 (near Blue and Gold Drive). Sunday through Thursday. Estimated completion October 7.

(NEW) Route 42 (Main Street, Broadway) – Flagger traffic control for curb and gutter work between Mason Street and 5thStreet. Monday to Friday, 7 a.m. to 5 p.m. Estimated completion October 14.

(UPDATE) Route 253 (Port Republic Road) – Paving operations in area of Route 340 (East Side Highway). Traffic limited to one lane.  Monday to Friday, 8 a.m. to 5 p.m. Estimated project completion October 21.

(UPDATE) Route 340 (Stuart Avenue, Elkton) – Flagger controlled lane closure 7 a.m. to 7 p.m. for paving and shoulder work. Work zone from Spotswood Avenue to Summit Avenue. Sunday through Thursday. Estimated completion October 7.

(UPDATE) Route 340 (East Side Highway) – Paving operations at the intersection of Route 253/659 (Port Republic Road). Traffic limited to one lane.  Monday to Friday, 8 a.m. to 4:30 p.m. Estimated project completion October 21.

 

SECONDARY ROADS

Route 602 (East Point Road) – Single lane closure as needed for utility maintenance between Route 33 and Route 646.

(UPDATE) Route 641 (Cave Hill Road) Replacement of Stony Run bridge near McGaheysville between Route 991 (Jacob Burner Road) and Route 843 (Cemetery Road). Temporary bridge serves as 24/7 detour with a stop-and-proceed work zone in place. Estimated completion is October 28 .

(UPDATE) Route 659 (Port Republic Road) – Paving operations at the intersection of Route 340 (East Side Highway). Traffic limited to one lane. Monday to Friday, 8 a.m. to 5 p.m. Estimated project completion October 21.

Route 778 (Brenneman Church Road) – Closed Monday to Friday from Route 42 to Route 910 for drainage repairs. A 24/7 detour will be in place using Route 721. Estimated completion October 7.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday to Friday.

 

 

PAGE COUNTY

PRIMARY ROADS

(NEW) Route 340 (north of Grove Hill) – Flagger controlled, alternating lane closures for bridge repairs over South Fork Shenandoah River. Monday to Friday 7 a.m. to 8 p.m. Estimated completion December 2016.

(UPDATE) Route 340 – Intermittent flagging operations for replacement of bridge and approaches at Cub Run. Monday to Friday, 7 a.m. to 4:30 p.m. Work zone speed limit is 45 miles per hour. Estimated completion September 2017.

Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.

 

SECONDARY ROADS

Various roads – Pavement patching and mowing at various locations. Monday to Friday, 7:30 to 3 p.m.  Estimated completion October 31.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday to Friday.

 

 

SHENANDOAH COUNTY

INTERSTATE 81

(NEW) Exits 279, 283, 291, northbound and southboundDaytime right shoulder closures for shoulder repairs. Tuesday through Thursday, 7:30 a.m. to 3:30 p.m.

Mile marker 279, northbound and southbound – Nighttime, alternating lane closures for maintenance on bridges over Route 185 and Stoney Creek in Edinburg area.  Monday to Friday, 8 a.m. to 7 a.m. Estimated completion October 16.

(NEW) Mile marker 284 to 269, northbound and southboundNighttime shoulder closures as needed for crews removing debris. Monday and Tuesday, 8 p.m. to midnight.

(NEW) Mile marker 286.3 to 286.7, northbound Nighttime left lane closures for shoulder repairs. Wednesday and Thursday, 8 p.m. to 7 a.m.

(UPDATE) Mile marker 287 to 283, southbound – Nightly alternating lane closures for guardrail replacement.  Monday to Friday, 7 p.m. to 7 a.m. Estimated completion October 28.

(UPDATE) Mile marker 292 to 296, northbound – Nightly alternating lane closures for guardrail replacement.  Monday to Friday, 7 p.m. to 7 a.m. Estimated completion October 21.

Mile marker 297, northbound and southbound –Alternating shoulder closures for bridge work over Norfolk Southern Railway. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion October 28.

(UPDATE) Mile marker 298 to 292, southbound – Nightly alternating lane closures for guardrail replacement. Monday to Friday, 7 p.m. to 7 a.m. Estimated completion October 28.

 

PRIMARY ROADS

(NEW) Route 11 (North Massanutten Street, Strasburg) – Nighttime, alternating lane closures for Strasburg utility project.  Sunday to Thursday, 8 p.m. to 6 a.m.

(NEW) Route 11 (East King Street, Strasburg) – Alternating lane closures for paving as part of Strasburg utility project. Thursday, 9 a.m. to 2:30 p.m.

Route 185 (Stoney Creek Road) – Flagger controlled lane and shoulder closures as needed for maintenance on I-81 overpasses. Monday to Friday, 7 a.m. to 7 p.m. Estimated completion October 16.

Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.

 

SECONDARY ROADS

Queen Street (Route 1201, Strasburg) – Road closed between South Massanutten Street and Holiday Street for bridge replacement over Town Run. Detour in place. Estimated completion November 2016

Route 663 (Artz Road) Bridge replacement over the North Fork of the Shenandoah River. The road will remain open during construction of the new bridge, with flagger controlled traffic 7 a.m. to 7 p.m. Monday to Friday.  Estimated completion May 2018.

Route 678 (Fort Valley Road) – Flagger controlled lane closure 7 a.m. to 7 p.m. for paving operations and pavement markingsfrom Route 758 (Seven Fountains Road) to Warren County line. Monday to Friday; possible Saturdays.  Estimated completion October 7.

Various roads – Patching, brush cutting and mowing. Monday to Friday.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday through Friday.

 

 

FREDERICK COUNTY

INTERSTATE 66

No lane closures reported.

 

INTERSTATE 81

(NEW) Mile marker 302 to 324, northbound and southbound – Nighttime shoulder closures as needed for crews removing debris.  Tuesday and Wednesday, 8 p.m. to midnight.

(UPDATE) Mile markers 309 to 311, northbound Paving operations require overnight right lane closure Monday and Tuesday from 8 p.m. to 6 a.m. Overnight left lane closure Wednesday and Thursday, 8 p.m. to 6 a.m. Exit 310 northbound off-ramp will close at 11 p.m. Tuesday and reopen by 4 a.m. Wednesday. Northbound I-81 drivers needing to access Route 37 can take exit 307 (Stephens City) and follow Route 11 north to Route 37, or take exit 317 (Winchester/Stephenson) and follow Route 11 south to Route 37. Right and left shoulders closed 24/7. Speed limit 60 mph through work zone. Motorists should be alert for trucks entering and exiting work zone. Estimated project completion fall 2017.

 

PRIMARY ROADS

(NEW) Route 11, north – Flagger controlled single lane, nightly from Monday to Thursday, 8 p.m. to 5 a.m. for installation of storm water culvert across Route 11 between Route 838 (McCanns Road) and Route 761 (Old Charlestown Road). Estimated completion October 6.

(UPDATE) Route 37 (Northwestern Pike, Winchester) – Overnight right shoulder closures for traffic management equipment repairs, 0.74 miles south of Route 50. Monday to Friday from 9 p.m. to 5 a.m. Estimated completion October 7.

Route 37 at I-81 Exit 310 (Kernstown Interchange Project), northbound and southbound Speed limit on Route 37 reduced to 35 mph through work zone. Newly built portion of Route 37 is open. Drivers should be alert for traffic pattern change at intersection with Route 642 (Tasker Road). Estimated project completion fall 2017.

(NEW) Route 277 (Fairfax Pike) – Alternating single lane traffic controlled by flaggers and law enforcement. Monday to Thursday, 9 a.m. to 3 p.m., for installation of turn lane.  Estimated completion October 6.

(UPDATE) Route 522 (North Frederick Pike) – Overnight right shoulder closures 0.19 miles north of Route 682 (Chapel Hill Road) for replacement of traffic management equipment. Monday to Friday from 9 p.m. to 5 a.m. Estimated completion October 7.

Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.

 

SECONDARY ROADS

Route 642 (Tasker Road, Kernstown Interchange Project) – The speed limit on Route 642 is 45 miles per hour through the work zone. The newly built portion of Route 642 is now open.  Motorists should be alert for traffic pattern changes at intersections with Route 37 and Route 847 (Hillandale).  Estimated project completion fall 2017.

Route 847 (Hillandale Lane, Kernstown Interchange Project) – Newly built portion of Route 847 is open. Motorists should be alert for traffic pattern changes at intersection with Route 642 (Tasker Road). Estimated project completion fall 2017.

(UPDATE) Merriman Estates – Flagger controlled traffic for paving operations in Merriman Estates (Routes 1303, 1304, 1305, 1306, 1307). Monday to Friday, 7 a.m. to 7 p.m. Estimated completion date October 14.

Various roads – Patching, brush cutting and mowing. Monday to Friday.

Various roads – Utility tree trimming. Flagger control during daylight hours. Monday through Friday.

 

 

CLARKE COUNTY

PRIMARY ROADS

Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.

 

SECONDARY ROADS

Various roads – Mowing and brush cutting. Monday to Friday.

 

 

WARREN COUNTY

INTERSTATE 66

(NEW) Mile marker 0 at I-81 Interchange, eastbound – Right lane closure for shoulder repairs, Tuesday from midnight to 7 a.m.

Mile marker 0  to 15, westbound and eastbound – Watch for crews removing debris. Monday through Friday, 7:30 a.m. to 4 p.m.  Pothole repairs as needed.

(UPDATE) Mile Marker 9 to 10, westbound – Overnight right shoulder closures near Route 606 (Shenandoah Shores Road) overpass for replacement of traffic management equipment. Monday to Friday, 9 p.m. to 5 a.m.

 

INTERSTATE 81

(NEW) Mile marker 299 to 300, southbound – Right lane closure for shoulder repairs. Wednesday, Midnight to 7 a.m.

 

PRIMARY ROADS

Route 55 (Strasburg Road) – Intersection modification at Route 340/522 (Shenandoah Avenue/Winchester Road).  Lane closures as needed Monday to Friday, 9 a.m. to 3 p.m. daily and 9 p.m. to 7 a.m. nightly. Temporary traffic signal at 55/340/522 intersection. Temporary traffic switch for east and west lanes from 340/522 to .03 miles (A. S. Rhodes Elementary School) west of 340/522. Pavement markings, signs and traffic barrels will guide drivers through this area. Changes in effect through summer 2017 for construction of new travel lanes. Estimated project completion December 2017.

Route 340/522 (Shenandoah Avenue/Winchester Road) – South Fork bridge replacement and intersection modification at Route 55 (Strasburg Road).  Lane closures as needed Monday to Friday, 9 a.m. to 3 p.m. daily and 9 p.m. to 7 a.m. nightly.  Lane shift at 17th street and temporary traffic signal at 340/522/55 intersection, placing all traffic on the newly constructed bridge. 18th street is open to traffic, with left turn restrictions until summer 2017.  Demolition of old South Fork bridge and construction of new bridge continues. Estimated project completion December 2017.

Various roads/locations – Shoulder closures as needed for nighttime inspection of signs on Tuesdays and Thursdays. Estimated completion October 11.

 

SECONDARY ROADS

Route 624 (Morgan Ford Road) – Road closed for bridge replacement over the Shenandoah River. Work zone from Route 643 (Howellsville Road) to Route 661 (Fairground Road).  Detours:  Drivers south of the bridge will turn right on Route 643 (Howellsville Road), which changes to Route 603 and then to Route 638 in Clarke County. Drivers will then turn left on Route 17/50 (John Mosby Highway) and left on Route 624 (Red Gate Road/Milldale Road) to reach the end of the detour. Drivers north of the bridge will follow Route 624 (Milldale Road/Red Gate Road) north and turn right on Route 17/50 (John Mosby Highway) in Clarke County. Drivers will then turn right on Route 638 (Howellsville Road), which changes to Route 603 and then Route 643, to reach the end of the detour.  Estimated project completion June 2018.

Route 647 (Dismal Hollow Road) – Expansion of Linden Park & Ride lot. Watch for increased truck traffic and intermittent flagging operations for excavation work, stone placement and paving operations. Monday-Friday, 7 a.m. to 7 p.m. Estimated completion October 2016.

Various roads – Mowing, brush cutting and patching. Monday to Friday.

Various roads – Utility tree trimming. Flagger control during daylight hours. Monday through Friday.

 

Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.

Traffic alerts and traveler information can be obtained by dialing 511 and at 511Virginia.org. For other assistance call the VDOT Customer Service Center 24 hours a day, seven days a week. Dial 1-800-FOR-ROAD (1-800-367-7623) from anywhere in the state to report road hazards, ask transportation questions, or get information related to Virginia’s roads.

The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr, Twitter and YouTube.RSS feeds are also available for statewide information. The VDOT Web page is located at www.VirginiaDOT.org.

Contributors

Contributors