Home Staunton District Traffic Alert: April 25-29
Local

Staunton District Traffic Alert: April 25-29

Contributors

road-work-headerThe following is a list of highway work that may affect traffic in the Staunton District during the coming weeks.

The Staunton District is comprised of 11 counties: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations.

When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

(NEW) or (UPDATE) indicates a new entry or a revised entry since last week’s report.

 

 

ALLEGHANY COUNTY 

INTERSTATE 64

(UPDATE) Mile marker 0 to 41, eastbound and westboundWatch for crews removing debris at various locations. Cleaning box culverts, drain pipes and ditches between mile markers 16 to 26. Monday to Friday, 8 a.m. to 5 p.m.

(NEW) Mile marker 4 to 2 including Exit 1 off-ramp, eastbound – Alternating lane closures for paving operations. April 27 to May 14, 6 a.m. to 8 p.m.

(NEW) Mile marker 10 to 7 including Exit 7 off-ramp, westbound – Alternating lane closures for paving operations. April 25 to April 30, 6 a.m. to 8 p.m.

 

PRIMARY ROADS

Route 60 (Main Street, Clifton Forge) – Repairs to bridge adjacent to the Masonic Theatre through April 29, 7 a.m. to 5 p.m. Existing traffic pattern will be maintained. No on-street parking during repairs.

Route 159 (Dunlap Creek Road) –Traffic lanes restricted to 8 feet 6 inches beginning April 17 on temporary bridge during roadway alignment project for box culvert replacement over Crow Run.  Project will also use temporary traffic signals. Work zone is 0.45 mile west of Route 717 to 0.55 mile west of Route 17.  Commercial vehicles can use Route 18 as an alternate route. Estimated September 2016.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 29 at various hours and locations.

 

SECONDARY ROADS

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 29 at various hours and locations.

Various roads – Brush cutting, pothole repairs and ditching.  Monday – Friday, 7:30 to 3 p.m.   

 

 

BATH COUNTY                                                                                                                                    

PRIMARY ROADS

No lane closures reported.

 

SECONDARY ROADS

(NEW) Route 632 (Crizer’s Gap Road) – Closed from 8 a.m. on May 2 to 4 p.m. on May 19 for a bridge replacement.  The bridge is located 0.2 mile from the dead end and 0.35 miles from Route 42 (Cowpasture River Road).

Various roads – Patching and ditching.  Monday – Friday, 7:30 to 3 p.m.   

 

 

ROCKBRIDGE COUNTY                                                                                                                   

INTERSTATE 64

(UPDATE) Mile marker 41 to 57, eastbound and westbound – Be alert for crews removing debris and cleaning paved ditches and drop inlet eastbound at mile marker 55.  Monday to Friday, 8 a.m. to 5 p.m.

Mile marker 53 to 55, eastbound and westbound – Single lane of traffic through Maury River bridges work zone.  Be alert for westbound travel lane shifts.  Speed limit is 55 miles per hour. Estimated project completion December 2016.

Exit 56, eastboundDaily left lane closure to I-81 (mile marker 195) northbound for bridge work. Mondaythrough Friday, 6:30 a.m. to 8 p.m.  Estimated completion May 2016.

 

INTERSTATE 81

Mile marker 173 to 205, northbound and southbound – Be alert for crews removing debris and cleaning paved ditches at various locations, Monday to Friday. Mile marker 177 to 179, cleaning box culverts and drain pipes on Tuesday, Wednesday and Thursday.

 

PRIMARY ROADS

(NEW) West 29th Street/Route 60 (Buena Vista) Flagger traffic control April 26-28, 8 a.m. to 4:30 a.m. each day at the intersection of West 29th Street (Route 60/Midland Trail) and Rockbridge Avenue/Beech Avenue in the area of the Hardee’s restaurant. Traffic restricted to single lanes in both directions for pavement replacement and line painting.

(UPDATE) City of Buena Vista at various locations – Shoulder closures April 25 through April 29, 8 a.m. to 5 p.m. for paving and painting operations at these locations:  West 29th Street (Route 60) from Alleghany Avenue east to Beech Avenue.  10th Street from Linden Avenue west to Glen Maury Park entrance.  Magnolia Avenue (Route 501) from 25th Street south to 17th Street.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 25-29 at various hours and locations.

(NEW) Various roads – Watch for daytime line painting various days, locations and times.

(NEW) Various roads – Watch for daytime sign installation and maintenance various days, locations and times.

Various roads – Ditching, brush cutting, pavement work, pipe replacement, shoulder maintenance and pothole repairs. Monday – Friday, 7:30 to 3 p.m.   

 

SECONDARY ROADS

(NEW) Route 705 (Mountain View Road) – Road closed May 3-18 for bridge replacement over Marl Creek Stream. Work zone is 0.98 miles to Route 706 (Borden Grant Road) and 0.62 miles to Route 703 (Forest Grove Road). Traffic will be detoured to Route 703 and to Route 706.

Route 708 (Gilmore’s Mill Road) – Road closed for bridge replacement at Cedar Creek just east of Route 608 (Shafer Lane).  Detour using Route 608 and Route 130 (Wert Faulkner Highway).  Estimated completion Fall 2016.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 25-29 at various hours and locations.

(NEW) Various roads – Watch for daytime sign installation and maintenance various days, locations and times.

Various roads – Ditching, brush cutting, pavement work, pipe replacement, shoulder maintenance, grading and pothole repairs.  Monday – Friday, 7:30 to 3 p.m.   

 

 

HIGHLAND COUNTY

PRIMARY ROADS

Route 220 – Flagger controlled traffic for paving operations Monday – Friday, 7:30 to 3 p.m.   

 

SECONDARY ROADS

Various roads – Debris cleanup, ditching and patching operations with flagger controlled traffic.  Monday – Friday, 7:30 to 3 p.m.   

 

 

AUGUSTA COUNTY        

INTERSTATE 64

Mile marker 87 to 100, eastbound and westbound – Be alert for crews removing debris, cleaning bridge slopes, paved ditches and inlets . Monday to Friday, 8 a.m. to 5 p.m.

(UPDATE) Mile marker 94 to 107, eastbound and westbound – Shoulder closures Monday through Sunday, 6 a.m. to 7 p.m., for installation of traffic-management system.  Estimated completion June 4.

 

INTERSTATE 81

Mile marker 205 to 237, northbound and southbound – Be alert for crews removing debris, cleaning paved ditches, drop inlets, box culverts and drain pipes at various locations.   Monday to Friday, 8 a.m. to 5 p.m.

 

PRIMARY ROADS

(NEW) Route 11 (Lee Jackson Highway), northbound – Single lane closure April 26, 9 a.m. to 3 p.m. from Rockbridge county line to Route 620 (Spottswood Road) for utility work.

(UPDATE) Route 250 (Churchville Avenue) – Flagger controlled lane closures from 9 a.m. to 3 p.m. daily for soil testing at bridge over Bell Creek, including the Route732 ( Franks Mill Road) intersection and the Jakes’ Convenience Store area. Estimated completion May 4.

(UPDATE) Route 250 – Nighttime overhead signal work April 27 at intersections with Route 358, Routes 792 and I-81 southbound off-ramp.  Lane closures as needed.

Route 250 (Jefferson Highway) – Eastbound lane closure/lane shifts from Staunton city limits to Route 1427 (Rowe Road) for utility work.  Estimated completion May 31.

(UPDATE) Route 250 (Three Notched Mountain Highway) – Shoulder closures Monday through Sunday, 6 a.m. to 7 p.m., for installation of traffic-management system.  Estimated completion June 4.

(UPDATE) Route 340 (Rosser Avenue, Waynesboro) – Shoulder closures Monday through Sunday, 6 a.m. to 7 p.m., for installation of traffic-management system.  Estimated completion June 4.

Route 340 (Main Street, Waynesboro) – Road closed between Constitution Park and East Avenue for replacement of South River bridge. Through traffic will use Broad Street (Route 250) as detour route. Local traffic has access to all businesses and residences throughout the project. Estimated completion December 2017.

(NEW) Various roads – Watch for daytime line painting various days, locations and times.

 

SECONDARY ROADS

(UPDATE) Route 624 (South Delphine Avenue) – Shoulder closures Monday through Sunday, 6 a.m. to 7 p.m., for installation of traffic-management system.  Estimated completion June 4.

(UPDATE) Route 732 (Franks Mill Road) – Flagger controlled lane closures from 9 a.m. to 3 p.m. daily for soil test borings at bridge over Bell Creek, including work at the Jakes’ Convenience Store area and the Route 250 intersection. Estimated completion May 4.

Route 733 (Moffett Branch Road) – Closed for bridge replacement over Elk Run. Work zone is between Route 835 (Dudley Farm Road) and Route 734 (Hupman Road). Through traffic will follow posted detour route.  Property owners will have access to homes and businesses.  Estimated completion May 2016.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday to Friday.

 

 

ROCKINGHAM COUNTY 

INTERSTATE 81

(NEW) Mile marker 237 to 264, northbound and southbound – Watch for crews removing debris, repairing slopes and fences.  Pothole repairs as needed.  Monday to Friday, 7:30 a.m. to 4 p.m.

(NEW) Mile marker 243 to 239, southbound – Right shoulder closures for utility work. Monday to Friday.

Mile marker 245 to 237, southbound – Fiber optic installation through early May. Be alert for shoulder closures. Future phases continuing south through September 30, 2016.

 

PRIMARY ROADS

(UPDATE) Route 11 (Lee Highway) – Replacement of North River bridge.  Watch for traffic shifts, right shoulder closures and flagger controlled intermittent lanes closures, 7 a.m. to 5:30 p.m. Work zone from Route 694 to one mile south of Mount Crawford.  Variable message boards and pavement markings direct motorists. Estimated completion July 2017.

Route 253 (Port Republic Road) – Periodic flagging for tree removal and pipe installation as part of intersection improvements at Route 340 (East Side Highway).  Monday to Friday, 8 a.m. to 4 p.m.  Estimated project completion October 2016.

Route 340 (East Side Highway) – Periodic flagging for tree removal and pipe installation as part of intersection improvements at Route 253/659  (Port Republic Road). Monday to Friday, 8 a.m. to 4 p.m.  Estimated project completion October 2016.

 

SECONDARY ROADS

(UPDATE) Route 628 (Beldor Road) – Stop-and-proceed work zone with a lane restriction of 10 feet during bridge deck replacement. Work zone is 2.33 miles south of Route 33. Estimated completion May 13.

Route 659 (Port Republic Road) – Periodic flagging for tree removal and pipe installation as part of intersection improvements at Route 340.  Monday to Friday, 8 a.m. to 4 p.m.  Estimated project completion October 2016.

Route 704 (Cecil Wampler Road) – Flagger controlled, intermittent shoulder and lane closures for installation of water lines. Monday through Friday, 8 a.m. to 5p.m. Work zone between I-81 and Route 679 (Pleasant Valley Road).  Estimated completion April 30.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday to Friday.

 

 

PAGE COUNTY

PRIMARY ROADS

(NEW)  Route 211, westbound –Single lane closure 24/7 for bridge deck repairs over Shenandoah River between Route 646 and Route 615. Estimated completion June 3.

(NEW) Route 340 – Flagger controlled lane closure for paving operations from Route 614 (Shuler Lane) to west of Route 622 (Pond Avenue).  7 a.m. to 7 p.m.  Estimated completion April 30.

 

SECONDARY ROADS

No lane closures reported.

 

 

SHENANDOAH COUNTY

INTERSTATE 81

(NEW) Mile marker 264 to 300, northbound and southbound – Watch for crews removing debris, repairing fences.  Pothole repairs as needed.  Monday to Friday, 7:30 a.m. to 4 p.m.

 

PRIMARY ROADS

No lane closures reported.

 

SECONDARY ROADS

Route 725 (Morning Star Road, Mount Jackson area) –  Road closed from 0.46 miles south of Route 262 (Orkney Grade) to 2.67 miles north of Route 726 (Hepner Road) for bridge replacement.  Follow posted detours.  Estimated completion May 13.

Queen Street (Route 1201, Town of Strasburg) – Road closed to through traffic between South Massanutten Street and Holiday Street for a bridge replacement over Town Run. Detour in place. Estimated completion November 2016.

Various roads – Patching, Monday to Friday. Flagger traffic control as needed.

Various roads – Utility tree trimming.  Flagger control during daylight hours. Monday to Friday.

 

 

FREDERICK COUNTY

INTERSTATE 66

No lane closures reported.

 

INTERSTATE 81

(NEW) Mile marker 299, northbound – Nighttime single lane closure Sunday night through Friday morning, 8 p.m. to 7 a.m., for bridge deck repairs over Cedar Creek.  Estimated completion June 3.

(NEW) Mile marker 300 to 324, northbound and southbound – Watch for crews removing debris, brush cutting and crack sealing.  Pothole repairs as needed.  Monday to Friday, 7:30 a.m. to 4 p.m.

Mile marker 309 to 311, northbound and southbound – Right and left shoulders closed 24/7. Speed limit of 60 miles per hour throughout the work zone until completion of the exit 310 construction project. Limited space for traffic to merge onto southbound I-81 due to shortened on-ramp.  Motorists should also be alert for trucks entering and exiting work zone.  Estimated project completion May 2018.

(NEW) Various locations, northbound and southbound – Nighttime lane closures as needed for bridge inspections.

 

PRIMARY ROADS

(NEW) Route 11 (Martinsburg Pike) in Stephenson area – Nighttime turn lane restricted to 10 feet from Route 839 (Amoco Lane) to I-81 southbound on-ramp from 9 p.m. April 26 until 5 a.m. April 29. Crews will be performing drainage, curb and gutter work.

Route 37, southboundOff-ramp at Winchester Medical Center closed for interchange reconstruction.  Southbound Route 37 drivers can use Route 50 to access the medical center.  Estimated completion April 29.

Route 37 at I-81 Exit 310 (Kernstown Interchange), northbound and southbound Be alert for construction activity at exit 310 interchange and intersections of Tasker Road (Route 642) and Hillandale Drive (Route 847). Part of interchange reconstruction scheduled for completion in May 2018.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 26-29 at various hours and locations.

(NEW) Various roads – Watch for daytime line painting various days, locations and times.

 

SECONDARY ROADS

(NEW) Route 601 (Blue Ridge Mountain Road) – Flagger controlled lane closure for paving operations. 7 a.m. to 7 p.m.  Estimated completion April 30.

Route 642 (Tasker Road, Kernstown Interchange)  – Flagger controlled single lane traffic Monday through Friday, 9 a.m. to 3:30 p.m. daily, in the area of County Sanitation Authority facility for construction of tie-in of new road to existing road.  Northbound 24/7 right shoulder closures from existing intersection with Route 37 to 0.44 miles south of intersection as part of I-81 exit 310 interchange project. Estimated project completion May 2018.

Route 847 (Hillandale Lane, Kernstown Interchange) – Northbound 24/7 right shoulder closures from existing intersection with Route 37 to 0.31 miles north of intersection as part of I-81 exit 310 Interchange Project. Work performed Monday through Friday 7 a.m. to 4:30 p.m. Estimated project completion May 2018.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 26-29 at various hours and locations.

(NEW) Various roads – Watch for daytime line painting various days, locations and times.

(NEW) Various roads – Crack sealing and shoulder work, Monday to Friday. Flagger traffic control as needed.

Various roads – Utility tree trimming. Flagger control during daylight hours.  Monday to Friday.

 

 

CLARKE COUNTY

PRIMARY ROADS

Route 7, eastbound – Lane and shoulder closures as needed for the installation of communication utilities from Shenandoah River to Loudoun County line.  Monday – Friday, 9 a.m. to 5 p.m. Estimated completion is April 29.

 

SECONDARY ROADS

No lane closures reported.

 

 

WARREN COUNTY

INTERSTATE 66

(NEW) Mile marker 0 to 15, westbound and eastbound – Watch for crews removing debris and crack sealing.  Pothole repairs as needed.  Monday to Friday, 7:30 a.m. to 4 p.m.

(UPDATE) Mile marker 6 to 14, eastbound and westbound – Alternating right and left shoulder closures for bridge painting.  7 a.m. to 7 p.m.  Estimated completion May 20.

 

INTERSTATE 81
No lane closures reported.

 

PRIMARY ROADS

Route 55 (Strasburg Road) – Intersection modification at Route 340/522 (Shenandoah Avenue/Winchester Road). Lane closures as needed Monday to Friday, 9 a.m. to 3 p.m. daily and 9 p.m. to 7 a.m. nightly. Temporary traffic signal at 55/340/522 intersection, and lane shift from 340/522 to Forest Hill Drive. Changes in effect through summer 2016 for construction of new travel lanes. Estimated project completion December 2017.

Route 340/522 (Shenandoah Avenue/Winchester Road) – South Fork bridge replacement and intersection modification at Route 55 (Strasburg Road).  Lane closures as needed Monday to Friday, 9 a.m. to 3 p.m. daily and 9 p.m. to 7 a.m. nightly.  Lane shift at 17th street and temporary traffic signal at 340/522/55 intersection, placing all traffic on the newly constructed bridge. 18th street is open to traffic, with left turn restrictions until summer 2017.  Estimated project completion December 2017.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 25-29 at various hours and locations.

 

SECONDARY ROADS

Route 624 (Morgan Ford Road) – Road closed for bridge replacement over the Shenandoah River. Work zone from Route 643 (Howellsville Road) to Route 661 (Fairground Road).  Detours:  Drivers south of the bridge will turn right on Route 643 (Howellsville Road), which changes to Route 603 and then to Route 638 in Clarke County. Drivers will then turn left on Route 17/50 (John Mosby Highway) and left on Route 624 (Red Gate Road/Milldale Road) to reach the end of the detour. Drivers north of the bridge will follow Route 624 (Milldale Road/Red Gate Road) north and turn right on Route 17/50 (John Mosby Highway) in Clarke County. Drivers will then turn right on Route 638 (Howellsville Road), which changes to Route 603 and then Route 643, to reach the end of the detour.  Estimated project completion June 2018.

(NEW) Various roads – Watch for daytime traffic signal maintenance work April 25-29 at various hours and locations.

(NEW) Various roads – Ditching and sweeping intersections, Monday to Friday. Flagger traffic control as needed.

Various roads – Utility tree trimming.  Flagger control during daylight hours.  Monday to Friday.

 

Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.

Traffic alerts and traveler information can be obtained by dialing 511 and at 511Virginia.org. For other assistance call the VDOT Customer Service Center 24 hours a day, seven days a week. Dial 1-800-FOR-ROAD(1-800-367-7623) from anywhere in the state to report road hazards, ask transportation questions, or get information related to Virginia’s roads.

The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr, Twitterand YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located atwww.VirginiaDOT.org.

Contributors

Contributors

Have a guest column, letter to the editor, story idea or a news tip? Email editor Chris Graham at [email protected]. Subscribe to AFP podcasts on Apple PodcastsSpotifyPandora and YouTube.